Sl.No NIT No. Tender Ref 1. Tender Ref 2. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download Category
2121 SgTPP/10135 WBPDCL/Tend-Adv/CC/13-14/10/SgTPP For "Electrical Maintenance Contract under the scope of Electrical-IPH department of SgTPP (2x300MW Units)". 26-04-2013 08-05-2013 Download Original
2122 SgTPP/10134 Sg.T.P.P/Tender/HR&A/Printing/3522 For the Printing and Supply of Stationery items as per the list enclosed. 23-04-2013 23-04-2013 Download Original
2123 STPS/10133 WBPDCL/Tend-Adv/CC/13-14/09/STPS STPS/CC/Press Tender/CHP(M)/M1-227(Vol-IV)/12/75 For “Annual Contract for BOBR unloading, cleaning of pre-crusher and Crusher house zone and maintenance (Electrical and Mechanical) jobs at CHP,STPS for 250MW unit No.5&6 at STPS for 02(Two) years.” 24-04-2013 21-05-2013 Download Original
2124 KTPS/10132 WBPDCL/Tend-Adv/CC/13-14/08/KTPS For Overhauling of Boiler Pressure Parts-I of Unit # 2, KTPS in June-July, 2013. 16-05-2013 23-05-2013 Download Original
2125 SgTPP/10131 WBPDCL/Tend-Adv/CC/13-14/07/SgTPP For Rate contract for Rotation/Replacement of Ash Slurry/Conveying pipe of AHP at SgTPP. 29-04-2013 10-05-2013 Download Original
2126 CORP/10130 WBPDCL/Tend-Adv/CC/13-14/06/Corp. For De-silting and re-sectioning of Midnapore canal, including disposal of excavated spoil, at Kolaghat Thermal Power Station, District Purba Midnapore, West Bengal. 13-05-2013 31-05-2013 Download Original
2127 BkTPP/10129 WBPDCL/Tend-Adv/CC/13-14/05/BkTPP BKSR/CC/OH-01/U#1/2013/ 765 For (Job-I) Overhauling of Boiler & Boiler Pr.Parts, Tubular Air Pre-Heater, Coal Burners, High Pr V/V, Safety Valves, SADC, Soot Blowers etc., (Job-II) Unit # 4 Boiler Overhauling for Boiler Pr. Parts, Rotary Air Pre-Heater, Coal Burners, High Pr. Valves, Safety Valves, SADC, Soot Blowers etc. of BkTPP 06-05-2013 13-05-2013 Download Original
2128 CORP/10128 WBPDCL/Tend-Adv/CC/13-14/04/Corp. For “Evacuation, transportation and disposal of settled ash in eco- friendly manner from the Ash pond of Bandel Thermal Power Station, at Dist. Hooghly, West Bengal”. 24-04-2013 30-04-2013 Download Original
2129 SgTPP/10127 WBPDCL/Tend-Adv/CC/13-14/03/SgTPP For AMC of total ten (10) nos. Lifts (02 nos. at Power House, 02 nos. at Boiler, 02 nos. at Coal Bunker, 02 nos. at Technical Building, 01 no. at Administrative Building & 01 no. at GCR) of SgTPP (2x300MW Units). 23-04-2013 08-05-2013 Download Original
2130 KTPS/10126 WBPDCL/Tend-Adv/CC/13-14/02/KTPS For supply of 300NB, MS ERW Pipe for Slurry Line of Ash Handling Plant at Kolaghat Thermal Power Station (6 x 210 MW). 23-04-2013 29-04-2013 Download Original
2131 STPS/10125 STPS/DGM(C)/1/TEN/PM/ 479 For “Conservancy work at inside and outside power house and other ancillary works with supply of materials at STPS ” 19-04-2013 26-04-2013 Download Original
2132 SgTPP/10124 WBPDCL/Tend-Adv/CC/13-14/01/SgTPP Mechanical Maintenance of all Vertical Pumps, Plant Water System(Intake Pump House, PT Plant and DM Plant), CW Pump House, CPU, Effluent System, Fire Pump House and mechanical related work of higher capacity motors for the said area at SgTPP-Phase-I. 13-04-2013 24-04-2013 Download Original
2133 SgTPP/10123 SgTPP/CC/Tend/12-13/031/ 2879 Contract for repairing and rewinding of 01 set(two nos.) ILMS coil at CHP, SgTPP (2x300 MW unit) 19-04-2013 03-05-2013 Download
