Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4321 | KTPS/12295 | WBPDCL / KTPS / NIT / E1317 / 18-19 | Procurement of 250 MT ALUMINO FERRIC, Grade - II used at ETP for KOLAGHAT THERMAL POWER STATION (6 X 210 MW). | 11-05-2019 | Original | ||
4322 | STPS/12430 | WBPDCL/STPS/NIT/E1728/19-20 | Operation and Maintenance of Industrial Relation Management System, Material Tracking System and Issuance of Visitor Photo Gate Pass and Vehicle Pass at Santaldih Thermal Power Station | 08-05-2019 | 08-05-2019 | Original | |
4323 | BTPS/12330 | WBPDCL /BTPS/NIT/E1532/18-19 | YEARLY CLEANING OF ASH FROM BOTTOM ASH HOPPER AND OTHER LOCATIONS OF STAGE – I AT BTPS. | 10-05-2019 | Original | ||
4324 | SgTPP/12307 | WBPDCL/SGTPP/NIT/E1264/18-19 | Annual grass, bush, jungle cutting, cleaning & removing work around different areas of Phase-II belonging north side of (+)1097M North road at SgTPP, Murshidabad. | 06-05-2019 | 06-05-2019 | Original | |
4325 | SgTPP/12306 | WBPDCL/SGTPP/NIT/1253/18-19 | Procurement of Boiler Tubes for Stage-2, Sagardighi Thermal Power Project, WBPDCL | 07-05-2019 | Original | ||
4326 | BkTPP/12285 | WBPDCL/BKTPP/NIT/E1321/18-19 | Supply of Window and Split AC machines | 24-04-2019 | Original | ||
4327 | SgTPP/12305 | WBPDCL/SGTPP/NIT/E1251/18-19 | Overhauling Unit#1 Preheater at SgTPP | 01-05-2019 | 01-05-2019 | Original | |
4328 | KTPS/12294 | GM(K)/CC/M.O/2735 (Vol 3)/E1324 | Annual Service Contract for the job of operation of Ammonia Dosing System and Chlori-nation Plant under Mechanical Operation department at KTPS. | 04-05-2019 | Original | ||
4329 | STPS/12429 | WBPDCL/STPS/NIT/E1727/18-19 | Annual Contract for Tit-Bit Maintenance & round the clock surveillance of Ash Slurry Pipe Lines of U#5&6 from outside boundary to Ash Pond under AHP (M/M) Dept, STPS | 30-04-2019 | 30-04-2019 | Original | |
4330 | CORP/12238 | WBPDCL/CORP/NIT/E1230/19-20 | Construction of Boundary wall at Bankura Railway siding | 07-05-2019 | Original | ||
4331 | SgTPP/12304 | WBPDCL/SGTPP/NIT/E1263/18-19 | Annual spraying work by de-weeding chemical in fire prone zone at plant premises of Phase-I and Phase-II area inside SGTPP. | 13-05-2019 | Original | ||
4332 | BkTPP/12284 | WBPDCL/BKTPP/NIT/E1328/19-20 | Supply of Plastic Refractory (Stage-II) | 24-04-2019 | Original | ||
4333 | SgTPP/12303 | WBPDCL/SGTPP/NIT/E1257/18-19 | Annual Maintenance Contract of ( 2 x 300 MW ) Turbine & auxiliary equipments under the scope of T&A – IPH department , SgTPP | 30-04-2019 | 30-04-2019 | Original | |
4334 | SgTPP/12302 | WBPDCL/SGTPP/NIT/E1262/18-19 | Annual Maintenance Contract regarding the job operation of Gate Valve for the drinking water at SgTPP Township by engaging three nos. of semi-skilled workers for a period of one year. | 08-05-2019 | Original | ||
4335 | SgTPP/12301 | WBPDCL/SGTPP/NIT/E1259/18-19 | ARC for miscellaneous Sanitary & Plumbing works (of maintenance) including drinking water pipeline (repairing & maintenance) at plant area of SgTPP for the year 2019-’20. | 30-04-2019 | Original | ||
4336 | SgTPP/12300 | WBPDCL/SGTPP/NIT/E1246/18-19 | Procurement of Different Types of ERW Black Pipe and Elbow of Sagardighi Thermal Power Project,WBPDCL | 03-05-2019 | Original | ||
4337 | SgTPP/12299 | WBPDCL/SGTPP/NIT/E1260/18-19 | Procurement of MS Pipe for Sagardighi Thermal Power Project, WBPDCL | 03-05-2019 | 03-05-2019 | Original | |
4338 | BkTPP/12283 | WBPDCL/BKTPP/NIT/E1327/19-20 | ANNUAL RATE CONTRACT FOR COAL UNLOADING FROM WAGONS AT TRACK HOPPER – 1 & 2 AND WAGON TIPPLER OF BKTPP | 01-05-2019 | Original | ||
4339 | KTPS/12293 | GM(K)/CC/ B&A /3088 (Vol 2)/E1322 | Day to day maintenance like repairing of coal pipe hanger of unit #4,APH,Coal burner,hoist maintenance job,material shortening at site store & material shifting etc. under boiler may under boiler maintenance stage –I & II. | 27-04-2019 | Original | ||
4340 | KTPS/12292 | WBPDCL/CORP/NIT/E1211/18-19 (2nd call) | Design ,Supply , Installation , Testing and Commissioning of New Rotaside Wagon Tippler and associated coal conveying and crushing plant at Kolaghat Thermal Power Plant | 21-05-2019 | Original | ||
