The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4281 | BkTPP/12291 | WBPDCL/BKTPP/NIT/E1331/19-20 | ANNUAL SERVICE CONTRACT FOR CONDITION MONITORING OF DIFFERENT CRITICAL EQUIPMENTS AT BKTPP | 25-05-2019 | 25-05-2019 | Original | |
4282 | BkTPP/12290 | WBPDCL/BKTPP/NIT/E1330/19-20 | PAINTING OF CW HOT WATER PIPELINES OF COOLING TOWERS # UNIT-1 TO 3 , OVER GROUND AND ABOVE HOT WATER BASIN ALONG WITH ASSOCIATED VENT LINES, FLOW CONTROL VALVES & MONO-RAILS AT BKTPP. | 22-05-2019 | 22-05-2019 | Original | |
4283 | BTPS/12337 | WBPDCL/BTPS/NIT/E1545/19-20 | Renovation of Road from SILO to Guest House of BTPS | 28-05-2019 | Original | ||
4284 | STPS/12447 | WBPDCL/STPS/NIT/E1722/18-19 | Procurement of Solid Oil Seal (MOC:VITON)for Roller Journal Assy of Bowl Mill XRP-883 under BMD,STPS. | 20-05-2019 | Original | ||
4285 | STPS/12446 | WBPDCL/STPS/NIT/E1723/18-19 | Procurement of various MS Pipes for forthcoming OH of Unit#5 under AHP(M/M) Dept. | 16-05-2019 | Original | ||
4286 | CORP/12240 | WBPDCL/CORP/NIT/E1232/19-20 | Renovation & interior works of Guest House at Bidyut Unnayan Bhaban of WBPDCL Corporate office | 22-05-2019 | Original | ||
4287 | BkTPP/12289 | WBPDCL/BKTPP/NIT/E1326/19-20 | PREPARATION AND MAINTENANCE OF LAWN, HEDGE LINE, S. F. BED AND PLANTATION AT ADMINISTRATIVE BUILDING, SIMULATOR BLDG., PRIMARY SCHOOL, HIGH SCHOOL, HOSPITAL,SONAJHURI FOUNTAIN, FIELD HOSTEL, TILPARA INTAKE, ABDARPUR GUEST HOUSE IN BKTPP | Original | |||
4288 | STPS/12445 | WBPDCL/STPS/NIT/E1743/19-20 | Modification of existing tiles flooring in connection with insulation coating at different switch gear rooms across the plant premises of STPS. | 22-05-2019 | 22-05-2019 | Original | |
4289 | STPS/12444 | WBPDCL/STPS/NIT/E1744/19-20 | Construction of RCC rack inside main godown ,BHEL#1 & BHEL#2 godowns of O&M store premises at STPS. | 22-05-2019 | 22-05-2019 | Original | |
4290 | STPS/12443 | WBPDCL/STPS/NIT/E1741/19-20 | Annual maintenance of different type quarters with minor civil & structural works at STPS (T/S) Group – II. | 22-05-2019 | 22-05-2019 | Original | |
4291 | STPS/12442 | WBPDCL/STPS/NIT/E1742/19-20 | Extending consultancy services for Installation of sewage treatment plant at Santaldih Thermal Power Station Township & Plant, Purulia, West Bengal. | 22-05-2019 | 22-05-2019 | Original | |
4292 | STPS/12441 | WBPDCL/STPS/NIT/E1745/19-20 | Deployment of 59(Fifty Nine) nos. unskilled workers and 01(One) no. Supervisor for providing services to various departments at STPS as per discretion of STPS Authority. | 29-05-2019 | Original | ||
4293 | STPS/12440 | WBPDCL/STPS/NIT/E1738/19-20 | Procurement of Grinding Elements (Grinding Roll & Bull Ring Segment) for Unit # 5 & 6 XRP-883 Coal Mill under B&A,dept., STPS. | 21-05-2019 | Original | ||
4294 | STPS/12439 | WBPDCL/STPS/NIT/E1729/19-20 | Procurement of HT Underground Cable for replacement of existing Overhead 11 kV Feeders under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. | 21-05-2019 | 21-05-2019 | Original | |
4295 | BkTPP/12288 | WBPDCL/BKTPP/NIT/E1272/18-19 | ANNUAL CONTRACT FOR HOUSEKEEPING WORK AT CHP AREA AND DM PLANT AREA, HYDROGEN PLANT, AMC BUILDING AT BKTPP | Original | |||
4296 | BkTPP/12287 | WBPDCL/BKTPP/NIT/E1332/19-20 | Supply of Indigenous RJA Bearings for Bowl Mill (XRP-883) for Stage-II | 22-05-2019 | Original | ||
4297 | BTPS/12336 | WBPDCL/BTPS/NIT/E1544/19-20 | Supply & delivery of Energy efficient LED luminaruies for CHP, BTPS, WBPDCL | 24-05-2019 | Original | ||
4298 | SgTPP/12313 | WBPDCL/SGTPP/NIT/E1269/19-20 | Over hauling of Unit#1 Boiler parts, HP & Safety Valves, Soot Blowers for Boiler Efficiency improvement, steaming license renewal at SGTPP, WBPDCL. Murshidabad | 22-05-2019 | 18-05-2019 | Original | |
4299 | BTPS/12335 | WBPDCL/BTPS/NIT/E1543/18-19 | Renovation of hospital building along with the surrounding boundary walls at BTPS Township | 21-05-2019 | Original | ||
