Back to Top


Search

Corrigendum
Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Corrigendum
721 BkTPP/10379 WBPDCL/Tend-Adv/CC/13-14/188/BkTPP For (Job-I) “Supply, Installation & Commissioning of 1set 220V DC, 200Ah, VRLA Battery Bank for Intake Power House at Tilpara in place of existing 220V DC Battery Bank with a provision of buy-back of old Battery Bank at Bakreswar Thermal Power Project”; (Job-II) “Supply, Installation & Commissioning of 1set 220V DC Battery Bank for GCR (Switch Yard Area) in place of existing 220V DC Battery Bank with a provision of buy-back of old Battery Bank at Bakreswar Thermal Power Project”. 21-03-2014 17-04-2014 Download Corrigendum
722 STPS/10363 WBPDCL/Tend-Adv/CC/13-14/184/STPS STPS/M&C/Press Tender/194/CHP (E)/13-14/18 For “Supply & delivery and erection commissioning of 2 Nos. of High Mast under CHP (E/M) Dept. S.T.P.S.”. 13-03-2014 21-03-2014 Download Corrigendum
723 BkTPP/10387 WBPDCL/Tend-Adv/CC/13-14/197/BkTPP BKSR/GM/CC/ AMC:02/0 933C/1394 For Annual maintenance Contract for PLCC System at Bakreswar Thermal Power Project. 19-03-2014 25-03-2014 Download Corrigendum
724 BkTPP/10374 WBPDCL/Tend-Adv/CC/13-14/187/BkTPP BKSR/GM/CC/ AMC:15/0 833C/1112 For Annual maintenance Contract for Operation and Maintenance of one TIL Crane (20T), three Escort Hydras (8T, 12T & 14T), Two Back Hoe Loader, one Road Roller, one Tractor-Trailer and one AC Ambulance of Bakreswar Thermal Power Project 28-02-2014 06-03-2014 Download Corrigendum
725 STPS/10320 WBPDCL/Tend-Adv/CC/13-14/151/STPS For “Condenser Cooling Water Treatment of Unit 5 & Unit 6, STPS, WBPDCL”. 20-02-2014 03-03-2014 Download Corrigendum
726 SgTPP/10348 WBPDCL/Tend-Adv/CC/13-14/173/SgTPP SgTPP/PUR/Civil/13-14/ For Supply and Delivery of Ductile Iron Pressure Pipes at Sagardighi Thermal Power Project. 14-02-2014 21-02-2014 Download Corrigendum
727 STPS/10345 WBPDCL/Tend-Adv/CC/13-14/171/STPS STPS/GM/CIVIL/CMD (T)/TEN/13-14/15 Annual maintenance of Conservancy work within STPS (T)”. 07-02-2014 14-02-2014 Download Corrigendum
728 BkTPP/10314 WBPDCL/Tend-Adv/CC/13-14/147/BkTPP WBPDCL/Tend-Adv/CC/ 13-14/13926/BkTPP For ‘Classifier Assembly comprising of Classifier Housing, Classifier cone, Wear plates, Classifier blades with bearing assembly, Guide box cover, Push rod assembly & Brackets for 10E10 Coal Mill at Bakreswar Thermal Power Project Stage-I’ 31-01-2014 10-02-2014 Download Corrigendum
729 STPS/10328 WBPDCL/Tend-Adv/CC/13-14/158/STPS STPS/M&C/Press Tender/AHP(E)/E1-02/13/Overhauling Job/ For (Job-I) “Execution Order for complete Overhauling of ESP (Electrostatic Precipitator) of Unit # 6 under AHP (E/M) Dept. STPS”, (Job-II) “Execution Order for Rectification of Oil Leakages, Oil Filtration and Tit – Bit Maintenance Jobs of 315 MVA, 235/16.5 KV GT# 6 and 20 MVA, 16.5/6.9 KV UAT # 6A & 6Bduring U # 6 Overhauling under maintenance scope of OPH (E/M) Dept. STPS”. 12-02-2014 19-02-2014 Download Corrigendum
