3961 | STPS/12568 | WBPDCL/STPS/NIT/E1855/19-20 | Procurement of Straight Coal Carrying Pipe for Overhauling of Unit-6 in the year 2020 under BMD,STPS. | 23-09-2019 | Original | ||
3962 | CORP/12269 | WBPDCL/CORP/NIT/E1268/19-20 | Hiring of a Non- A.C four wheeler commercial vehicle at Asansol Area | 17-09-2019 | 17-09-2019 | Original | |
3963 | KTPS/12350 | GM(K)/CC/CHP-M/2512(Vol 5)/E1390 | Annual Rate Contract for deployment of Eleven(11) nos. of 50 Seater Standard Buses with Registration not before the year 2013 and having carriage contract type registration , for transportation of employees of Kolaghat Thermal Power Station, WBPDCL from | 30-09-2019 | Original | ||
3964 | KTPS/12349 | GM(K)/CC/T&A OPH/3004 (Vol 3)/E1389 | Annual Rate Contract for Various types of tit-bit maintenance jobs (day to day manpower basis) at DM plant stg.I &II , PTP , CW pump house-stg-I II , CTMU pump house , acidulation plant stg. I & II under TAOPH | 30-09-2019 | Original | ||
3965 | STPS/12567 | WBPDCL/STPS/NIT/E1862/19-20 | Hiring of 02 no. pick up van with drivers at STPS , WBPDCL . | 27-09-2019 | 27-09-2019 | Original | |
3966 | STPS/12566 | WBPDCL/STPS/NIT/E1850/19-20 | Annual Maintenance Contract for various equipments like heavy vehicles , dozer , DG set etc . under workshop department at STPS , WBPDCL . | 26-09-2019 | 26-09-2019 | Original | |
3967 | STPS/12565 | WBPDCL/STPS/NIT/E1861/19-20 | Rate Contract for Noise Measurement in different locations of STPS Plant , STPS ,WBPDCL | 14-09-2019 | 14-09-2019 | Original | |
3968 | SgTPP/12346 | WBPDCL/SGTPP/NIT/E1306/19-20 | MECHANICAL MAINTENANCE CONTRACT FOR T&A-IPH OF UNIT#3&4(2X500MW), FOR ONE (01) YEAR | 28-08-2019 | 25-09-2019 | Original | |
3969 | SgTPP/12345 | WBPDCL/SGTPP/NIT/E1304/19-20 | Housekeeping & Cleaning of Stage-II(2X500MW) Boiler & Aux. Equipment area and Operation & tit-bit Maintenance of MRHS for 1 year. | 23-09-2019 | 23-09-2019 | Original | |
3970 | BkTPP/12336 | WBPDCL/BKTPP/NIT/1370/19-20 | CONSTRUCTION OF REST ROOM WITH BATHROOM FOR THE CLEANING STAFFS AT CHP, BKTPP | 27-08-2019 | Original | ||
3971 | CORP/12268 | WBPDCL/CORP/NIT/E1266/19-20 | Hiring of an A.C four wheeler vehicle for the use of GM (Mining) at Durgapur office under WBPDCL | 13-09-2019 | Original | ||
3972 | BkTPP/12335 | WBPDCL/BKTPP/NIT/E1381/19-20 | ANNUAL CONTRACT FOR ENGAGEMENT OF DOZER OPERATOR AT CHP, BKTPP | 23-09-2019 | Original | ||
3973 | KTPS/12348 | GM(K)/ CC/ Env / 2704 (Vol 4)/E1387 | Annual Rate Contract for Environmental Monitoring and submission of Annual Statement for KTPS, WBPDCL. | 16-09-2019 | Original | ||
3974 | STPS/12564 | WBPDCL/STPS/NIT/E1845/19-20 | Procurement of SKF make Induction Heater, Model TIH 100m for Bearing heating (Max weight up to 120 kg, Bore Dia 20-400 mm) under BMD , STPS. | 13-09-2019 | Original | ||
3975 | STPS/12563 | WBPDCL/STPS/NIT/E1854/19-20 | Procurement & Complete replacement of fill materials(V-bars, grids etc.) of 6 (six) no cells of Unit 6 Cooling Tower(PCTL make), Santaldih T.P.S., the WBPDCL | 30-09-2019 | Original | ||
3976 | STPS/12562 | WBPDCL/STPS/NIT/E1853/19-20 | Supply of different categories of unskilled workers (Agreemental-A & Agreemental-B) related with the work annual maintenance of roof cleaning, sweeping, cleaning and miscellaneous works within STPS (T). | 23-09-2019 | 23-09-2019 | Original | |
3977 | STPS/12561 | WBPDCL/STPS/NIT/E1852/19-20 | Grinding and polishing of floor & new construction of Terrazzo floor at STPS Employee Canteen. | 23-09-2019 | 23-09-2019 | Original | |
3978 | BkTPP/12334 | WBPDCL/BKTPP/NIT/E1380/19-20 | PAINTING OF TWIN OVERGROUND WATER PIPE LINES [OD - 930 MM & 130 MM] FROM VALVE HOUSE TO RAW WATER POND AND OUTSIDE PLANT OF BKTPP | 19-09-2019 | Original | ||
3979 | CORP/12267 | WBPDCL/CORP/NIT/E1264/19-20 | Invitation of tender for loading of coal into rail wagons at Tapsi Railway Siding of Eastern Railway including arrangement of weighment of the coal rake | 25-09-2019 | Original | ||
