The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4721 | STPS/12338 | WBPDCL/STPS/NIT/E1611/18-19 | Procurement of 11 kV & 6.6 kV Indoor Cast Resin Current & Voltage Transformers under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. | 12-11-2018 | 12-11-2018 | Original | |
4722 | SgTPP/12250 | WBPDCL/SGTPP/NIT/E1203/18-19 | Annual contract for operation of pre treatment plant Stage I (2 x 300 MW) and Stage II (2 x 500 MW) of SgTPP for two (02) years. | 21-11-2018 | 21-11-2018 | Original | |
4723 | STPS/12337 | WBPDCL/STPS/NIT/E1607/18-19 | Procurement of SAIL/JSW/TATA/VISA make structural steel under CHP (MM) Dept., Santaldih T.P.S., the WBPDCL. | 22-11-2018 | 22-11-2018 | Original | |
4724 | KTPS/12208 | WBPDCL/KTPS/NIT/E1248/18-19 | Annual Maintenance Contract for Ash slurry disposal lines and its accessories under AHP,KTPS. | 22-11-2018 | Original | ||
4725 | STPS/12336 | WBPDCL/STPS/NIT/E1619/18-19 | Annual Maintenance Contract for Electrical Maintenance jobs of Coal Handling Plant of Unit#5& 6, under CHP (E/M) dept, STPS | 12-11-2018 | 12-11-2018 | Original | |
4726 | BTPS/12265 | WBPDCL/BTPS/NIT/E1470/18-19 | AMC for maintenance of 237nos. window, split & ductable ACs under EM(IPH), BTPS | 19-11-2018 | Original | ||
4727 | STPS/12335 | WBPDCL/STPS/NIT/E1601/18-19 | Procurement of different type of OFC cable under ITC Dept., Santaldih T.P.S., the WBPDCL. | 12-11-2018 | 12-11-2018 | Original | |
4728 | KTPS/12207 | 270CODS18-19GT | SUPPLY, ERECTION & COMMISSIONING OF PAGING SYSTEM FOR UNIT # 4 FOR REPLACEMENT OF OLD PAGING SYSTEM UNDER CAPEX 2018-19. | 09-11-2018 | 26-11-2018 | Original | |
4729 | KTPS/12206 | WBPDCL/KTPS/NIT/E1240/18-19 | Overhauling of boiler Non - pressure parts (APH, Air / Flue duct) for Unit # 1 Overhauling in January – 2019. | 24-11-2018 | Original | ||
4730 | KTPS/12205 | WBPDCL/KTPS/NIT/E1249/18-19 | Operation of unloading of Fly ash from Main silos( any three out of five) to Bowser, KTPS. | 22-11-2018 | Original | ||
4731 | STPS/12334 | WBPDCL/STPS/NIT/E1621/18-19 | Annual Maintenance Contract for maintenance of coal mill auto rejection system of Unit# 5 & 6 under M/M(B&A) dept, STPS. | 14-11-2018 | Original | ||
4732 | STPS/12333 | WBPDCL/STPS/NIT/E1613/18-19 | Annual Rate Contract(ARC) for Fire-Fighting system maintenance under F&S Dept., STPS. | 09-11-2018 | Original | ||
4733 | SgTPP/12249 | WBPDCL/SGTPP/NIT/E1195/18-19 | E-Tenders in prescribed format are invited in 4(Four) Part bid system in 3 (Three) Covers for supply & delivery of NAS Value Measurement instrument for Sagardighi Thermal Power Project, WBPDCL as mentioned in the BOQ, through electronic tendering (e-tende | 27-10-2018 | 27-10-2018 | Original | |
4734 | SgTPP/12248 | WBPDCL/SGTPP/NIT/E1198/18-19 | E-Tenders in prescribed format are invited from reputed Indian manufacturer having sound experience and financial capability in 4 (Four) Part bid in 3 (Three) covers for procurement of 6.6 KV 2000 KW PA Fan Motor for Sagardighi Thermal Power Project, WBPD | 27-10-2018 | 27-10-2018 | Original | |
4735 | STPS/12332 | WBPDCL/STPS/NIT/E1618/18-19 | Repair and maintenance work of Ash Pond ,STPS | 09-11-2018 | 09-11-2018 | Original | |
4736 | STPS/12331 | WBPDCL/STPS/NIT/E1617/18-19 | Repairing of road in between rail crossing near Nabagram village and Poradih village connecting bituminous road outside of plant boundary wall of STPS. | 09-11-2018 | 09-11-2018 | Original | |
4737 | STPS/12330 | WBPDCL/STPS/NIT/E1616/18-19 | Construction of toilet block at silo area near gate no.5 ,STPS. | 09-11-2018 | 09-11-2018 | Original | |
4738 | STPS/12329 | WBPDCL/STPS/NIT/E1615/18-19 | Repair and maintenance of compound wall and main boundary wall and other ancillary works at STPS (T). | 09-11-2018 | 09-11-2018 | Original | |
4739 | STPS/12328 | WBPDCL/STPS/NIT/E1614/18-19 | Transportation of conservancy materials, rubbish, plastic bags from STPS (T). | 09-11-2018 | 09-11-2018 | Original | |
4740 | KTPS/12204 | GM(K)/CC/EM-IPH/2908 (Vol 2)/E1236/18-19 | Annual Service Contract for maintenance of Illumination system and it's electrical circuitry, Mill Bay Cranes etc. under E/M-IPH department, KTPS | 24-11-2018 | Original | ||