2134 SgTPP/10122 WBPDCL/Tend-Adv/12-13/212/SgTPP Rate Contract for maintenance of RAC/Split AC/Tower AC etc. at SgTPP (both plant & township) 06-04-2013 17-04-2013 Download
2135 BkTPP/10121 WBPDCL/Tend-Adv/PR/12-13/211/BkTPP BKTPP/SR.MGR(C-IPH)/Tender/12-13/ 024 Annual contract for jungle cutting including trimming and cutting of trees inside BkTPP plant premises for the year 2013 25-03-2013 28-03-2013 Download Original
2136 KTPS/10120 WBPDCL/Tend-Adv/PR/12-13/210/KTPS 619AHSS12-13GT For supply of 400NB, MS ERW Pipe for Slurry Line of Ash Handling Plant at Kolaghat Thermal Power Station (6 x 210 MW). 09-04-2013 12-04-2013 Download Original
2137 CORP/10119 WBPDCL/Tend-Adv/PR/12-13/209/Corp Construction of G+1 storeyed Officers’ Recreation Club at Sagardighi Thermal Power Project Township, Murshidabad, West Bengal. 16-04-2013 30-04-2013 Download Original
2138 CORP/10118 WBPDCL/Tend-Adv/PR/12-13/208/Corp. Construction of G+1 storeyed General Recreation Club at Sagardighi Thermal Power Project Township, Murshidabad, West Bengal 12-04-2013 26-04-2013 Download Original
2139 SgTPP/10117 WBPDCL/Tend-Adv/PR/12-13/207/SgTPP Rate Contract for 415 Volt LT Motor Maintenance at SgTPP 05-04-2013 19-04-2013 Download Original
2140 KTPS/10116 WBPDCL/Tend-Adv/PR/12-13/206/KTPS DGM (C)/ 10/ 13/ 361 Thorough repairing, maintenance and painting of 05 nos. C-Type building at KTPS township (Phase-IV work). (Job-II) Repairing, renovation and painting of Utility Building at KTPS.(Job-III) Repairing, and renovation including painting of G.S. Building 05-04-2013 10-04-2013 Download Original
2141 KTPS/10115 WBPDCL/Tend-Adv/PR/12-13/205/KTPS DGM (C)/ 06/ 13/ 345 Roof treatment work 06/13 with A.P.P. modified bituminous membrane over roof of Turbine hall of Unit #01, stage-01 at KTPS. 01-04-2013 03-04-2013 Download Original
2142 SgTPP/10114 WBPDCL/Tend-Adv/PR/12-13/204/SgTPP Electrical Maintenance Contract under the scope of Electrical-OPH department of SgTPP (2x300 MW Units) 02-04-2013 12-04-2013 Download Original
2143 CORP/10113 WBPDCL/Tend-Adv/PR/12-13/203/Corp "Construction of G+1 storeyed Officers' Recreation Club at Bakreswar Thermal Power Project Township, Birbhum, West Bengal". 25-03-2013 11-04-2013 Download
2144 CORP/10112 WBPDCL/Tend-Adv/PR/12-13/202/Corp “Evacuation of settled ash from the ash pond no.2 in eco-friendly manner at Santaldih Thermal Power Station, Purulia”. 25-03-2013 08-04-2013 Download Original
2145 KTPS/10111 WBPDCL/Tend-Adv/PR/12-13/201/KTPS “Overhauling of Ash Handling System (Dry & wet System) for 210MW Unit #2 of K.T.P.S. in June-July, 2013” 11-04-2013 17-04-2013 Download Original
2146 BkTPP/10110 WBPDCL/Tend-Adv/PR/12-13/200/BkTPP BKTPP/SR.MGR(C-IPH)/Tender/2012-13/22. “Construction of 1st phase of peripheral road along with covering of ash embankment with good earth and coal stone boulder along south side of boundary wall, at BKTPP”. 21-03-2013 26-03-2013 Download Original
2147 BTPS/10109 WBPDCL/Tend-Adv/PR/12 Adv/PR/12-13/199/BTPS GM (B)/CL-78/2012-13/ 13/487 Repairing of boiler structures & ESP Structures including Repairing priming, painting & other allied civil works of any unit of stage-1 under 1-4th unit at BTPS. 25-03-2013 05-04-2013 Download Original
2148 BkTPP/10108 WBPDCL/Tend-Adv/PR/12-13/198/BkTPP BKTPP/SR.MGR(C-IPH)/Tender/2012-13/021 (JOB-I) Landscaping work including necessary civil work, electrical work etc at BkTPP in connection with MP-3 & (JOB-II) Construction, Fabrication & Erection of Height Gauge at level crossing at BkTPP Railway siding. 19-03-2013 22-03-2013 Download Original