4341 | KTPS/12291 | WBPDCL/KTPS/NIT/E1323/19-20 | Development of landscaping of park in front of B-42 bldg. at KTPS Township. | 11-05-2019 | 11-05-2019 | Original | |
4342 | BkTPP/12282 | WBPDCL/BKTPP/NIT/E1325/19-20 | Supply of Coal Mill Grinding Elements (6 Sets) | 30-04-2019 | Original | ||
4343 | BkTPP/12281 | WBPDCL/BKTPP/NIT/E1322/18-19 | Road reapiring and maintence work of bituminous road from plant main gate to simulator building and patch repairing at different locations within BkTPP Township area | Original | |||
4344 | BTPS/12329 | WBPDCL/BTPS/NIT/E1536/19-20 | Spares of LNAS burner of unit No. 5 at BTPS | 24-04-2019 | Original | ||
4345 | STPS/12428 | WBPDCL/STPS/NIT/E1725/19-20 | Annual civil maintenance of building at CHP area, administrative block area, canteen & BOP areas of unit #5 & #6 and minor civil & structural construction work at STPS. | 26-04-2019 | 26-04-2019 | Original | |
4346 | STPS/12427 | WBPDCL/STPS/NIT/E1724/19-20 | Maintenance of Railway track at STPS. | 26-04-2019 | 26-04-2019 | Original | |
4347 | BkTPP/12280 | WBPDCL/BKTPP/NIT/E1323/18-19 | TRANSPORTATION OF HYDROGEN CYLINDERS (FILLED/ EMPTY) TO & FRO BETWEEN BKTPP TO VCPPL, RANCHI AND VCPPL, RANCHI TO BKTPP | 03-05-2019 | 03-05-2019 | Original | |
4348 | BTPS/12328 | WBPDCL /BTPS/NIT/E1521/18-19 | ARC for administrative & other jobs deploying twenty nos. of regular supply labours at BTPS. | 26-04-2019 | Original | ||
4349 | BkTPP/12279 | WBPDCL/BKTPP/NIT/E1320/18-19 | Supply of MS Pipes for replacement of service water line | 16-04-2019 | Original | ||
4350 | KTPS/12290 | NIT NO: WBPDCL/KTPS/NIT/E1313/18-19 | Procurement of “Supply & Delivery of Air Pre-heater tubes for Overhauling of Unit # 1 of K.T.P.S.(e-tender) | 03-05-2019 | Original | ||
4351 | BkTPP/12278 | WBPDCL/BKTPP/NIT/E1324/19-20 | OVERHAULING OF ASH HANDLING PLANT OF UNIT#4 OF BKTPP | 25-04-2019 | Original | ||
4352 | STPS/12426 | WBPDCL/STPS/NIT/E1709/18-19 | Annual Maintenance Contract for 06 Nos. Intake Pumps installed at Bhojudih for Overhauling job of the Pumps and Running day to day maintenance of Pumps, under DGM(Maint.) Dept., Santaldih T.P.S.” | 22-04-2019 | 22-04-2019 | Original | |
4353 | KTPS/12289 | GM(K)/CC/TM/3167/E1303/18-19 | Rate Contract for Overhauling & Repairing of BFP Cartridges (Model: 200 KHI and FK-6D-30) along with the spares | 20-04-2019 | Original | ||
4354 | KTPS/12288 | WBPDCL/KTPS/NIT/E1321/18-19 | Hiring, installation and operation of pumps at different locations of KTPS plant for dewatering during monsoon of 2019. | 20-04-2019 | 20-04-2019 | Original | |
4355 | KTPS/12287 | WBPDCL/KTPS/NIT/E1320/18-19 | Construction of Fire wall at stage-I switchyard between 160 MVA Auto transformer and 31.5 MVA Reserve transformer at 132 KV switchyard at KTPS. | 20-04-2019 | 20-04-2019 | Original | |
4356 | STPS/12425 | WBPDCL/STPS/NIT/E1720/18-19 | Construction of a new open shed for bulky and heavy materials,especially heavy mandatory spares which is kept in the open yard around the main store. | 19-04-2019 | 19-04-2019 | Original | |
4357 | STPS/12424 | WBPDCL/STPS/NIT/E1719/18-19 | Loading, unloading and transportation of deposited ash, silt, slurry etc. from trenches, sub trenches, sump pit, ESP areas etc. and various types of ash, coal, dust etc. deposited in side plant area at STPS | 19-04-2019 | 19-04-2019 | Original | |
4358 | STPS/12423 | WBPDCL/STPS/NIT/E1718/18-19 | Repairing ,maintenance and painting of steel structure of TP37 and FRP water tank suppoting structure near fuel oil tank,STPS. | 19-04-2019 | 19-04-2019 | Original | |
4359 | STPS/12422 | WBPDCL/STPS/NIT/E1717/18-19 | Operation of Weigh Bridge in three shift by engaging four(04) nos. Aggr.B worker near Gate No.5 STPS. | 19-04-2019 | 19-04-2019 | Original | |
4360 | STPS/12421 | WBPDCL/STPS/NIT/E1716/18-19 | Maintenance of garden at Adm. building and new technical building area at STPS. | 19-04-2019 | 19-04-2019 | Original |