3980 | KTPS/12347 | WBPDCL/KTPS/NIT/E1376/19-20 | WBPDCL/KTPS/NIT/E1376/19-20(Tender ID:2019_WBPDC_240283_1) Supply of LED Luminaire for unit #1,2,3,DM Plant and CHP area under CAPEX,FY: 2019-20 | 24-09-2019 | Original | ||
3981 | SgTPP/12344 | WBPDCL/SGTPP/NIT/E1307/19-20 | Stage-I and II Chlorination System at SgTPP, Murshidabad for 1 year with a provision of 06 months extension. | 14-09-2019 | Original | ||
3982 | CORP/12266 | WBPDCL/CORP/NIT/E1263/19-20 | Invitation of bids for Levelling and Grading Works at Bhanora Loop Railway Siding in the District-Pachim Bardhaman, Block-Jamuria | 11-09-2019 | Original | ||
3983 | BkTPP/12333 | WBPDCL/BKTPP/NIT/E1378/19-20 | Supply of Caustic Soda Flakes | 11-09-2019 | Original | ||
3984 | BkTPP/12332 | WBPDCL/BKTPP/NIT/E1379/19-20 | ERECTION OF HYDRANT & SPRAY LINE AT STAGE-I BOILER, GT & UAT AREA IN BKTPP | 16-09-2019 | Original | ||
3985 | KTPS/12346 | GM(K)/CC/Stores/3208/E1379/19-20 | Supply , dismantle and erection and commissioning for repair of existing bin rack at Godown No. 7 under O&M store | 16-09-2019 | Original | ||
3986 | KTPS/12345 | GM(K)/CC/TM/3137 (Vol.2)/E1341/19-20 | Annual Rate contract for Maintenance as & when required basis for Rubber & FRP lining, Acid & Caustic line Valve maintenance at DM Plant | 16-09-2019 | Original | ||
3987 | BkTPP/12331 | WBPDCL/BKTPP/NIT/E1377/19-20 | Supply of Valves with Matching Flanges | 04-09-2019 | Original | ||
3988 | BkTPP/12330 | WBPDCL/BKTPP/NIT/E1369/19-20 | Supply of ERW Pipes | 04-09-2019 | Original | ||
3989 | KTPS/12344 | WBPDCL/KTPS/NIT/E1383/19-20 | Renovation of old and dilapidated water supply pipe network at KTPS Township | 21-09-2019 | 21-09-2019 | Original | |
3990 | STPS/12560 | WBPDCL/STPS/NIT/E1849/19-20 | Supplying ,Erection & commissioning of Moulded FRP gratings in 11 no. Of CT cells of Unit #5 Cooling Tower at STPS | 16-09-2019 | 16-09-2019 | Original | |
3991 | STPS/12559 | WBPDCL/STPS/NIT/E1848/19-20 | Annual Job Contract for Cleaning of the Zone "After Crusher to Bunker" (All Conveyor belts and associated areas etc.) in CHP, WBPDCL . | 30-09-2019 | 30-09-2019 | Original | |
3992 | KTPS/12343 | WBPDCL/KTPS/NIT/E1377/19-20 | : DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 05 (FIVE) NOS 20M & 03 (THREE) NOS 25M HIGH MAST LIGHTING SYSTEM with LED fittings & accessories for Plant & Township area of KTPS under CAPEX,F.Y. 19-20. | 16-09-2019 | 16-09-2019 | Original | |
3993 | STPS/12558 | WBPDCL/STPS/NIT/E1846/19-20 | Job contract for painting of hot distribution pipe line of 5th Unit Cooling tower at STPS, WBPDCL | 11-09-2019 | 11-09-2019 | Original | |
3994 | STPS/12557 | WBPDCL/STPS/NIT/E1823/19-20 | SUPPLY INSTALATION AND COMISSINING OF METAL DETECTOR AT NC-1 at CHP, STPS under CHP (E/M) Dept., Santaldih T.P.S., the WBPDCL. | 31-08-2019 | 31-08-2019 | Original | |
3995 | BTPS/12373 | WBPDCL/BTPS/NIT/E1579/19-20 | Procurement of Caustic soda flakes for Chemical laboratory for BTPS of WBPDCL . | 12-09-2019 | Original | ||
3996 | KTPS/12342 | WBPDCL/KTPS/NIT/E1359/19-20 | Renovation of external portion of power house building of KTPS, Stage-I and Stage-II. | 21-09-2019 | 21-09-2019 | Original | |
3997 | CORP/12265 | WBPDCL/CORP/NIT/E1260/19-20 | Providing Security Service at Bandel Thermal Power Station | 16-09-2019 | Original | ||
3998 | CORP/12264 | WBPDCL/CORP/NIT/E1258/19-20 | Installation of Solar Power Evacuation line at SgTPP by extending 220KV Bus | 20-09-2019 | Original | ||
3999 | KTPS/12341 | GM(K)/CC/MO/2769 (Vol. 3)/E1378/19-20 | Annual Rate Contract for Supply of casual workers as & when required basis for day to day activities at all units , under MO Dept. KTPS and Arch breaking and cleaning of coal bunker at Unit # 1 to # 6, under MO Dept . | 10-09-2019 | Original | ||
4000 | CORP/12263 | WBPDCL/CORP/NIT/E1261/19-20 | Invitation of Bids for the work of “Supply, Placement and Maintenance of decorative living indore potted plants for the period of one year ( i.e, 01/02/2020 to 31/01/2021) at Bidyut Unnayan Bhaban, 3/C, LA Block, Salt Lake, WBPDCL” | 11-09-2019 | Original |