Back to Top


Search

Corrigendum
Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Corrigendum
481 KTPS/10930 WBPDCL/Tend-Adv/CC/15-16/85/KTPS ARC for transportation of empty H2 gas cylinders from KTPS to Ranchi and filled H2 Cylinders from Ranchi to KTPS along with loading & unloading at both end under S&P wing of KTPS. 17-07-2015 22-07-2015 Download Corrigendum
482 SgTPP/10942 SgTPP/C-OPH/TENDER/038/5756 Extension of date of Development of pond including modification and beautification of surrounding area of pond at ‘B’ type complex of SgTPP 20-07-2015 22-07-2015 Download Corrigendum
483 STPS/10933 STPS/M&C/Tend-Adv/611/C&I/15-16/1179/279 FLANGED ELECTRODE CODUCTIVITY PROBE WITH SS316L GRAPHOIL FILLED SPIRAL WOUND METAFLEX GASKET, FOR 16 PORT DRUM ELECTRONIC WATER LEVEL INDICATOR BHEL VISION 20M . OPERATING PRESSURE 207 KG/CM2 , TEMPERATURE 368 DEGC. SUITABLE FOR 250 MW FOSSIL FUEL FIRED BOILER . Electrode body material: Martensitic stainless steel to Firth Vickers specification FV520(B)/SA276 type 410. Centre stud material: IMI titanium. Brazing: With special brazing foil in closely controlled vacuum furnace. Make: BHEL/LEVELSTATE. 17-07-2015 23-07-2015 Download Corrigendum
484 BkTPP/10926 WBPDCL/Tend-Adv/CC/15-16/81/BkTPP Extension of The Date of Sale of Tender Paper for NIT published in this newspaper vide abovementioned NIT No. for (Job-I): ‘Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 5 of BkTPP’; (Job-II): ‘Restoration of ESP Field 1B1, 1B2 & 2B2 of Unit # 5, BkTPP’ 17-07-2015 29-07-2015 Download Corrigendum
485 BkTPP/10905 WBPDCL/Tend-Adv/CC/15-16/72/BkTPP Extension of The Date of Sale of Tender Paper for NIT published in this newspaper vide abovementioned NIT No. for (Job-II): ‘Supply of 01 No. Circuit Breaker Analyser for 415V-400KV Circuit Breaker at Bakreswar Thermal Power Project’ 17-07-2015 31-07-2015 Download Corrigendum
486 BkTPP/10905 WBPDCL/Tend-Adv/CC/15-16/72/BkTPP Extension of the last date of sale of tender paper for NIT published in this newspaper vide abovementioned NIT No. for (Job-II): ‘Supply of 01 No. Circuit Breaker Analyser for 415V-400KV Circuit Breaker at Bakreswar Thermal Power Project’. 17-07-2015 31-07-2015 Download Corrigendum
487 STPS/10911 STPS /M&C /Tender /14-15/OPH (E/M) /99 / 255 Replacement of 11KV power cables along with supply of end termination kits at all substations of STPS Township 07-07-2015 10-07-2015 Download Corrigendum
488 BkTPP/10865 WBPDCL/Tend-Adv/CC/15-16/43/BkTPP Tender Notice for Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 4 of BkTPP. 07-07-2015 09-07-2015 Download Corrigendum
489 STPS/10912 STPS / M&C / Tender / OPH (E/M) / E1 – 366 / 15 / Rate Contract / 256 Annual Rate Contract for maintenance of Air Condition machines at both STPS Plant & Township under the maintenance scope of OPH (EM) Dept. STPS. 03-07-2015 09-07-2015 Download Corrigendum
490 STPS/10898 WBPDCL/Tend-Adv/CC/15-16/66/STPS Execution Order for Overhauling Job for different 415V AC L.T. Motors related with Unit#5 of AHP (E/M) and OPH (E/M) Dept. STPS. 29-06-2015 03-07-2015 Download Corrigendum
491 CORP/10856 WBPDCL/Tend-Adv/CC/15-16/34/Corp. Design, engineering, supply, transport, storage, insurance, erection, testing and commissioning of complete Hydrogen Generation Plant Package along with associated Electrical System, Control & Instrumentation System, HVAC System for SgTPP extn.#3&4. 03-07-2015 06-07-2015 Download Corrigendum
492 STPS/10894 STPS/SM/M&C/CIVIL/15-16/224/227 Repairing of bituminous road from plant main gate to vacuum pump house #5 of STPS 01-07-2015 06-07-2015 Download Corrigendum
