Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Category
561 SgTPP/11716 WBPDCL/Tend-Adv/CC/16-17/358/SgTPP Operation & Maintenance of Industrial Relations Software including Data Entry related to statutory compliance, Report Generation, Issuance of Security Checking Pass, Visitor – Vendor Pass, Owner cum Driver Pass as well as Data Entry i.r.o. Occupation 10-01-2017 24-01-2017 Download Original
562 CORP/11715 WBPDCL/Tend-Adv/CC/16-17/355/Corp Overhauling of DEC Make 300 MW Main Turbine,Unit#1, Sagardihi Thermal Power Station, WBPDCL 30-01-2017 Download Original
563 KTPS/11714 WBPDCL/Tend-Adv/CC/16-17/357/KTPS DESIGN, MANUFACTURE, ASSEMBLY, TESTING AT MANUFACTURERS WORKS, SUPPLY & DELIVERY OF GRINDING RING & BALLS FOR 8.5E(10) COAL MILL FOR KOLAGHAT THERMAL POWER STATION (6X210MW) 10-01-2017 31-01-2017 Download Original
564 KTPS/11713 WBPDCL/Tend-Adv/CC/16-17/356/KTPS Annual maintenance Contract for Horticultural and Landscaping activities at KTPS Township 17-01-2017 Download
565 KTPS/11712 WBPDCL/Tend-Adv/CC/16-17/354/KTPS DESIGN, MANUFACTURE, ASSEMBLY, TESTING AT MANUFACTURERS WORKS, SUPPLY& DELIVERY, TRANSPORT INCLUDING TRANSIT INSURANCE OF 07(SEVEN) SETS OF GRINDING ROLL, BULL RING SEGMENT & AIR PORT RING ASSEMBLY OF BOWL MILL FOR THE PERIOD FROM APRIL17 TO MARCH18 11-01-2017 20-01-2017 Download
566 KTPS/11711 MANUFACTURE/SUPPLY, TESTING AT MANUFACTURERS/SUPPLIERS WORKS & DELIVERY OF MS ERW PIPE OF SIZE 150NB FOR REPLACEMENT OF 3RD P1 LINE (PTP TO DMP) OF TURBINE & AUXILIARIES DEPT., FOR KTPS (6X210MW). 11-01-2017 24-01-2017 Download
567 SgTPP/11710 WBPDCL/Tend-Adv/CC/16-17/352/SgTPP Annual maintenance contract for control and instrumentation system of SgTPP Stage – I 13-01-2017 27-01-2017 Download Original
568 STPS/11709 WBPDCL/Tend-Adv/CC/16-17/351/STPS Supply & Delivery of Fire Fighting maintenance pipe (Make: JINDAL/BANSAL/TISCO) line under F&S Dept., Santaldih T.P.S., the WBPDCL 11-01-2017 Download
569 STPS/11708 WBPDCL/Tend-Adv/CC/16-17/350/STPS Supply & delivery of Fire Fighting maintenance pipe(make: Jindal/Sail/Indian Tube Co/TISCO) line of 250NB & 300 NB under F&S dept., STPS. 09-01-2017 Download
570 KTPS/11707 WBPDCL/Tend-Adv/CC/16-17/349/KTPS Daily routine operation of tube wells at KTPS Township 17-01-2017 Download Original
571 STPS/11705 STPS/GM/CIVIL/IPH/TEN/16-17/642 Interior Painting and other ancillary civil works at DM Plant Building, Unit#5 of STPS 06-01-2017 10-01-2017 Download Original
572 KTPS/11704 WBPDCL/Tend-Adv/CC/16-17/342/KTPS ARC for Jointing & Repairing of Conveyor Belt and Drum Rubber Lagging at CHP, KTPS. 03-01-2017 Download
573 BTPS/11703 WBPDCL/Tend-Adv/CC/16-17/348/BTPS Procurement of different sizes of wooden Sleepers (Sal Malaysian). 12-01-2017 Download Original
574 STPS/11702 WBPDCL/Tend-Adv/CC/16-17/347/STPS Hosiery Cutting of size 4"X8", Colour - White Cotton waste, Colour-White,Grade-A 03-01-2017 11-01-2017 Download
575 STPS/11701 WBPDCL/Tend-Adv/CC/16-17/346/STPS Procurement of Insulation Mattresses, (1200 Nos.) Size: 1220x1520x50 mm for Unit # 5 Overhauling scheduled to be held in July 2017 under BMD, Santaldih T.P.S., the WBPDCL 30-12-2016 Download Original
576 SgTPP/11700 WBPDCL/Tend-Adv/CC/16-17/345/SgTPP ARC for miscellaneous Civil works at Phase-I (U#1&2) in SgTPP Plant for year 2017- 18 06-01-2016 11-01-2016 Download Original
577 SgTPP/11699 WBPDCL/Tend-Adv/CC/16-17/343/SgTPP Annual Contract for housekeeping / cleaning work at different location of CHP , SgTPP (Phase – I , 2x300 MW) 06-01-2017 17-01-2017 Download Original
578 SgTPP/11698 WBPDCL/Tend-Adv/CC/16-17/344/SgTPP ARC for miscellaneous Civil works at Phase-II (U#3&4) in SgTPP Plant for year 2017- 18 06-01-2017 11-01-2017 Download Original
579 KTPS/11697 WBPDCL/Tend-Adv/CC/16-17/339/KTPS Conservancy work in & around KTPS Township area 10-01-2017 Download Original
580 BTPS/11696 WBPDCL/Tend-Adv/CC/16-17/338/BTPS Procurement of Boiler tube for Stage- I Units (4X60 MW), BTPS 04-01-2017 Download Original
581 SgTPP/11695 WBPDCL/Tend-Adv/CC/16-17/337/SgTPP Procurement, Installation and Commissioning of 108 nos. of 220V,1500AH PLANTE type Lead Acid Battery Bank and 220V,500A Dual Automatic Float cum Boost Charger for Unit#1 of Sagardighi Thermal Power Project, WBPDCL 02-01-2017 Download Original