4300 | CORP/12239 | WBPDCL/CORP/NIT/E1231/19-20 | BENEFICIATION OF MCL COAL FOR WBPDCL POWER PLANTS | Original | |||
4301 | SgTPP/12312 | WBPDCL/SGTPP/NIT/E1266/19-20 | Procurement of Different Types Of Cable For IT &C Department, Sagardighi Thermal Power Project, WBPDCL | 02-05-2019 | Original | ||
4302 | STPS/12438 | WBPDCL/STPS/NIT/E1733/19-20 | Cable laying of 3C,185 Sq.MM, Al, H.T. UG cable & other related works for Up gradation of existing OH 11KV Township Power supply # I & 2 from Plant To Township & inside the T/S under EM-OPH Dept. | 16-05-2019 | 16-05-2019 | Original | |
4303 | BTPS/12334 | WBPDCL /BTPS/NIT/E1542/19-20 | Maintenance of Railway siding owned by BTPS at Tribeni, Hooghly. | 21-05-2019 | Original | ||
4304 | STPS/12437 | WBPDCL/STPS/NIT/E1712/18-19 | Procurement of Spares of FAE Tower of Unit#5 for forthcoming O/H (Aug-Sep'2019) under AHP(M/M) Dept. of STPS. | 10-05-2019 | Original | ||
4305 | STPS/12436 | WBPDCL/STPS/NIT/E1647/18-19 | AMC for T&A area for 2 X 250 MW unit of STPS , WBPDCL. | 16-05-2019 | 16-05-2019 | Original | |
4306 | BTPS/12333 | WBPDCL/BTPS/NIT/E1541/19-20 | Installation of insulating floor coating at 6.6KV and 415v Switchgear at BTPS under IPH (E/M), OPH(E/M)and CHP(E/M) Dept. | 13-05-2019 | 13-05-2019 | Original | |
4307 | KTPS/12297 | WBPDCL/KTPS/NIT/E1329/19-20 | Thorough renovation of external surface and roof treatment of ESP control room of Unit # 3 at KTPS. | 25-05-2019 | 25-05-2019 | Original | |
4308 | KTPS/12296 | WBPDCL/KTPS/NIT/E1325/18-19 | Annual Rate Contract for Servicing & Repairing of LP Valves along with supply Spares (Mandatory & Optional) under T&A, KTPS. | 22-05-2019 | Original | ||
4309 | STPS/12435 | WBPDCL/STPS/NIT/E1734/19-20 | Rate Contract for Erosion resistance metal coating on boiler tube of Unit#5 boiler , STPS ,WBPDCL | 14-05-2019 | 14-05-2019 | Original | |
4310 | SgTPP/12311 | WBPDCL/SGTPP/NIT/E1265/19-20 | Refurbishment of Rotary and static coal nozzle ring for coal mill ZGM1123N. | 10-05-2019 | 10-05-2019 | Original | |
4311 | SgTPP/12310 | WBPDCL/SGTPP/NIT/E1267/19-20 | Contract for O/H Maintenance of Duct,Damper,Expension Bellow,Gates & Actuators at Unit#1 Scheduled in the month of july-Aug,2019. | 10-05-2019 | 10-05-2019 | Original | |
4312 | STPS/12434 | WBPDCL/STPS/NIT/E1705/18-19 | Annual Maintenance Contract for C&I System for 2 X 250 MW unit at STPS | 13-05-2019 | 13-05-2019 | Original | |
4313 | SgTPP/12309 | WBPDCL/SGTPP/NIT/E1232/18-19 | Deployment of semi-skilled/Unskilled Manpower as and when require basis at SgTPP. | 15-05-2019 | 15-05-2019 | Original | |
4314 | SgTPP/12308 | WBPDCL/SGTPP/NIT/E1261/18-19 | Overhauling of burner, SADC , CCP etc at unit #I , SgTPP (2x300) MW | 02-05-2019 | 18-04-2019 | Original | |
4315 | STPS/12433 | WBPDCL/STPS/NIT/E1714/18-19 | Rewiring and installations of electrical fittings at security barrack at Trainee Hostel and proposed security barrack DUTTA BANDH with supply of all materials under OPH Dept. Santaldih T.P.S. | 09-05-2019 | Original | ||
4316 | STPS/12432 | WBPDCL/STPS/NIT/E1721/18-19 | Overhauling job of different HT Motors of Unit#5 AHP during unit OH under AHP (E/M) Dept STPS | 09-05-2019 | Original | ||
4317 | STPS/12431 | WBPDCL/STPS/NIT/E1726/18-19 | Rotation/Replacement of BA/Silo Slurry line and HP & LP Pump suction line with painting for the upcoming OH of Unit #5 under AHP (MM), STPS. | 09-05-2019 | Original | ||
4318 | BkTPP/12286 | WBPDCL/BKTPP/NIT/E1329/19-20 | ANNUAL MAINTENANCE CONTRACT FOR REGULAR CLEANING OF POWER HOUSE AREA (BOILER, TURBINE & AUXILIARY EQUIPMENT), INCLUDING OPTIONAL JOB OF U#1 – 5 OF BKTPP | 11-05-2019 | Original | ||
4319 | BTPS/12332 | WBPDCL/BTPS/NIT/E1539/19-20 | Handling of materials and different official works by deploying (03) three nos. non-listed manpower at store, BTPS” for 12 months | 08-05-2019 | Original | ||
4320 | BTPS/12331 | WBPDCL/BTPS/NIT/E1537/19-20 | ARC for overhauling of EL-76 Pulveriser & various type of maint. job of PA,ID FD Fan at units1-2 | 14-05-2019 | Original |