4081 | BkTPP/12318 | WBPDCL/BKTPP/NIT/E1354/19-20 | Supply Of Dry Type Transformer | 23-07-2019 | Original | ||
4082 | BkTPP/12317 | WBPDCL/BKTPP/NIT/E1352/19-20 | Supply Of 400 Kv & 220 Kv Current Transformers | 06-08-2019 | Original | ||
4083 | BkTPP/12316 | WBPDCL/BKTPP/NIT/E1351/19-20 | Replacement Of Existing Conventional Luminaries By Energy Saving Led Luminaries | 26-07-2019 | Original | ||
4084 | STPS/12519 | WBPDCL/STPS/NIT/E1794/19-20 | Procurement of MS Pipe Line for damaged Spray Water Line replacement under F&S Dept., Santaldih T.P.S., the WBPDCL. | 25-07-2019 | 25-07-2019 | Original | |
4085 | SgTPP/12338 | WBPDCL/SGTPP/NIT/E1297/19-20 | Annual maintenance contract of Boiler & Auxiliary system Stage I , 2 x 300 MW , SgTPP. | 26-07-2019 | 26-07-2019 | Original | |
4086 | KTPS/12335 | WBPDCL / KTPS / NIT /E-1368/19-20 | Supply of 12.5 Km MS ERW Pipes of different Sizes for F&S Cell at KTPS (2nd Phase) under CAPEX for the FY: 2019-20 | 29-07-2019 | Original | ||
4087 | STPS/12518 | WBPDCL/STPS/NIT/E1810/19-20 | Procurement of spares for Bowl Mill XRP-883 for regular & Overhauling maint. of Mill under BMD, STPS. | 23-07-2019 | Original | ||
4088 | KTPS/12334 | GM(K)/CC/ F&S /3198/E1366/19-20 | Laying of 12.5 Kms MS ERW pipes of different sizes (250/200/150/100/80 NB) including supply of valves, bends, MS Tee, nuts, bolts, rubber-gaskets etc. & painting to replace old underground / above-ground CI/MS Fire water pipe lines at KTPS through CAPEX | 20-07-2019 | Original | ||
4089 | STPS/12517 | WBPDCL/STPS/NIT/E1813/19-20 | Overhauling Job of different 415V AC & 220V DC L.T. Motors of Unit#5 under IPH (E/M) Dept. STPS. | 23-07-2019 | Original | ||
4090 | STPS/12516 | WBPDCL/STPS/NIT/E1811/19-20 | Overhauling of LT Motors of Unit#5 AHP during unit OH under AHP (E/M) Dept, STPS. | 23-07-2019 | Original | ||
4091 | KTPS/12333 | GM(K)/CC/ EMOPH /3199/E1367/19-20 | Laying & Erection of 415V LT Underground Cable & Wire along with other associated things in place of Over head LT Line at KTPS Township area at KTPS through CAPEX Budget approval of F.Y.2019-2020. | 20-07-2019 | Original | ||
4092 | KTPS/12332 | GM(K)/CC/EM-OPH /2831(Vol 4)/E1372 | Annual service contract for Man power supply for various maintenance work(daily basis) under EM-OPH 3 and EM-IPH-III . | 20-07-2019 | Original | ||
4093 | BkTPP/12315 | WBPDCL/BKTPP/NIT/E1361/19-20 | Supply of Alumino Ferric(Alum) | 17-07-2019 | Original | ||
4094 | BkTPP/12314 | WBPDCL/BKTPP/NIT/E1357/19-20 | AMC of radial gate and accessories including operation of submersible pump and cleaning of sump pump in well at BK Dam,BKTPP | Original | |||
4095 | CORP/12259 | WBPDCL/CORP/NIT/E1251/19-20 | Renovation work of reception area at Bidyut Unnayan Bhaban of WBPDCL Corporate office | 29-07-2019 | Original | ||
4096 | BkTPP/12313 | WBPDCL/BKTPP/NIT/E1356/19-20 | ANNUAL CIVIL MAINTENANCE OF BKDAM INCLUDING BIPH AT BKTPP | Original | |||
4097 | STPS/12515 | WBPDCL/STPS/NIT/E1808/19-20 | Cleaning, sweeping of Mill area, ESP area, Vacuum pump house, Booster pump house, Feeder area, Bunker roof area, Boiler area, Chimney area, etc. of the inside plant premises of unit #5, STPS, WBPDCL | 24-07-2019 | 24-07-2019 | Original | |
4098 | BkTPP/12312 | WBPDCL/BKTPP/NIT/E1356/19-20 | Original | ||||
4099 | STPS/12514 | WBPDCL/STPS/NIT/E1812/19-20 | Cleaning with removal of coal, coal-dust, rejection coal, scraped materials, deposited mixed earth, garbage, foreign materials and transportation of same from mill areas of Power House of Unit #5 & #6 to the disposal yard of STPS. | 24-07-2019 | 24-07-2019 | Original | |
4100 | STPS/12513 | WBPDCL/STPS/NIT/E1809/19-20 | Cleaning, sweeping, washing etc of different floors etc of different buildings, Rest Rooms and areas of CHP at STPS. | 24-07-2019 | 24-07-2019 | Original | |