730 BkTPP/10337 WBPDCL/Tend-Adv/CC/13-14/165/BkTPP BKSR/CC/Capex/14622 For “Implementation and Commissioning of Islanding Scheme of BkTPP”. 30-01-2014 06-02-2014 Download Corrigendum
731 STPS/10331 STPS/Tend-Adv/Alum/212/chem./13-14 /123 Supply & Delivery of Alumina Ferric(Alum): 16% Al2O3, Specification No. I.S.-299/2012,Gr IV, Insoluble Matter: Not more than 0.2%, Soluble Iron(Fe):0.04%, pH(5%aq.sol.):min 2.7%, Free acidity as H2SO4:0.5%, Lead as pb: 20 ppm(max), Arsenic as AS2O3:4 ppm(max), Murcury as Hg:0.4 ppm(max), Manganese as Mn:20 ppm(max), Chromium as Cr: 20 ppm(max), Cadmium as Cd:4.0 ppm(max), Selenium as Se:4.0 ppm(max), Wt. of the slab: 15-20kg/slab at Santaldih Thermal Power Project under DGM(O),STPS. 24-01-2014 10-02-2014 Download Corrigendum
732 SgTPP/10324 WBPDCL/Tend-Adv/CC/13-14/154/SgTPP SgTPP/PUR/CHEMICAL/13-14/5134 For 'Manufacturing, supply & delivery of Alumino Ferric (IS 299:2012 Grade-IV) for unit #1 & #2 of 2x300 MW Sagardighi Thermal Power Project'. 31-12-2013 20-01-2014 Download Corrigendum
733 STPS/10329 WBPDCL/Tend-Adv/CC/13-14/159/STPS STPS / M&C / Press Tender / AHP (M) / M2 – 15 / 13 / OH /122, For “Overhauling of Ash handling plant of unit #6 under AHP dept. STPS as per ‘Scope of Work’ and ‘Terms & Conditions’ as stipulated in the Tender Documents”. 24-01-2014 06-02-2014 Download Corrigendum
734 BkTPP/10312 WBPDCL/Tend-Adv/CC/13-14/145/BKTPP BKSR:PUR-III/13-14/11400/ For “Procurement of 10E 10 Coal Mill Grinding Elements at Bakreswar Thermal Power Project for 210 MW Capacity”. 20-01-2014 27-01-2014 Download Corrigendum
735 BkTPP/10256 WBPDCL/EOI-Adv/CC/13-14/105/BkTPP “Repairing and O/H Job of Locomotive -26 at Bk.TPP”. 17-03-2014 Download Corrigendum
736 STPS/10310 WBPDCL/Tend-Adv/CC/13–14/143/STPS STPS/M&C/Press Tender/OPH (E)/E1 –355/13/Overhauling Job/105 For “Execution Order for Overhauling Job for different 415V AC & 220V DC L.T. Motors related with Unit #6 under maintenance scope of both OPH (E/M) and IPH (E/M) Dept. STPS”. 24-01-2014 13-02-2014 Download Corrigendum
737 STPS/10328 WBPDCL/Tend-Adv/CC/13-14/158/STPS STPS/M&C/Press Tender/AHP(E)/E1-02/13/Overhauling Job/ For (Job-I) “Execution Order for complete Overhauling of ESP (Electrostatic Precipitator) of Unit # 6 under AHP (E/M) Dept. STPS”, (Job-II) “Execution Order for Rectification of Oil Leakages, Oil Filtration and Tit – Bit Maintenance Jobs of 315 MVA, 235/16.5 KV GT# 6 and 20 MVA, 16.5/6.9 KV UAT # 6A & 6Bduring U # 6 Overhauling under maintenance scope of OPH (E/M) Dept. STPS”. 22-01-2014 05-02-2014 Download Corrigendum
738 STPS/10304 WBPDCL/Tend-Adv/CC/13-14/139/STPS STPS / M&C / Press Tender / B&A / M2 – 512 / 13 / OH /93, For “Overhauling of Boiler Pressure Parts, HP Valves, Duct, Damper and Fans of unit#6 under B&A dept. STPS as per ‘Scope of Work’ and ‘Terms & Conditions’ as stipulated in the Tender Documents”. 20-01-2014 22-01-2014 Download Corrigendum