493 STPS/10875 STPS / M&C / Tender / CHP (E) / E1 – 185 / 15/ Rate Contract / 209 Annual Rate Contract for maintenance of illumination system along with other Electrical Works under CHP (E) Dept., Santaldih T.P.S. 03-07-2015 10-07-2015 Download Corrigendum
494 CORP/10818 WBPDCL/Tend-Adv/CC/15-16/10/CORP Supply, Installation & Implementation of and Support for Enterprise Resource Planning (ERP) Solution in the WBPDCL 27-04-2015 30-06-2015 Download Corrigendum
495 CORP/10818 WBPDCL/Tend-Adv/CC/15-16/10/CORP Supply, Installation & Implementation of and Support for Enterprise Resource Planning (ERP) Solution in the WBPDCL 27-04-2015 30-06-2015 Download Corrigendum
496 SgTPP/10774 WBPDCL/Tend-Adv/CC/14-15/226/SgTPP WBPDCL/SGTPP/NIT/E1001/14-15 The Notice Inviting E-Tender published in this newspaper on 12.03.2015 vide above mentioned NIT No. for ‘Procurement of Bulk Acid Tanks (BAT) for HCL & H2SO4 storage for DM Plant, CPU and CW Acidulation system for Sagardighi Thermal Power Project, WBPDCL’, stands cancelled due to unavoidable circumstances. Download Corrigendum
497 STPS/10881 WBPDCL/Tend-Adv/CC/15-16/52/STPS Overhauling Job of different 6.6 KV H.T. Motors related with Unit#5 under maintenance scope of IPH (E/M) Dept. STPS 08-06-2015 16-06-2015 Download Corrigendum
498 CORP/10856 WBPDCL/Tend-Adv/CC/15-16/34/Corp. Design, engineering, supply, transport, storage, insurance, erection, testing and commissioning of complete Hydrogen Generation Plant Package along with associated Electrical System, Control & Instrumentation System, HVAC System for SgTPP extn.#3&4. 19-06-2015 22-06-2015 Download Corrigendum
499 STPS/10898 WBPDCL/Tend-Adv/CC/15-16/66/STPS Execution Order for Overhauling Job for different 415V AC L.T. Motors related with Unit#5 of AHP (E/M) and OPH (E/M) Dept. STPS. 16-06-2015 23-06-2015 Download Corrigendum
500 STPS/10872 STPS/M&C/Tend-Adv/592/IT/14-15/ 204 Procurement of Different types of Printer Cartridges under IT Dept., STPS. 16-06-2015 24-06-2015 Download Corrigendum
501 BkTPP/10865 WBPDCL/Tend-Adv/CC/15-16/43/BkTPP Tender Notice for Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 4 of BkTPP. 19-06-2015 24-06-2015 Download Corrigendum
502 KTPS/10889 WBPDCL/Tend-Adv/CC/15-16/58/KTPS Annual Contract for performance monitoring and observation of all 6 ESPs 6 x 210MW Units of Kolaghat Thermal Power Station. 16-06-2015 24-06-2015 Download Corrigendum
503 STPS/10884 WBPDCL/Tend-Adv/CC/15-16/55/STPS Execution Order for Overhauling Job for different 415V A.C L.T. Motors related with Unit#5 under maintenance scope of IPH (E/M) Dept. STPS. 10-06-2015 18-06-2015 Download Corrigendum
504 BkTPP/10879 WBPDCL/Tend-Adv/CC/15-16/53/BkTPP BkTPP/CC/U#1/OH-01/0713/5709 The NIT published in this newspaper on 13.04.2015 vide above mentioned NIT No. for ‘Unit # 1 Boiler Overhauling such as Boiler Pressure Parts, Tubular Air Pre-Heater, Coal Burners, High Pressure Valves, Safety Valves, SADC, Soot Blowers etc. of BHEL make Corner Fired 210 MW Boiler of BkTPP’, stands cancelled due to unavoidable circumstances. General Manager, BkTPP Download Corrigendum
505 STPS/10881 WBPDCL/Tend-Adv/CC/15-16/52/STPS Overhauling Job of different 6.6 KV H.T. Motors related with Unit#5 under maintenance scope of IPH (E/M) Dept. STPS 08-06-2015 16-06-2015 Download Corrigendum
506 CORP/10844 WBPDCL/Tend-Adv/CC/15-16/27/Corp. Supply,Installation, Testing & Commissioning of Air Conditioning System of control room and associated areas of BTPS, Unit-5, using Vapour Absorption Machine (VAM) chillers 14-06-2015 15-06-2015 Download Corrigendum