582 SgTPP/11694 WBPDCL/Tend-Adv/CC/16-17/336/SgTPP Procurement of 2 nos. of Heavy duty water carriers with multi pressure high-low capacity centrifugal Fire Pump for Sagardighi Thermal Power Project, WBPDCL 02-01-2017 Download Original
583 STPS/11693 WBPDCL/Tend-Adv/CC/16-17/341/STPS Procurement of Seal Assembly [6 nos.] for Pulverizer Hot Air Gate of Unit # 5 Overhauling in July 2017 under BMD, Santaldih T.P.S., the WBPDCL 29-12-2016 Download
584 STPS/11692 WBPDCL/Tend-Adv/CC/16-17/340/STPS Overhauling job of BHEL make 250 MW Unit # 5 ESP under AHP (E/M) Dept. STPS, WBPDCL 31-12-2016 Download Original
585 CORP/11691 WBPDCL/Tend-Adv/CC/16-17/335/Corp Evacuation OF ASH from ASH POND-1/ASH POND-2, Transportation, Disposal in eco-friendly manner at Santaldih Thermal Power Station(6th phase) 09-01-2017 Download Original
586 STPS/11690 STPS/GM/CIVIL/IPH/TEN/16-17/641 Repairing of roof with APP modified bituminous membrane at DM plant and adjacent chemical laboratory of Unit#5 at STPS 30-12-2016 04-01-2017 Download
587 STPS/11689 WBPDCL/Tend-Adv/CC/16-17/334/STPS Supply & Delivery of 150NB, 200NB, 250NB & 300NB CI gate valves for fire line maintenance under F&S Dept., Santaldih.T.P.S., the WBPDCL 23-12-2016 30-12-2016 Download Original
588 STPS/11688 WBPDCL/Tend-Adv/CC/16-17/332/STPS Supply and delivery of Desktop (HP/IBM/DELL) and Printer (HP) for 2x250 MW Unit5 & Unit6 for IT Depts., Santaldih T.P.S., the WBPDCL 21-12-2016 Download Original
589 STPS/11687 WBPDCL/Tend-Adv/CC/16-17/333/STPS Overhauling job of HP Valves & Actuators in Unit # 5 under M/M(B&A) Dept. STPS, WBPDCL 26-12-2016 Download Original
590 STPS/11686 WBPDCL/Tend-Adv/CC/16-17/331/STPS ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I deptt. of 250 MW unit #5 & 6 of STPS, WBPDCL 19-12-2016 Download
591 STPS/11686 WBPDCL/Tend-Adv/CC/16-17/331/STPS ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I deptt. of 250 MW unit #5 & 6 of STPS, WBPDCL 19-12-2016 Download
592 BTPS/11685 WBPDCL/Tend-Adv/CC/16-17/330/BTPS One (01) Year Annual Maintenance Contract for various Maintenance jobs of Coal Handling Plant, BTPS under CHP Mechanical Maintenance 05-01-2017 Download Original
593 KTPS/11684 WBPDCL/Tend-Adv/CC/16-17/329/KTPS Annual rate contract for deployment of semi-skilled technicians,riggers,welders,helpers,supervisor for different jobs of stage –I, under B&A,KTPS Annual Service Contract for the job of operation of Ammonia Dosing System and Chlorination Plant 26-12-2016 Download
594 CORP/11683 WBPDCL/Tend-Adv/CC/16-17/325/Corp. Evacuation of Ash from Ash Pond No.1, Transportation, disposal in eco-friendly manner at BkTPP(14th Phase) 09-01-2017 Download Original
595 STPS/11682 WBPDCL/Tend-Adv/CC/16-17/328/STPS Conservancy work at inside and outside power house and other ancillary works with supply of materials at STPS Construction of 700 meter long platform along the fly ash railway line no. 1 at STPS 22-12-2016 Download
596 STPS/11681 WBPDCL/Tend-Adv/CC/16-17/327/STPS Overhauling job of Boiler Pressure Parts, Duct, Damper and Gate of Unit # 5 under M/M(B&A) Dept. STPS, WBPDCL 26-12-2016 Download
597 STPS/11680 WBPDCL/Tend-Adv/CC/16-17/326/STPS Overhauling job of PA, ID & FD Fans of Unit # 5 of 250 MW, under M/M(B&A) Dept. STPS , WBPDCL Overhauling job of Tri- Sector Air Preheater, Burners, SADC and Coal Carrying Pipe of unit # 5 under M/M(B&A) Dept. STPS, WBPDCL 24-12-2016 Download
598 STPS/11680 WBPDCL/Tend-Adv/CC/16-17/326/STPS Overhauling job of PA, ID & FD Fans of Unit # 5 of 250 MW, under M/M(B&A) Dept. STPS , WBPDCL Overhauling job of Tri- Sector Air Preheater, Burners, SADC and Coal Carrying Pipe of unit # 5 under M/M(B&A) Dept. STPS, WBPDCL 24-12-2016 Download
599 BTPS/11679 WBPDCL/Tend-Adv/CC/16-17/324/BTPS Horticultural landscaping activities at BTPS Plant site Horticultural landscaping activities at Guest House of BTPS 28-12-2016 Download Original
600 BTPS/11678 WBPDCL/Tend-Adv/CC/16-17/323/BTPS Procurement of Ceramic lined coal pipe bends for Stage- I Units (4X60 MW), BTPS 22-12-2016 Download Original