2149 KTPS/10107 WBPDCL/Tend-Adv/PR/12-13/197/KTPS GMOH/2527-IV Overhauling including Replacement and Re-fitting of collecting plates & discharge electrodes etc. of ESP of 210 MW Unit # 2, KTPS in June-July, 2013. 04-04-2013 10-04-2013 Download Original
2150 BTPS/10106 WBPDCL/Tend-Adv./PR/12-13/196/BTPS GM (B)/CL-75/2012-13/486 For ‘Cleaning of main drain, cleaning and sweeping of School Building, Recreation Club, Welfare Centre, Dr. B. C. Roy Badminton Centre at BTPS Township for the year 2012-13’. 23-03-2013 26-03-2013 Download Original
2151 KTPS/10105 WBPDCL/EOI-Adv/PR/12-13/195/KTPS For “Construction of structural shed of coal stack yard at Kolaghat Thermal Power Station Mecheda,Purba Medinipur”. 20-03-2013 Download Original
2152 BkTPP/10104 WBPDCL/Tend-Adv/PR/12-13/193/BkTPP BKTPP/SR.MGR(C-IPH)/Tender/2012-13/019 For (Job-I) “Construction of toilet block, ladies toilet at track hopper area and Driver’s rest room near CHP-PLC at BkTPP” & (Job-II) “Slope correction with narrow drain at ASH water pump house (STAGE-II) at BkTPP”. 11-03-2013 13-03-2013 Download Original
2153 BkTPP/10103 WBPDCL/Tend-Adv/PR/12-13/194/BkTPP BKTPP/SR.MGR(C-IPH)/Tender/2012-13/018 For “Annual Civil maintenance of different plant buildings of MP-1, 2, 3, CHP, Simulator Building, Roads inside plant and minor civil construction for one year at BkTPP”. 13-03-2013 15-03-2013 Download Original
2154 STPS/10102 WBPDCL/Tend-Adv/PR/12-13/192/STPS STPS/CC/Press Tender/Misc./Const. /E2-130/13/1496 For “Designing, engineering, manufacturing, supply, erection and commissioning of drinking water system for STPS Township at Santaldih.” 15-03-2013 03-04-2013 Download
2155 CORP/10101 WBPDCL/Tend-Adv/PR/12-13/191/Corp Construction of 2 nos. of Staff Quarters-type 'D' at Sagardighi Thermal Power Project Township, Murshidabad, West Bengal under The WBPDCL. 15-03-2013 28-03-2013 Download Original
2156 STPS/10100 WBPDCL/Tend-Adv/PR/12-13/187/STPS STPS/GM/SM(HR&A)/211 “Deployment of 37 (thirty seven) nos. unskilled Workers and 01 (one) no. Supervisor for providing services to various department at STPS as per discretion of the STPS Authority” 07-03-2013 15-03-2013 Download
2157 SgTPP/10099 WBPDCL/Tend-Adv/PR/12-13/190/SgTPP SgTPP/PUR/B&A/14/217 For Supply and Delivery of HYDRAULIC REGULATING MECHANISM COMPLETE ASSEMBLY including ROTATING OIL SEAL & REGULATING VALVE for PA FAN (CHINA make) for 2 X 300 MW Unit at SgTPP. 27-03-2013 10-04-2013 Download
2158 BTPS/10098 WBPDCL/Tend-Adv/PR/12-13/189/BTPS GM (B)/CL-73/2012-13/479 For “Yearly cleaning of ash from bottom ash hopper, ash pipe trenches, air preheater, bottom outlet cleaning coal dust from coal carrying pipes at pulveriser points of unit No. 1-4th at BTPS for the year 2012-13.” 15-03-2013 19-03-2013 Download Original
2159 KTPS/10097 WBPDCL/Tend-Adv/PR/12-13/188/KTPS For “Up-gradation/ Renovation for 4 (C, D) AW System, Stg-I of Unit -2 (at 18 Mtr. above U.C.R.# 2) of K.T.P.S. during Overhauling in June-July, 2013”. 21-03-2013 28-03-2013 Download Original
2160 STPS/10096 STPS/DGM/Civil/1/TEN/PM/477 “Making Hard Surface in between area of C.W. Pump House and Cooling Tower unit#5 at STPS” 16-03-2013 20-03-2013 Download Original