739 BkTPP/10321 WBPDCL/Tend-Adv/CC/13-14/152/BKTPP BKSR/CC/AMC: 10/ 01032/13855 For ‘Annual Service Maintenance of Mill rejection of Stage-II Unit # 4 & 5 & Soot Blowing of all Unit(Unit # 1 to 5) of BHEL make Corner Fired 210 MW Boiler of Bakreswar Thermal Power Project’. 15-01-2014 20-01-2014 Download Corrigendum
740 SgTPP/10323 Sg.T.P.P./Tender/HR&A/Printing/11994 For the Printing and supply of stationery items. 06-01-2014 06-01-2014 Download Corrigendum
741 BTPS/10282 WBPDCL/Tend-Adv/CC/13-14/121/BTPS GM(B)/CL-33/2013-14/104 For “Repairing/Renovation/Construction of new watch tower and erection of ‘Y’ shaped barbed wire on the boundary wall etc”. 02-01-2014 03-01-2014 Download Corrigendum
742 BTPS/10254 WBPDCL/Tend-Adv/CC/13-14/103/BTPS GM (B)/CL-26/2013-14/89 For “ARC for Various civil jobs for the year 2013-14 under Plant Site Civil at BTPS”. 02-01-2014 03-01-2014 Download Corrigendum
743 BTPS/10253 WBPDCL/Tend-Adv/CC/13-14/102/BTPS GM(B)/CL-25/2013-14/86 For (Job-I) “Removal of small coal boulders generated by the picker boys, Removal of big stone boulder from wagon tippler, Removal of garbage’s and Ash from different points of plant area at BTPS for the year 2013-14”, (Job-II) “Cleaning of drains and Culverts at coal yard and road flanks etc. and other areas at BTPS for the year 2013-14”. 06-01-2014 07-01-2014 Download Corrigendum
744 CORP/10309 WBPDCL/Tend-Adv/CC/13-14/142/Corp Notice Inviting Tender for Supply & Installation of Rear Projection Video Wall at Corporate Office of WBPDCL. 16-12-2013 Download Corrigendum
745 STPS/10293 STPS/GM/CIVIL/IPH-I/TEN/13-14/ 522 STPS/GM/CIVIL/IPH-I/TEN/13-14/ 522 / 434 Renovation, repairing & painting of new intake pump house at STPS (Part-A) and painting of steel structure of approach bridge at new intake, STPS (Part-B). 20-12-2013 26-12-2013 Download Corrigendum
746 STPS/10300 STPS/GM/CIVIL/CMD (T)/TEN/13-14/11 Supplying & spraying pesticides within STPS (T)”. 10-12-2013 13-12-2013 Download Corrigendum
747 CORP/10309 WBPDCL/Tend-Adv/CC/13-14/142/Corp Notice Inviting Tender for Supply & Installation of Rear Projection Video Wall at Corporate Office of WBPDCL. 16-12-2013 Download Corrigendum
748 KTPS/10292 WBPDCL/Tend-Adv/CC/13-14/131/KTPS For “Supply of Economiser Upper Bank Coil 1 to 60 with all accessories Tube Sz- 44.5 x 4.5, Material- SA210 Gr.A1 for BHEL Make Boiler for Unit-5, Qty.: 01 (One) Set” at Kolaghat Thermal Power Station (6 x 210 MW). 27-11-2013 18-12-2013 Download Corrigendum
749 STPS/10264 STPS / M&C / Tender / WS/M1-248 / 13 / Hiring Pick-Up Van / 41 Hiring of 2 (Two) nos. model-2009 onwards, Bolero Camper-M&M make Pick up Vans (Double Cabin),Seating Capacity-5 06-12-2013 16-12-2013 Download Corrigendum
750 STPS/10266 STPS / M&C / Tender / T&A/M2-373/13/ Rate Contract / 39 Annual Contract for 06 Nos. Intake Pumps installed at Bhojudih for the following Jobs :- 1) Overhauling job of the Pumps and 2) Running day to day maintenance of Pumps, under DGM(Maint.) Dept., Santaldih T.P.S. 10-12-2013 19-12-2013 Download Corrigendum
