Back to Top


Search

Corrigendum
Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Corrigendum
641 STPS/10329 WBPDCL/Tend-Adv/CC/13-14/159/STPS STPS / M&C / Press Tender / AHP (M) / M2 – 15 / 13 / OH /122, For “Overhauling of Ash handling plant of unit #6 under AHP dept. STPS as per ‘Scope of Work’ and ‘Terms & Conditions’ as stipulated in the Tender Documents”. 24-01-2014 06-02-2014 Download Corrigendum
642 BkTPP/10312 WBPDCL/Tend-Adv/CC/13-14/145/BKTPP BKSR:PUR-III/13-14/11400/ For “Procurement of 10E 10 Coal Mill Grinding Elements at Bakreswar Thermal Power Project for 210 MW Capacity”. 20-01-2014 27-01-2014 Download Corrigendum
643 BkTPP/10256 WBPDCL/EOI-Adv/CC/13-14/105/BkTPP “Repairing and O/H Job of Locomotive -26 at Bk.TPP”. 17-03-2014 Download Corrigendum
644 STPS/10310 WBPDCL/Tend-Adv/CC/13–14/143/STPS STPS/M&C/Press Tender/OPH (E)/E1 –355/13/Overhauling Job/105 For “Execution Order for Overhauling Job for different 415V AC & 220V DC L.T. Motors related with Unit #6 under maintenance scope of both OPH (E/M) and IPH (E/M) Dept. STPS”. 24-01-2014 13-02-2014 Download Corrigendum
645 STPS/10328 WBPDCL/Tend-Adv/CC/13-14/158/STPS STPS/M&C/Press Tender/AHP(E)/E1-02/13/Overhauling Job/ For (Job-I) “Execution Order for complete Overhauling of ESP (Electrostatic Precipitator) of Unit # 6 under AHP (E/M) Dept. STPS”, (Job-II) “Execution Order for Rectification of Oil Leakages, Oil Filtration and Tit – Bit Maintenance Jobs of 315 MVA, 235/16.5 KV GT# 6 and 20 MVA, 16.5/6.9 KV UAT # 6A & 6Bduring U # 6 Overhauling under maintenance scope of OPH (E/M) Dept. STPS”. 22-01-2014 05-02-2014 Download Corrigendum
646 STPS/10304 WBPDCL/Tend-Adv/CC/13-14/139/STPS STPS / M&C / Press Tender / B&A / M2 – 512 / 13 / OH /93, For “Overhauling of Boiler Pressure Parts, HP Valves, Duct, Damper and Fans of unit#6 under B&A dept. STPS as per ‘Scope of Work’ and ‘Terms & Conditions’ as stipulated in the Tender Documents”. 20-01-2014 22-01-2014 Download Corrigendum
647 BkTPP/10321 WBPDCL/Tend-Adv/CC/13-14/152/BKTPP BKSR/CC/AMC: 10/ 01032/13855 For ‘Annual Service Maintenance of Mill rejection of Stage-II Unit # 4 & 5 & Soot Blowing of all Unit(Unit # 1 to 5) of BHEL make Corner Fired 210 MW Boiler of Bakreswar Thermal Power Project’. 15-01-2014 20-01-2014 Download Corrigendum
648 SgTPP/10323 Sg.T.P.P./Tender/HR&A/Printing/11994 For the Printing and supply of stationery items. 06-01-2014 06-01-2014 Download Corrigendum
649 BTPS/10282 WBPDCL/Tend-Adv/CC/13-14/121/BTPS GM(B)/CL-33/2013-14/104 For “Repairing/Renovation/Construction of new watch tower and erection of ‘Y’ shaped barbed wire on the boundary wall etc”. 02-01-2014 03-01-2014 Download Corrigendum
650 BTPS/10254 WBPDCL/Tend-Adv/CC/13-14/103/BTPS GM (B)/CL-26/2013-14/89 For “ARC for Various civil jobs for the year 2013-14 under Plant Site Civil at BTPS”. 02-01-2014 03-01-2014 Download Corrigendum
651 BTPS/10253 WBPDCL/Tend-Adv/CC/13-14/102/BTPS GM(B)/CL-25/2013-14/86 For (Job-I) “Removal of small coal boulders generated by the picker boys, Removal of big stone boulder from wagon tippler, Removal of garbage’s and Ash from different points of plant area at BTPS for the year 2013-14”, (Job-II) “Cleaning of drains and Culverts at coal yard and road flanks etc. and other areas at BTPS for the year 2013-14”. 06-01-2014 07-01-2014 Download Corrigendum
652 CORP/10309 WBPDCL/Tend-Adv/CC/13-14/142/Corp Notice Inviting Tender for Supply & Installation of Rear Projection Video Wall at Corporate Office of WBPDCL. 16-12-2013 Download Corrigendum
653 STPS/10293 STPS/GM/CIVIL/IPH-I/TEN/13-14/ 522 STPS/GM/CIVIL/IPH-I/TEN/13-14/ 522 / 434 Renovation, repairing & painting of new intake pump house at STPS (Part-A) and painting of steel structure of approach bridge at new intake, STPS (Part-B). 20-12-2013 26-12-2013 Download Corrigendum
