Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Corrigendum
521 CORP/10706 WBPDCL/Tend-Adv/CC/14-15/174/Corp. WBPDCL/CORP/NIT/E1013/14-15 Supply, installation & commissioning of Occupancy sensor for efficient illumination control at WBPDCL, Corporate office Chamber, Kolkata-98 11-02-2015 Download Corrigendum
522 STPS/10678 STPS/Tend-Adv/Fine chemicals/406/chem/14-15/390 Procurement of Fine chemicals & apparatus under chemicals dept. S.T.P.S. as per enclosed Item List. 22-01-2015 29-01-2015 Download Corrigendum
523 CORP/10663 WBPDCL/Tend-Adv/CC/14-15/139/Corp. Renewing of existing Plant Boundary Wall by RCC Column & Beam Frame Structure with RCC Panel Wall etc. at STPS, Dist‐ Purulia, west Bengal. 22-01-2015 13-02-2015 Download Corrigendum
524 SgTPP/10672 WBPDCL/Tend-Adv/CC/14-15/145/SgTPP Operation of Condensate Polishing Unit (CPU) of SgTPP. 15-01-2015 28-01-2015 Download Corrigendum
525 STPS/10679 STPS/M&C/Tender/412/EM(OPH)/14-15/392 Isolator, TPGO Isolator complete with all components, 33 KV, 3 Phase, 400 Amps, 22 KV Double Stack, Outdoor Type. 21-01-2015 28-01-2015 Download Corrigendum
526 STPS/10667 STPS/Tend-Adv/Tyre Tubes/404/WS/14-15/381 Procurement of Tyre-Tubes of heavy & Fire vehicles under workshop dept. S.T.P.S. as per enclosed Item List. 15-01-2015 21-01-2015 Download Corrigendum
527 STPS/10666 STPS/Tend-Adv/pipes & fittings/405/C&I/14-15/333 Procurement of MS pipes & fittings required for C & I department of STPS as per enclosed Item List. 15-01-2015 22-01-2015 Download Corrigendum
528 CORP/10692 WBPDCL/Tend-Adv/CC/14-15/163/Corp. WBPDCL/Tend-Adv/CC/14-15/163/Corp. Supply, Erection & Commissioning of hydraulic Crane with grabbing attachment at Wagon Tippler at KTPS, WBPDCL 05-01-2015 27-01-2015 Download Corrigendum
529 SgTPP/10641 WBPDCL/EOI-Adv/CC/14-15/122/SgTPP SgTPP/WBPDCL/EOI-ADV/PR/14-15/10230 Design, Manufacture & supply of 300MW Generator Rotor for SgTPP 30-01-2015 Download Corrigendum
530 BkTPP/10662 WBPDCL/Tend-Adv/CC/14-15/140/BkTPP BKSR/CC/AMC-15/0833C/15270 Annual Maintenance Contract for Operation & Maintenance of HME Section and AC Ambulance of BkTPP. 05-01-2015 09-01-2015 Download Corrigendum
531 CORP/10660 WBPDCL/Tend-Adv/CC/14-15/137/Corp. Taking delivery of Dry fly Ash from the silos of Santaldih Thermal Power Project, WBPDCL. 26-12-2014 13-01-2015 Download Corrigendum
532 STPS/10644 WBPDCL/Tend-Adv/CC/14-15/124/STPS Deployment of 70 (seventy) nos. contractor workers and one supervisor for providing services to various departments at STPS 31-12-2014 13-01-2015 Download Corrigendum
533 BkTPP/10642 WBPDCL/Tend-Adv/CC/14-15/121/BkTP Annual Maintenance Contract for Periodic, Preventive, Running & Breakdown Maintenance of Cranes & Hoists in Boiler, Turbine & Ash Handling Plant area of BkTPP 24-12-2014 02-01-2015 Download Corrigendum
534 CORP/10664 WBPDCL/EOI-Adv/CC/14-15/138/Corp. auction for allocation of Coal Blocks as per Coal Mines (Special Provision) ordinance 2014 dated 21.10.14 Pre-bid meeting MOM and Financial bid format 03-12-2014 18-12-2014 Download Corrigendum
535 CORP/10663 WBPDCL/Tend-Adv/CC/14-15/139/Corp. Renewing of existing Plant Boundary Wall by RCC Column & Beam Frame Structure with RCC Panel Wall etc. at STPS, Dist‐ Purulia, west Bengal. 18-12-2014 14-01-2015 Download Corrigendum