507 BkTPP/10835 WBPDCL/Tend-Adv/CC/15-16/18/BkTPP Tender document for Procurement of 01 No. Dual Source 3 Phase Secondary Voltage & Current Injection Kit for Testing of Relays, Transducers & Calibration of Meters at Bakreswar Thermal Power Project. 12-06-2015 03-07-2015 Download Corrigendum
508 CORP/10818 WBPDCL/Tend-Adv/CC/15-16/10/CORP Supply, Installation & Implementation of and Support for Enterprise Resource Planning (ERP) Solution in the WBPDCL 23-06-2015 Download Corrigendum
509 CORP/10844 WBPDCL/Tend-Adv/CC/15-16/27/Corp. Supply,Installation, Testing & Commissioning of Air Conditioning System of control room and associated areas of BTPS, Unit-5, using Vapour Absorption Machine (VAM) chillers Note : Tender submission date extended from 05.06.2015 to 15.06.2015 04-06-2015 15-06-2015 Download Corrigendum
510 STPS/10831 WBPDCL/Tend-Adv/CC/15-16/19/STPS STPS / M&C / Press Tender / T&A / M2-381 / 15 /163 ARC for Maintenance of Cooling Tower along with CT Fans of 2 X 250 MW unit of STPS, WBPDCL under M/M(T&A) Deptt 04-06-2015 09-06-2015 Download Corrigendum
511 STPS/10830 STPS/M&C/Tend-Adv./Misc/M.O/E2-86 (Vol-III)/15-16/ARC/162 Annual Rate Contract for supply of Gas for refilling of empty gas cartridges / Cylinder for Firefighting System, as per Job Description. 05-06-2015 17-06-2015 Download Corrigendum
512 STPS/10815 WBPDCL/Tend-Adv/CC/15-16/06/STPS STPS/M&C/Press Tender/439/EM(OPH)/13-14/125 Procurement of 245 kV & 145 kV Current Transformers under EM(OPH) Dept., Santaldih T.P.S. 09-06-2015 15-06-2015 Download Corrigendum
513 STPS/10836 WBPDCL/Tend-Adv/CC/15-16/22/STPS Caustic Soda, Flakes specification ‘IS 252 of 1973 NaOH content 99.5% 03-06-2015 10-06-2015 Download Corrigendum
514 STPS/10838 STPS/M&C/Tender/435/EM(OPH)/14-15/172 procurement of Air Conditioning Machines under EM(OPH) Dept., Santaldih T.P.S. 04-06-2015 10-06-2015 Download Corrigendum
515 CORP/10818 WBPDCL/Tend-Adv/CC/15-16/10/CORP Supply, Installation & Implementation of and Support for Enterprise Resource Planning (ERP) Solution in the WBPDCL 27-04-2015 23-06-2015 Download Corrigendum
516 BkTPP/10865 WBPDCL/Tend-Adv/CC/15-16/43/BkTPP Tender Notice for Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 4 of BkTPP. 29-05-2015 03-06-2015 Download Corrigendum
517 BkTPP/10847 WBPDCL/Tend-Adv/CC/15-16/30/BkTPP Overhauling of Boiler & Boiler Pressure Parts, Rotary Air Pre-Heater, Coal Burners, High Pressure Valves, Safety Valves, SADC, Soot Blowers etc. of BHEL make Corner Fired 210 MW Boiler of Unit # 4 BkTPP. 28-05-2015 02-06-2015 Download Corrigendum
518 CORP/10828 WBPDCL/Tend-Adv/CC/15-16/15/Corp. Description of the Manpower to be deployed:- Sl.no.(1) Guest House Supervisor (Male) - 01 Sl.No.(2) Guest House Attendant–cum-Helper (Male) - 04 Sl.no.(3) Karmibandhu-(Male) - 02 02-06-2015 03-06-2015 Download Corrigendum
519 CORP/10856 WBPDCL/Tend-Adv/CC/15-16/34/Corp. Design, engineering, supply, transport, storage, insurance, erection, testing and commissioning of complete Hydrogen Generation Plant Package along with associated Electrical System, Control & Instrumentation System, HVAC System for SgTPP extn.#3&4. 22-05-2015 09-06-2015 Download Corrigendum
520 CORP/10856 WBPDCL/Tend-Adv/CC/15-16/34/Corp. Design, engineering, supply, transport, storage, insurance, erection, testing and commissioning of complete Hydrogen Generation Plant Package along with associated Electrical System, Control & Instrumentation System, HVAC System for SgTPP extn.#3&4. 22-05-2015 09-06-2015 Download Corrigendum