4101 | BkTPP/12311 | WBPDCL/BKTPP/NIT/E1355/19-20 | ANNUAL MAINTENANCE AND PROCTECTION OF PLANTATION AND GARDENING OF COMMON PLACE OF BKTPP TOWNSHIP AREA | Original | |||
4102 | SgTPP/12337 | WBPDCL/SGTPP/NIT/E1296/19-20 | GCR & Relay Room and Unit#1 &2 Central AC Discharge Duct Re-insulation at SgTPP, Murshidabad. | 23-07-2019 | Original | ||
4103 | KTPS/12331 | WBPDCL/KTPS/NIT/E1369/19-20 | Construction of single storey extension building of KTPP English medium school at KTPS Township. | 27-07-2019 | 27-07-2019 | Original | |
4104 | SgTPP/12336 | WBPDCL/SGTPP/NIT/E1295/19-20, Dated: 24/06/2019 | Construction of two storied building with open yard for AMC personnel near TP-15 inside plant of SgTPP. | 30-07-2019 | Original | ||
4105 | SgTPP/12335 | WBPDCL/SGTPP/NIT/E1293/19-20, dtd.: 18/06/2019 | Annual housekeeping works at different Plant buildings of phase #1 & phase #2 of SgTPP/ WBPDCL for the year 2019-20. | 20-07-2019 | Original | ||
4106 | STPS/12512 | WBPDCL/STPS/NIT/E1805/19-20 | Supply and delivery of compressed purified hydrogen gas Conforming to IS: 1090/1983, Grade-II having Minimum 99.9995% purity (Vol.) under Operation Dept., Santaldih T.P.S., the WBPDCL. | 16-07-2019 | Original | ||
4107 | BkTPP/12310 | WBPDCL/BKTPP/NIT/E1358/19-20 | Supply of Air Pre-Heater Tubes | 10-07-2019 | Original | ||
4108 | SgTPP/12334 | WBPDCL/SGTPP/NIT/E1278/19-20, Date: 21/05/2019 | Widening & repairing of Type I Road from Township Gate to Gate No: 3 and road of School, Hospital and mini market at SgTPP Township. | 23-07-2019 | Original | ||
4109 | SgTPP/12333 | WBPDCL/SGTPP/NIT/E1294/19-20 | Procurement of FRP Blade Assembly ,Drive Shaft Assembly , Performance Testing for CT Fan of Cooling Tower Stage-1 for Sagardighi Thermal Power Project, WBPDCL | 19-07-2019 | Original | ||
4110 | STPS/12511 | WBPDCL/STPS/NIT/E1806/19-20 | Annual maintenance of different type quarters with minor civil & structural works at STPS (T/S) Group – II. | 18-07-2019 | 18-07-2019 | Original | |
4111 | CORP/12258 | WBPDCL/CORP/NIT/E1250/19-20 DATED.25.06.2019 | Renovation of 3rd floor seminar hall of Bidyut Unnayan Bhaban, Corporate Office,the WBPDCL | 19-07-2019 | Original | ||
4112 | KTPS/12330 | WBPDCL / KTPS / NIT /E-1343/19-20 | PROCUREMENT OF 6 NOS. OF REFRIGERANT TYPE HYDROGEN GAS DRYER | 18-07-2019 | Original | ||
4113 | KTPS/12329 | WBPDCL / KTPS / NIT /E-1356/19-20 | PROCUREMENT OF 2 NOS. RACK AND PINION TYPE CHIMNEY LIFT | 15-07-2019 | Original | ||
4114 | KTPS/12328 | WBPDCL / KTPS / NIT /E-1350/19-20 | PROCUREMENT OF ECONOMISER 83 NOS. TOP BANK COIL | 15-07-2019 | Original | ||
4115 | KTPS/12327 | WBPDCL / KTPS / NIT /E-1348/19-20 | PROCUREMENT OF ECONOMISER 143 NOS. BOTTOM BANK COIL | 15-07-2019 | Original | ||
4116 | STPS/12510 | WBPDCL/STPS/NIT/E1798/19-20 | Repair with replacement of damaged roof sheeting & wall cladding at Track Hopper of STPS | 12-07-2019 | 12-07-2019 | Original | |
4117 | STPS/12509 | WBPDCL/STPS/NIT/E1802/19-20 | Jack pushing work for laying of ash slurry disposal lines under railway track under scope of unit#6 at STPS. | 19-07-2019 | 19-07-2019 | Original | |
4118 | SgTPP/12332 | WBPDCL/SGTPP/NIT/E1282/19-20 | Annual mechanical , Electrical maintenance and Operation assistance of Ash handling plant , Stage I 2x300 MW SgTPP. | 22-07-2019 | 22-07-2019 | Original | |
4119 | BTPS/12356 | WBPDCL/BTPS/NIT/E1560/19-20 | Construction of shed at top roof of ESP of 5th Unit at BTPS. | 18-07-2019 | Original | ||
4120 | SgTPP/12331 | WBPDCL/SGTPP/NIT/E1290/19-20 | Annual Maintenance Contract of C&I system (Mandatory Jobs & Optional Jobs) at SgTPP, Stg-II" for one year with a provision of extension of another six months | 17-07-2019 | 17-07-2019 | Original |