654 STPS/10300 STPS/GM/CIVIL/CMD (T)/TEN/13-14/11 Supplying & spraying pesticides within STPS (T)”. 10-12-2013 13-12-2013 Download Corrigendum
655 CORP/10309 WBPDCL/Tend-Adv/CC/13-14/142/Corp Notice Inviting Tender for Supply & Installation of Rear Projection Video Wall at Corporate Office of WBPDCL. 16-12-2013 Download Corrigendum
656 KTPS/10292 WBPDCL/Tend-Adv/CC/13-14/131/KTPS For “Supply of Economiser Upper Bank Coil 1 to 60 with all accessories Tube Sz- 44.5 x 4.5, Material- SA210 Gr.A1 for BHEL Make Boiler for Unit-5, Qty.: 01 (One) Set” at Kolaghat Thermal Power Station (6 x 210 MW). 27-11-2013 18-12-2013 Download Corrigendum
657 STPS/10264 STPS / M&C / Tender / WS/M1-248 / 13 / Hiring Pick-Up Van / 41 Hiring of 2 (Two) nos. model-2009 onwards, Bolero Camper-M&M make Pick up Vans (Double Cabin),Seating Capacity-5 06-12-2013 16-12-2013 Download Corrigendum
658 STPS/10266 STPS / M&C / Tender / T&A/M2-373/13/ Rate Contract / 39 Annual Contract for 06 Nos. Intake Pumps installed at Bhojudih for the following Jobs :- 1) Overhauling job of the Pumps and 2) Running day to day maintenance of Pumps, under DGM(Maint.) Dept., Santaldih T.P.S. 10-12-2013 19-12-2013 Download Corrigendum
659 STPS/10271 STPS / M&C / Tender / AHP (E) / E1 – 01 / 13 / Rate Contract / 47 Rate Contract for Repairing and Rewinding job of 100 KVA, 4030V/373.5V, ESP Transformer-Rectifier set under maintenance scope of AHP (E/M) Dept. Santaldih T.P.S. 06-12-2013 18-12-2013 Download Corrigendum
660 STPS/10286 WBPDCL/Tend-Adv/CC/13-14/125/STPS STPS/M&C/Press Tender/OPH (E)/E1 –356/13/Overhauling Job/69 For “Execution Order for Overhauling Job for different 6.6 KV H.T. Motors related with Unit#6 under maintenance scope of both OPH (E/M) and IPH (E/M) Dept. STPS”. 06-12-2013 23-12-2013 Download Corrigendum
661 STPS/10267 STPS / M&C / Tender / OPH (E) / E1 – 354 / 13 / Rate Contract / 37, Rate Contract for Painting of GT #6, UAT#6A & 6B, ST #5 and related bus – ducts with supply of all painting materials under maintenance scope of OPH (E/M) Dept. Santaldih T.P.S. 30-11-2013 11-12-2013 Download Corrigendum
662 BkTPP/10256 WBPDCL/EOI-Adv/CC/13-14/105/BkTPP “Repairing and O/H Job of Locomotive -26 at Bk.TPP”. 31-12-2013 Download Corrigendum
663 BkTPP/10260 WBPDCL/Tend-Adv/CC/13-14/108/BkTPP BKSR/CC/OH-01/U# 5/07132/11115 For “Unit # 5 Boiler Overhauling for Boiler Pressure Parts, Rotary Air Pre-Heater, Coal Burners, High Pressure Valves, Safety Valves, SADC, Soot Blowers etc. of BHEL make Corner Fired 210 MW Boiler of BkTPP on Nov-Dec.2013”. 06-11-2013 11-11-2013 Download Corrigendum
664 BkTPP/10255 WBPDCL/Tend-Adv/CC/13-14/104/BkTPP BKSR/GM/CC/12A /10919 For (Job-I) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 1 to U# 3 of Bakreswar Thermal Power Project”, (Job-II) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 4 and U# 5 of Bakreswar Thermal Power Project”. 15-11-2013 20-11-2013 Download Corrigendum
665 BTPS/10254 WBPDCL/Tend-Adv/CC/13-14/103/BTPS GM (B)/CL-26/2013-14/89 For “ARC for Various civil jobs for the year 2013-14 under Plant Site Civil at BTPS”. 09-11-2013 12-11-2013 Download Corrigendum
666 BTPS/10253 WBPDCL/Tend-Adv/CC/13-14/102/BTPS GM(B)/CL-25/2013-14/86 For (Job-I) “Removal of small coal boulders generated by the picker boys, Removal of big stone boulder from wagon tippler, Removal of garbage’s and Ash from different points of plant area at BTPS for the year 2013-14”, (Job-II) “Cleaning of drains and Culverts at coal yard and road flanks etc. and other areas at BTPS for the year 2013-14”. 07-11-2013 08-11-2013 Download Corrigendum
667 SgTPP/10257 WBPDCL/Tend-Adv/CC/13-14/106/SgTPP Maintenance Contract for Control & Instrumentation system related to Unit 1&2, Water Package, Ash Handling Plant and other areas including regular schedule cleaning of instruments at SgTPP (2x300MW) 31-10-2013 18-11-2013 Download Corrigendum