536 BkTPP/10643 WBPDCL/Tend-Adv/CC/14-15/125/BkTPP WBPDCL/BkTPP/NIT/E1003/14-15 Supply of Different Power & Control Cables 23-12-2014 Download Corrigendum
537 BkTPP/10643 WBPDCL/Tend-Adv/CC/14-15/125/BkTPP WBPDCL/BkTPP/NIT/E1003/14-15 Supply of Different Power & Control Cables 23-12-2014 Download Corrigendum
538 CORP/10623 WBPDCL/Tend-Adv/CC/14-15/109/Corp. Bi-Annual Civil Maintenance of Bidyut Unnayan Bhaban, WBPDCL Corporate Office Complex, Salt Lake City, Kolkata-700098. 09-12-2014 15-12-2014 Download Corrigendum
539 STPS/10637 WBPDCL/Tend-Adv/CC/14-15/118/STPS Annual Civil maintenance of different type Quarters with minor civil & structural works at STPS (T/S) Gr.1’ 13-12-2014 17-12-2014 Download Corrigendum
540 STPS/10659 WBPDCL/Tend-Adv/CC/14-15/136/STPS STPS/GM/DGM(HR&A)/921 CANCELLATION OF TENDER The NIT No.: WBPDCL/Tend-Adv/CC/14-15/136/STPS, Dated: 21.11.2014, published on 21.11.2014 in tender portal of www.wbpdcl.co.in for the job of “Operation and Maintenance of Industrial Relation Management System, Material Tracking System and Issuance of Visitor Photo Gate Pass and Vehicle Pass at Santaldih Thermal Power Station” stands cancelled due to unavoidable circumstances. 10-12-2014 17-12-2014 Download Corrigendum
541 SgTPP/10586 WBPDCL/Tend-Adv/CC/14-15/85/Corp. Construction of 33 blocks of 3 storied B type and 10 blocks of 3 storied C type residential buildings for unit 3 & 4 (2 x 500 MW) in phase–II extension project, at SgTPP Township. 08-12-2014 10-12-2014 Download Corrigendum
542 BkTPP/10638 WBPDCL/Tend-Adv/CC/14-15/119/BkTPP Air Heater Tube (63.5 ODX 2.08t X 7222l) mm. Material: As per BS 6323 PART-V-1982, GRADE-ERW, II Latest. 10-12-2014 18-12-2014 Download Corrigendum
543 STPS/10598 STPS/Tend-Adv/Cables/372/C&I/14-15/278 Procurement of cables and net work accessories required for C & I department of STPS as per enclosed Item List. 28-11-2014 04-12-2014 Download Corrigendum
544 SgTPP/10586 WBPDCL/Tend-Adv/CC/14-15/85/Corp. 1. Construction of 33 blocks of 3 storied B type residential buildings having 2 units at each floor of approx. 79 m2 plinth area for each unit. 2. Construction of 10 blocks of 3 storied C type residential buildings having 2 units at each floor of approx. 108 m2 plinth area for each unit. 21-11-2014 25-11-2014 Download Corrigendum
545 STPS/10608 WBPDCL/Tend-Adv/CC/14-15/98/STPS STPS /M&C/ CHP(M) / M1–278/14-15 /Annual Con. Cleaning / 296 Annual Job Contract for Annual Job Contract for Cleaning of the “Zone After Crusher to Bunker “ (All Conveyor belts and associated areas etc.) of Coal Handling Plant under CHP(Operation) dept., STPS. 21-11-2014 26-11-2014 Download Corrigendum
546 STPS/10615 WBPDCL/Tend-Adv/CC/14-15/104/STPS STPS / M&C / Press Tender / T&A / M2-377 / 14 /310 Overhauling / Repairing of BFP Cartridge, Model: FK-6D-30 for 250MW Unit, STPS 24-11-2014 28-11-2014 Download Corrigendum
547 STPS/10615 WBPDCL/Tend-Adv/CC/14-15/104/STPS STPS / M&C / Press Tender / T&A / M2-377 / 14 /310 Overhauling / Repairing of BFP Cartridge, Model: FK-6D-30 for 250MW Unit, STPS 24-11-2014 28-11-2014 Download Corrigendum