751 STPS/10271 STPS / M&C / Tender / AHP (E) / E1 – 01 / 13 / Rate Contract / 47 Rate Contract for Repairing and Rewinding job of 100 KVA, 4030V/373.5V, ESP Transformer-Rectifier set under maintenance scope of AHP (E/M) Dept. Santaldih T.P.S. 06-12-2013 18-12-2013 Download Corrigendum
752 STPS/10286 WBPDCL/Tend-Adv/CC/13-14/125/STPS STPS/M&C/Press Tender/OPH (E)/E1 –356/13/Overhauling Job/69 For “Execution Order for Overhauling Job for different 6.6 KV H.T. Motors related with Unit#6 under maintenance scope of both OPH (E/M) and IPH (E/M) Dept. STPS”. 06-12-2013 23-12-2013 Download Corrigendum
753 STPS/10267 STPS / M&C / Tender / OPH (E) / E1 – 354 / 13 / Rate Contract / 37, Rate Contract for Painting of GT #6, UAT#6A & 6B, ST #5 and related bus – ducts with supply of all painting materials under maintenance scope of OPH (E/M) Dept. Santaldih T.P.S. 30-11-2013 11-12-2013 Download Corrigendum
754 BkTPP/10256 WBPDCL/EOI-Adv/CC/13-14/105/BkTPP “Repairing and O/H Job of Locomotive -26 at Bk.TPP”. 31-12-2013 Download Corrigendum
755 BkTPP/10260 WBPDCL/Tend-Adv/CC/13-14/108/BkTPP BKSR/CC/OH-01/U# 5/07132/11115 For “Unit # 5 Boiler Overhauling for Boiler Pressure Parts, Rotary Air Pre-Heater, Coal Burners, High Pressure Valves, Safety Valves, SADC, Soot Blowers etc. of BHEL make Corner Fired 210 MW Boiler of BkTPP on Nov-Dec.2013”. 06-11-2013 11-11-2013 Download Corrigendum
756 BkTPP/10255 WBPDCL/Tend-Adv/CC/13-14/104/BkTPP BKSR/GM/CC/12A /10919 For (Job-I) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 1 to U# 3 of Bakreswar Thermal Power Project”, (Job-II) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 4 and U# 5 of Bakreswar Thermal Power Project”. 15-11-2013 20-11-2013 Download Corrigendum
757 BTPS/10254 WBPDCL/Tend-Adv/CC/13-14/103/BTPS GM (B)/CL-26/2013-14/89 For “ARC for Various civil jobs for the year 2013-14 under Plant Site Civil at BTPS”. 09-11-2013 12-11-2013 Download Corrigendum
758 BTPS/10253 WBPDCL/Tend-Adv/CC/13-14/102/BTPS GM(B)/CL-25/2013-14/86 For (Job-I) “Removal of small coal boulders generated by the picker boys, Removal of big stone boulder from wagon tippler, Removal of garbage’s and Ash from different points of plant area at BTPS for the year 2013-14”, (Job-II) “Cleaning of drains and Culverts at coal yard and road flanks etc. and other areas at BTPS for the year 2013-14”. 07-11-2013 08-11-2013 Download Corrigendum
759 SgTPP/10257 WBPDCL/Tend-Adv/CC/13-14/106/SgTPP Maintenance Contract for Control & Instrumentation system related to Unit 1&2, Water Package, Ash Handling Plant and other areas including regular schedule cleaning of instruments at SgTPP (2x300MW) 31-10-2013 18-11-2013 Download Corrigendum
760 BkTPP/10255 WBPDCL/Tend-Adv/CC/13-14/104/BkTPP BKSR/GM/CC/12A /10919 For (Job-I) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 1 to U# 3 of Bakreswar Thermal Power Project”, (Job-II) “Annual Maintenance Contract for Mechanical Maintenance Works of Boiler & its auxiliary systems of Unit # 4 and U# 5 of Bakreswar Thermal Power Project”. 30-09-2013 25-10-2013 Download Corrigendum