668 BkTPP/10255 WBPDCL/Tend-Adv/CC/13-14/104/BkTPP BKSR/GM/CC/12A /10919 For (Job-I) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 1 to U# 3 of Bakreswar Thermal Power Project”, (Job-II) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 4 and U# 5 of Bakreswar Thermal Power Project”. 30-09-2013 25-10-2013 Download Corrigendum
669 BkTPP/10223 WBPDCL/Tend-Adv/CC/13-14/82/BkTPP Supply of 40T Capacity Rough Terrain Diesel Hydraulic Mobile Slew Crane at Bakreswar Thermal Power Project. 09-10-2013 22-10-2013 Download Corrigendum
670 BkTPP/10250 WBPDCL/Tend-Adv/CC/13-14/101/BkTPP BKTPP/ SR.MGR(C)-OPH/ G-15/ 1233/ 257 For (Job-I) ‘Widening of earthen ramp near NH-60 at BkTPP Ash Pond’, (Job-II) ‘Fitting & fixing grill (box type) with painting at ground floor windows of A-type quarters & part of B-type quarters’. 26-09-2013 30-09-2013 Download Corrigendum
671 CORP/10240 WBPDCL/Tend-Adv./CC/13-14/93/Corp For (Job-1) “Supply of beneficiated coal from MCL IB Valley coalfields-Lakhanpur, Lajkura, Samleshwari area to WBPDCL Plants”, (Job-2) “Supply of beneficiated coal from MCL IB Valley coalfields-Basundhara, Kulda area to WBPDCL Plants”. 10-09-2013 24-09-2013 Download Corrigendum
672 CORP/10240 WBPDCL/Tend-Adv./CC/13-14/93/Corp For (Job-1) “Supply of beneficiated coal from MCL IB Valley coalfields-Lakhanpur, Lajkura, Samleshwari area to WBPDCL Plants”, (Job-2) “Supply of beneficiated coal from MCL IB Valley coalfields-Basundhara, Kulda area to WBPDCL Plants”. 10-09-2013 20-09-2013 Download Corrigendum
673 CORP/10240 WBPDCL/Tend-Adv./CC/13-14/93/Corp For (Job-1) “Supply of beneficiated coal from MCL IB Valley coalfields-Lakhanpur, Lajkura, Samleshwari area to WBPDCL Plants”, (Job-2) “Supply of beneficiated coal from MCL IB Valley coalfields-Basundhara, Kulda area to WBPDCL Plants”. 10-09-2013 24-09-2013 Download Corrigendum
674 SgTPP/10208 WBPDCL/Tend-Adv/CC/13-14/71/SgTPP For Annual contract for (a) Engagement of operation helpers for round the clock (b) Cleaning and Housekeeping of Boiler/Coal Mill & other adjacent area (c) Rate contract for disposal of mill reject/ash/debris by tractor & rate contract for other intermittent cleaning for aux. area (d) Engagement of extra manpower for assisting emergency situation of operation department at SgTPP. 21-09-2013 27-09-2013 Download Corrigendum
675 CORP/10235 WBPDCL/Tend- Adv/CC/13-14/90/Corp Coal handling services from ECL to the Power stations of the WBPDCL (JOB-1),Coal handling services from BCCL to the Power stations of the WBPDCL (JOB-2),Coal handling services from MCL to the Power stations of the WBPDCL (JOB-3) 06-09-2013 18-09-2013 Download Corrigendum
676 BkTPP/10165 WBPDCL/Tend-Adv/CC/13-14/33/BkTPP For Supply of Fire Alarm System Cables at Bakreswar Thermal Power Project. 06-09-2013 20-09-2013 Download Corrigendum
677 BkTPP/10212 WBPDCL/Tend-Adv/CC/13-14/75/BkTPP BKSR/CC/AMC: 18/0823C/2277 For “Annual Maintenance Contract for Cooling Tower of Unit # 1, 2, 3, 4 & 5 (5x210MW) of Bakreswar Thermal Power Project”. 12-08-2013 14-08-2013 Download Corrigendum
678 BkTPP/10165 WBPDCL/Tend-Adv/CC/13-14/33/BkTPP For Supply of Fire Alarm System Cables at Bakreswar Thermal Power Project. 26-07-2013 07-08-2013 Download Corrigendum
679 SgTPP/10184 WBPDCL/Tend-Adv/CC/13-14/48/SgTPP SG/C-IPH /TENDER/2013/12 For "Repairing and maintenance of roads inside plant area of SgTPP". 09-07-2013 12-07-2013 Download Corrigendum
680 BkTPP/10174 WBPDCL/Tend-Adv/CC/13-14/41/BkTPP BKSR/CC/OH-05/U#4/2013 /987 For (Job-1) Overhauling of Ash handling Plant [210 MW Unit] of Unit # 4 of BkTPP & (Job-2) Overhauling of ESP area of Unit # 4 & Erection Rectification & Re-commissioning of defectives Field, 1B1 & 1B2 of the Same ESP area as Additional job. 10-07-2013 15-07-2013 Download Corrigendum