548 STPS/10607 WBPDCL/Tend-Adv/CC/14-15/97/STPS STPS/M&C/Press Tender/CHP/E1-184/14/299 Annual Job Contract for the job of Round the Clock Operation of Two (02) nos. Paddle Feeder with the help of 12 nos. of Skilled workers, under CHP(Operation) Dept. , STPS . 24-11-2014 27-11-2014 Download Corrigendum
549 STPS/10607 WBPDCL/Tend-Adv/CC/14-15/97/STPS STPS/M&C/Press Tender/CHP/E1-184/14/299 Annual Job Contract for the job of Round the Clock Operation of Two (02) nos. Paddle Feeder with the help of 12 nos. of Skilled workers, under CHP(Operation) Dept. , STPS . 24-11-2014 27-11-2014 Download Corrigendum
550 BkTPP/10618 WBPDCL/Tend-Adv/CC/14-15/105/BkTPP BKSR/CC/AMC-16/0913C/13368 The NIT published in this newspaper on 14.10.2014 vide above mentioned NIT No. for ‘Annual Maintenance Contract for Electrical Maintenance work of inside power house area (Unit # 1 to 5) of BkTPP’, stands cancelled due to unavoidable circumstances. 28-10-2014 07-11-2014 Download Corrigendum
551 CORP/10623 WBPDCL/Tend-Adv/CC/14-15/109/Corp. Bi-Annual Civil Maintenance of Bidyut Unnayan Bhaban, WBPDCL Corporate Office Complex, Salt Lake City, Kolkata-700098. 17-11-2014 24-11-2014 Download Corrigendum
552 STPS/10616 STPS/GM/CIVIL/IPH/TEN/14-15/563 Cleaning with removal of coal, coal-dust, rejection coal, scraped materials, deposited mixed earth, garbage, foreign materials and transportation of same from mill areas of Power House of Unit #5 & #6 to disposal yard of STPS. 21-11-2014 26-11-2014 Download Corrigendum
553 BkTPP/10596 WBPDCL/Tend-Adv/CC/14-15/89/BkTPP WBPDCL/BkTPP/NIT/E1002/14-15 Supply of Rail Pole Required for 33 KV Overhead Transmission Line 25-10-2014 Download Corrigendum
554 CORP/10613 WBPDCL/Tend-Adv/CC/14-15/102/Corp. Evacuation of settled ash from the ash pond in operation, transportation and disposal in eco-friendly manner from Bakreswar Thermal Power Station at Dist. Birbhum, West Bengal’ 22-10-2014 07-11-2014 Download Corrigendum
555 SgTPP/10564 WBPDCL/Tend-Adv/CC/14-15/68/SgTPP Manufacturing, supply and delivery of grinding rollers and table liners sets of coal mill ZGM 123N for 300 MW China make Boiler at SgTPP. 24-10-2014 19-11-2014 Download Corrigendum
556 SgTPP/10560 WBPDCL/Tend-Adv/CC/14-15/65/SgTPP Supply & delivery of 220KV CURRENT TRANSFORMER 22-10-2014 12-11-2014 Download Corrigendum
557 STPS/10598 STPS/Tend-Adv/Cables/372/C&I/14-15/278 Procurement of cables and net work accessories required for C & I department of STPS as per enclosed Item List. 17-10-2014 23-10-2014 Download Corrigendum
558 STPS/10574 STPS/M&C/Tender/263/EM(OPH)/13-14/253 Self Supporting Tower Extension Ladder 27-10-2014 31-10-2014 Download Corrigendum
559 CORP/10579 WBPDCL/Tend-Adv/CC/14-15/79/Corp WBPDCL/M&C/NIT/S24/228 Non-comprehensive Bi-annual Operation & Maintenance Contract of HT & LT Electrical system at WBPDCL, Corporate Office, Kolkata-700098 21-10-2014 28-10-2014 Download Corrigendum
560 STPS/10572 STPS/M&C/ Tender/ 275 / EM(IPH) /13 - 14/ 241 Procurement of different electrical measuring instruments for day to day maintenance under EM(IPH) Dept., Santaldih T.P.S. 21-10-2014 28-10-2014 Download Corrigendum