Back to Top

The West Bengal Power Development Corporation Limited


Tender Portal


Search

Tender Portal
Sl.No NIT No. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download
201 BTPS/12229 Schedule Maintenance of EL -76 Pulverisers & Servicing of coupling & strainer cleaning of auxiliaries at Units 1-2 on AMC basis under B&A (Stage-I), BTPS, WBPDCL 24-07-2018 Original
202 KTPS/12169 Manufacturing, Supply, Testing, Delivery & Transport of Planetary Gear Box for SR-1, 2 Slew Drive at CHP, KTPS through CAPEX Budget proposal of F.Y. 2016-017 13-08-2018 Original
203 STPS/12285 Deployment of 75 (Seventy Five) nos. Contractor Workers and 01 (One) no. Supervisor for providing services to various departments at STPS 19-07-2018 Original
204 STPS/12284 Cleaning Jungles, Cutting Long Grasses, Bushes, Shrubs, Dry Trees etc. inside all 220/132/33KV Switch yard under EM-OPH, STPS, The WBPDCL 17-07-2018 Original
205 CORP/12179 IT Facility Management Service at WBPDCL’s Corporate Office 31-07-2018 Original
206 CORP/12178 Manual unloading of BOXN Wagons on Track Hopper at Sagardighi Thermal Power Project 05-07-2018 Original
207 STPS/12283 Rate Contract for Laying or Withdrawal or both Laying and Withdrawal of LT & HT Cable under EMIPH, EMOPH & AHP (E/M) Dept, STPS 17-07-2018 Original
208 BTPS/12228 Removing sludge from septic tank, soak well etc. at BTPS Township 19-07-2018 Original
209 BTPS/12227 Construction of toilet at operation floor of Unit # 1 to Unit # 4 at BTPS 24-07-2018 Original
210 BTPS/12226 Repairing and overhauling of Deep Tube Well Pumps (22.5 HP Capacity) at BTPS Plant 24-07-2018 Original
211 SgTPP/12216 Different Filter Cartridge for Control Fluid Regeneration Stage 2 for Sagardighi Thermal Power Project, WBPDCL 19-07-2018 Original
212 SgTPP/12215 Procurement of LT Fasteners of any make for Stage 1&2 for Sagardighi Thermal Power Project, WBPDCL 19-07-2018 Original
213 SgTPP/12214 Procurement of HT Fasteners of LPS/TVS/UNBRAKO/CAPARO make for Stage 1 & 2 for Sagardighi Thermal Power Project, WBPDCL 19-07-2018 Original
214 SgTPP/12213 Maintenance contract of Mechanical Maintenance for SgTPP, CHP, Stage-I & II for one year 11-07-2018 Original
215 BTPS/12225 Replacement/ Servicing of Coal Pipe Bends, Straight Piece, Y-Splitter, VARB and servicing of CCP Hanger Support during Unit # 5 Overhauling under B&A (5th Unit), BTPS, WBPDC 20-07-2018 Original
216 BTPS/12224 Insulation of Boiler area of Unit # 5 during unit overhauling under B&A(5th Unit) BTPS, WBPDCL 19-07-2018 Original
217 STPS/12282 Repairing and painting of Talgoria Bridge at Bhojudih, Jharkhand 12-07-2018 Original
218 SgTPP/12212 Construction of Chemical Store Building at DM Plant area of SgTPP, Murshidabad 04-07-2018 Original
219 STPS/12281 Making Lavatory two (02) nos. at CHP, STPS 12-07-2018 Original
220 STPS/12280 ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I dept. of 250 MW unit #5 & 6 of STPS, WBPDCL 04-07-2018 Original
221 STPS/12279 Procurement of Seal Wear Ring & Trunnian Bush for Coal Mill XRP-883 of Unit-5 & 6 under BMD Santaldih T.P.S., the WBPDCL 10-07-2018 Original
222 STPS/12278 Procurement of Grinding Elements (Grinding Roll & Bull Ring Segment) for Unit # 5 & 6 XRP-883 Coal Mill under B&A, dept., Santaldih T.P.S., the WBPDCL 04-07-2018 Original
223 STPS/12277 Procurement of 1000 Ltr. Hydrazine Hydrate, IS: 12086-1987, Purity: 80% as N2H4, H2O and50% as N2H4 under Chemical Dept., Santaldih T.P.S., the WBPDCL 04-07-2018 Original
224 BTPS/12223 Procurement of 50MT of Caustic Soda Flakes for chemical Laboratory, BTPS,WBPDCL 20-07-2018 Original
225 BTPS/12222 Cleaning of drains, culverts, road flanks etc. at coal yard and other areas at BTPS 13-07-2018 Original
226 BTPS/12221 Repairing of Coal Bunkers of Unit No.#5 with MS/SS lining in Slope Portion during Unit#5 overhauling under B&A(5th Unit), BTPS, WBPDCL 16-07-2018 Original
227 BTPS/12220 Servicing of different High Pressure Valves during Unit # 5 overhauling under B&A (5th Unit), BTPS, WBPDCL 09-07-2018 Original
228 BTPS/12219 Overhauling Job of Wagon Tippler # 2 at CHP, BTPS 10-07-2018 Original
229 BTPS/12218 Repair of high drain from ABL Qtr. to bell mouth of Sullage Pump at BTPS 09-07-2018 Original
230 BTPS/12217 Widening & Strengthening of Road side (Silo wall side) outside the SILO area at BTPS 09-07-2018 Original
231 STPS/12276 Rate Contract of DM Plant, Acid storage tank (HCL & H2SO4), Oil related drum transport, tank & cooler cleaning under T&A Dept., for 02 (two) years , at STPS , WBPDCL 28-06-2018 Original
232 STPS/12275 Procurement of 120 MT Alumino Ferric, IS 299:2012 GR- IV under Chemical Dept., Santaldih T.P.S., the WBPDCL 26-06-2018 Original
233 CORP/12177 Courier service job from Bidyut Unnayan Bhaban to locally within West Bengal, across inter-state and international locations. 06-07-2018 Original
234 CORP/12176 Demarcation of 20.40 Ha within mining lease area of 846.93 Ha of non-forest land of Pachhwara (North) coal mine by R.C.C. boundary pillars 11-07-2018 Original
235 CORP/12175 Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Barjore Coal Mine, Birbhum, to supervise the mining activities 02-07-2018 Original
236 CORP/12174 Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Tara (East & West) Coal Mine, West Bardhaman, to supervise the mining activities 02-07-2018 Original
237 CORP/12173 Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Barjora North Coal Mine, Bankura, to supervise the mining activities 02-07-2018 Original
238 BTPS/12216 Procurement of Air preheater ferrule for Units #5 (1X210 MW), BTPS 04-07-2018 Original
239 SgTPP/12211 Cleaning the premises of each ‘D-type’, ‘C-type’ building and FH (Flat)-I including removing of conservancy garbage mixed with rubbish and other filthy materials from dustbin at SgTPP Township 18-06-2018 27-06-2018 Original
240 SgTPP/12210 Cleaning the premises of each ‘B-type’ building (Qtr. No.- B-1 to B-89), FH(Flat)-II and FH(Barrack)-I to III including removing of conservancy garbage mixed with rubbish and other filthy materials from dustbin at SgTPP Township 18-06-2018 27-06-2018 Original