Sl.No NIT No. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download
1721 BkTPP/11162 Supply of Skilled, Semi-skilled and Unskilled manpower in connection with Miscellaneous Work at BkTPP. 30-12-2015 08-01-2016 Original
1722 BkTPP/11161 Supply of Coal Feeder Load Cell (Weighing Module) 06-01-2016 Original
1723 BTPS/11160 Procurement of one JAW Crusher (coal feed size 80mm, product size 12.5mm) & one roll crusher (coal feed size 12.5mm, product size 3.35mm) for coal sample preparation for BTPS of WBPDCL 22-12-2015 Original
1724 STPS/11159 Fencing work around the Employees Recreation Club along with allied jobs 28-12-2015 Original
1725 SgTPP/11158 Hiring two (02) nos. (one for 42+ seats & another for 32+ seats) of non AC diesel, BSIII/IV new bus for plying at SgTPP 24-12-2015 06-01-2016 Original
1726 CORP/11157 “PAINTING & TIT-BIT REPAIRING WORK AT OUTSIDE WALL, STAIRCASE, BOUNDARY WALL ETC.AT BIDYUT UNNAYAN BHABAN(BUB) AT THE CORPORATE OFFICE OF WBPDCL. 11-01-2016 Original
1727 CORP/11156 Design, Engineering, Manufacturing, Testing, Supply, Installation & Commissioning of New PLC system with C.C. Camera at the existing CHP (Stage-I & II) at Kolaghat Thermal Power Station. 12-01-2016 Original
1728 BTPS/11155 ARC for Twenty (20) nos. of regular supply labours for administrative & other jobs at BTPS, WBPDCL ARC for thirty two (32) nos. of regular supply labours for Operation and Maintenance Jobs at BTPS,WBPDCL. 17-12-2015 Original
1729 BkTPP/11154 Supply, installation & commissioning of telephone exchange. 07-01-2016 Original
1730 KTPS/11153 Sinking of one (01) no. deep tube well inside KTPS. 05-01-2016 07-01-2016 Original
1731 KTPS/11152 Annual maintenance contract Contract for Comprehensive Maintenance of room air conditioners & drinking water coolers at KTPS. 19-12-2015 Original
1732 KTPS/11151 Comprehensive Medical Check-up of PDCL employees and Contractors employees at KTPS Plant site. 18-12-2015 Original
1733 BkTPP/11150 Annual Maintenance Contract for regular cleaning of Power House Area (boiler, turbine & auxiliary equipment), Ash Handling Plant including piece meal job of U#1 – 5 of BkTPP 29-12-2015 Original
1734 CORP/11149 Supply of Desktops and other allied accessories for WBPDCL corporate office and Power & NES department of Govt. OF WB, Kolkata-700098 20-12-2015 Original
1735 CORP/11148 Supply, Installation, Commissioning of SMF batteries for UPS system at Corporate Office, WBPDCL 31-12-2015 Original
1736 CORP/11147 Engineering Consultancy services including Design, Engineering & preparation of all Technical specification and Commissioning & Performance Guarantee of all equipments etc. for the proposed ash water recovery pump house with recirculation system for 22-12-2015 Original
1737 CORP/11146 THOROUGH ROOF TREATMENT AND APPLICATION OF SILICON SEALANT AT BIDYUT UNNAYAN BHABAN (BUB) AT THE CORPORATE OFFICE BUILDING OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL) 22-12-2015 Original
1738 CORP/11145 Design, Engineering, Procurement of materials, Construction of Structural Foot Over Bridgen on RCC foundation (span approx. 80m) including approaches etc. at pre-track hopper area and Commissioning with the approval of the railway authority for Bakreswar Thermal Power Station 04-01-2016 Original
1739 STPS/11144 Procurement of DRC line bend and it’s fitting under AHP dept., Santaldih T.P.S., the WBPDCL 15-12-2015 Original
1740 STPS/11143 Procurement of jaw- flex coupling & rubber spider for various lub oil pumps and grid-flex coupling between coal mill motor & carden shaft under B&A dept. STPS. 18-12-2015 22-12-2015 Original
1741 STPS/11142 Maintenance of garden at Adm. building and new technical building area at STPS 12-12-2015 Original
1742 CORP/11141 Flooring & tit-bit repairing works at Guest House at Bidyut Unnyan Bhaban at the corporate office of The West Bengal Power Development Corporation Limited Bidyut Unnayan Bhaban, Plot 3/C, LA- Block, Sector –III, Bidhannagar, Kolkata- 700 098 28-12-2015 Original
1743 BTPS/11140 Overhauling of Boiler and its Pressure parts & High pressure jet cleaning of unit No. 1 during its overhauling at BTPS of WBPDCL 18-12-2015 Original
1744 BkTPP/11139 Supply of Labrynth Seals 21-12-2015 Original
1745 STPS/11138 Procurement of Air Conditioning Machines under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL 08-12-2015 Original
1746 STPS/11137 Painting of various 220/132/33 KV Switch Yard equipments and 33 KV Old Intake switch yard and related structures with supply of all painting materials under the maintenance scope of EM-OPH, STPS 15-12-2015 Original
1747 KTPS/11136 Annual Rate Contract for Loading, unloading and transporting of materials (within KTPS, from outside to KTPS and from KTPS to outside) under S&P wing of KTPS 10-12-2015 Original
1748 CORP/11135 Annual Maintenance Contract for HP make Datacenter components at WBPDCL Corporate office. 30-11-2015 Original
1749 SgTPP/11134 Annual contract for Electrical Maintenance under the Scope of Electrical-IPH Department, SgTPP (PHASE-1,2X300MW) 30-11-2015 11-12-2015 Original
1750 SgTPP/11133 Laying of drinking water distribution pipeline for newly constructed B-type quarters (Qtr. no. B-58 to B-89) and C -type quarters (C-30 to C-39) at SgTPP Township 09-12-2015 14-12-2015 Original
1751 KTPS/11132 Replacement of Primary Super Heater Outlet Header during Overhauling of Boiler Pressure Parts of Unit#2 in 2015. 10-12-2015 Original
1752 BTPS/11131 Annual Maintenance Contract for one year for the job of day to day maintenance of PCI-III department, Unit # 1 to 4, at BTPS 05-12-2015 Original
1753 SgTPP/11130 Repairing and maintenance of roads inside plant premises of SgTPP. 30-11-2015 Original
1754 SgTPP/11129 Miscellaneous Civil works in plant (ARC) for the period 2015-16 at SgTPP 20-11-2015 Original
1755 SgTPP/11128 Repairing and renovation of condensate neutralizing basin building beside Boiler # 2 of SgTPP 19-11-2015 27-11-2015 Original
1756 SgTPP/11127 Replacement of chequered plates of conveyor galleries 3A/B of SgTPP, Murshidabad 30-11-2015 11-12-2015 Original
1757 STPS/11126 Procurement of 245 kV & 145 kV Current Transformers under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL 26-11-2015 Original
1758 SgTPP/11125 Annual contract for Operation of Condensate Polishing Unit (CPU) in three shifts, SgTPP (PHASE- 1,2X300MW). 30-11-2015 11-12-2015 Original
1759 BTPS/11124 Removal of deposited ash from bottom ash hopper, sump pits, ash trenches of 5th unit at BTPS Yearly cleaning of ash from bottom ash hopper, ash pipe trenches, air preheater bottom outlet, cleaning of coal dust from coal carrying pipes at pulveriser 09-12-2015 Original
1760 BTPS/11123 Procurement of Ring and Ball sets for EL- 76 Pulverizer for Stage- I Units (4X60 MW), BTPS 02-12-2015 Original