4741 | SgTPP/12247 | WBPDCL/SGTPP/NIT/E1202/18-19 | Procurement of Spare Parts for Coal Mill XRP 1003 for Sagardighi Thermal Power Project, WBPDCL | Original | |||
4742 | SgTPP/12246 | WBPDCL/SGTPP/NIT/E1201/18-19 | Annual maintenance of Ash pond at SgTPP for the year 2019 | 05-11-2018 | Original | ||
4743 | SgTPP/12245 | WBPDCL/SGTPP/NIT/E1200/18-19 | Collection and bagging of sundried Cenosphere from ash pond and subsequently transportation to SgTPP Store, WBPDCL, .Murshidabad. | 31-10-2018 | 31-10-2018 | Original | |
4744 | KTPS/12203 | WBPDCL/KTPS/NIT/E1244/18-19 | Overhauling of ID Fan, Coal Pipe etc. of Boiler Non-pressure parts of Unit#1. | 14-11-2018 | Original | ||
4745 | KTPS/12202 | 253TUAS18-19CET | INVITATION FOR COMPETITIVE BIDS FOR SUPPLY & DELIVERY OF FRP BLADES WITH HUB ASSEMBLY & HARDWARE FOR COOLING TOWERS (STAGE I& II) , KTPS UNDER THE CAPEX BUDGET OF 2018-19 | 12-11-2018 | 26-11-2018 | Original | |
4746 | STPS/12327 | WBPDCL/STPS/NIT/E1606/18-19 | Procurement of Seal Assy for Cold Air Gate of Coal Mill during the Overhauling of Unit-5 in Aug-2019 under BMD, STPS. | 26-10-2018 | Original | ||
4747 | STPS/12326 | WBPDCL/STPS/NIT/E1610/18-19 | Procurement of Boiler Tube Guard of different size, Material SS-304 for Unit-5 Boiler OH Aug-19 under B&A dept, STPS | 02-11-2018 | Original | ||
4748 | KTPS/12201 | 269CEDS18-19GT | INVITATION OF COMPETITIVE BIDS FOR SUPPLY,ERECTION AND COMMISSIONING OF 25 METER HIGH MAST LIGHTING SYSTEM IN CHP AREA UNDER CAPEX 2018-18. | 09-11-2018 | 19-11-2018 | Original | |
4749 | CORP/12208 | WBPDCL/CORP/NIT/E1182/18-19 dated.23.07.18 | Supply and Erection of Boundary Pillars, carrying out DGPS Survey and preparation of KML file & Shape file for 174.98 Acre non-forest land for Compensatory Afforestation in Giridih District of Jharkhand | 30-11-2018 | Original | ||
4750 | STPS/12325a | WBPDCL/STPS/NIT/E1609/18-19 | Procurement of Infra-red Thermal Imaging Camera for Thermography Test at Switchyard & Transformers under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. | 31-10-2018 | 31-10-2018 | Original | |
4751 | STPS/12325 | WBPDCL/STPS/NIT/E1603/18-19 | PROCUREMENT OF CAUSTIC SODA FLAKES under Chemical Dept., Santaldih T.P.S., the WBPDCL. | 02-11-2018 | 02-11-2018 | Original | |
4752 | BTPS/12264 | WBPDCL/BTPS/NIT/E1468/18-19 | Annual Maintenance Contract for different Jobs of D. M. Plant and Canteen effluent treatment plant and Optional Jobs on Rate Contract basis at BTPS | 14-11-2018 | Original | ||
4753 | KTPS/12200 | WBPDCL/KTPS/NIT/E1247/18-19 | Overhauling of boiler pressure parts of Unit #1,during overhauling period. | 12-11-2018 | Original | ||
4754 | SgTPP/12244 | WBPDCL/SGTPP/NIT/E1199/18-19 | Deployment of semi-skilled/Unskilled Manpower as and when require basis at SgTPP | 07-11-2018 | 07-11-2018 | Original | |
4755 | SgTPP/12243 | WBPDCL/CORP/NIT/1201/18-19 | Mannual unloading of BOXN wagons on Track Hopper at Sagardighi Thermal Power Project | 16-11-2018 | 16-11-2018 | Original | |
4756 | BTPS/12263 | WBPDCL/BTPS/NIT/E1466/18-19 | Annual Operation Contract for Cleaning of Pyrites/Reject Coal from the pulverisers & closing/opening of Rod Gates of all Coal Feeders of all three units of BTPS. | 19-11-2018 | Original | ||
4757 | BkTPP/12216 | WBPDCL/BKTPP/NIT/E1254/18-19 | SUPPLY OF COMPLETE ASSEMBLY OF CONVEYING AIR BLOWER & SPARES | 20-11-2018 | Original | ||
4758 | BkTPP/12215 | WBPDCL/BKTPP/NIT/E1253/18-19 | SUPPLY OF CARBON AND SULPHUR DETERMINATOR & BOMB CALORIMETER | 20-11-2018 | Original | ||
4759 | CORP/12207 | WBPDCL/CORP/NIT/E1200/18-19 | Invitation of bids for Renovation and additional seating arrangements for Corporate Communication department at the 5th floor lift lobby of Bidyut Unnayan Bhaban (BUB) of WBPDCL, Corporate Office | 14-11-2018 | Original | ||
4760 | KTPS/12199 | WBPDCL/KTPS/NIT/E1245/18-19 | RLA study of boiler of #1 , KTPS , during O/H in Overhauling in January – 2019. | 10-11-2018 | Original |