Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4921 | SgTPP/12221 | Annual Contract of (a) Engagement of Operation Helpers on round clock (b) Cleaning and Housekeeping of Boiler / Coal Mill / and other adjacent areas (c) Rate Contract for disposal of Mill Reject / Ash / Debris by tractor (d) Rate contract for Boiler cleaning (e) Engagement of extra manpower as when basis to assist emergency situations as per requirement of operation department, 2 x 300 MW SgTPP for a period of Six (06) months | 25-07-2018 | Original | |||
4922 | STPS/12292 | Annual Maintenance Contract for supplying of Unskilled Worker and Skilled Technician for daily assistance in Maintenance of Electrical Equipments & Systems at STPS under IPH (E) Dept. Santaldih. T. P. S. | 01-08-2018 | Original | |||
4923 | STPS/12291 | Installation of insulation floor coating at 415VAC & 220 VDC Switchgear at Unit # 5 & 6, STPS ,The WBPDCL | 31-07-2018 | Original | |||
4924 | BTPS/12233 | Repairing of existing Dustbins to Prevent Nuisance at BTPS Township | 07-08-2018 | Original | |||
4925 | BTPS/12232 | Periodical cleaning of Overhead Water Tank of different Buildings and R.C.C. Elevated Reservoirs at B.T.P.S. Township | 07-08-2018 | Original | |||
4926 | CORP/12183 | Invitation of Bids for Biennial Ceaning of Underground Water Reservoir at Bidyut Unnayan Bhaban of WBPDCL Corporate Office Complex, 3/C, Block- LA, Sector-III, Salt Lake City, Kolkata-700098 for the Period of 2018-19 | 07-08-2018 | Original | |||
4927 | CORP/12182 | Design , Engineering, Supply, Transport, Storage, Insurance, Erection of Utility Services for Hydrogen Generation Plant Package (SGHGNU2) at Sagardighi Thermal Power Extension Project Phase-II Units [2x500 MW] Units 3 & 4 | 06-08-2018 | Original | |||
4928 | BTPS/12231 | Pre-fabricated Plastomeric Water Proofing Membrane Lining Work over the Roof of ECR Building of BTPS | 27-07-2018 | Original | |||
4929 | BTPS/12230 | Annual job contract for System Water Sample Collection, Second Stage Coal Sample Preparation and Other Chemical Laboratory related jobs | 03-08-2018 | Original | |||
4930 | STPS/12290 | Construction of RCC road from Ash Slurry Pump House Unit # 6 to Permanent store of STPS | 25-07-2018 | Original | |||
4931 | STPS/12289 | Extending consultancy services for Installation of Sewage Treatment Plant at Township including repairing of underground Sewer Line & Plant Premises of Santaldih Thermal Power Project, Purulia, West Bengal | 25-07-2018 | Original | |||
4932 | SgTPP/12220 | Procurement Erection and Commissioning of 03 Nos High Mast Towers for Sagardighi Thermal Power Project, WBPDCL | 24-07-2018 | Original | |||
4933 | STPS/12288 | Construction of One Worker's Shed and Cycle Stand adjacent to Chimney Area of U#5 at STPS | 24-07-2018 | Original | |||
4934 | STPS/12287 | Roof treatment works over damaged roofs of 12 (Twelve) Nos. Qtrs. at STPS (T)-Phase-II | 25-07-2018 | Original | |||
4935 | STPS/12286 | Construction of One Car Shed in front of Technical Building at STPS | 24-07-2018 | Original | |||
4936 | CORP/12181 | Invitation of bids for construction of Ash Water Recirculation System & Lagoon with Water Recovery System including Piping, Mechanical, Electrical, Instrumentation System for Sagardighi Thermal Power Project (SGAWRSL), UNITS [(1X 300 MW + 2 X 500MW + 1 X 660MW (Proposed) | 08-08-2018 | Original | |||
4937 | CORP/12180 | Establishment of site offices (Containerized cabins) at Barjore Coal Mines, Birbhum | 27-07-2018 | Original | |||
4938 | SgTPP/12219 | Rate Contract for Loading, Unloading and Transporting/ carriage of materials (within SgTPP, from outside to SgTPP and from SgTPP to outside) | 24-07-2018 | Original | |||
4939 | SgTPP/12218 | Cutting of unwanted Shrubs, Plants, Jungles, Grasses etc. and clearing Compound Premises by removing the same at ‘D’ Type Complex , ‘C’ Type Complex, FH (Flat)-I, Surroundings of Officer’s Recreation Club (including ORC Playground), surrounding of Market Complex, surroundings of Gas Godown and Both side of Type - I Road (Township main gate to market) for Twelve Months at SgTPP Township , WBPDC, Murshidabad | 20-07-2018 | Original | |||
4940 | SgTPP/12217 | Cutting of unwanted Shrubs, Plants, Jungles, Grasses etc and clearing Compound Premises by removing the same at ‘B’ Type Complex (Qtr. No B-1 to B-89), FH (Barrack) Type Complex, surrounding of FH (Flat)-II, Surrounding General Recreation Club, Surrounding Hospital and Both side of Type- I Road (Market Complex to Gate No. 3) for twelve months” at SgTPP Township , WBPDCL, Murshidabad | 20-07-2018 | Original | |||
4941 | BTPS/12229 | Schedule Maintenance of EL -76 Pulverisers & Servicing of coupling & strainer cleaning of auxiliaries at Units 1-2 on AMC basis under B&A (Stage-I), BTPS, WBPDCL | 24-07-2018 | Original | |||
4942 | KTPS/12169 | Manufacturing, Supply, Testing, Delivery & Transport of Planetary Gear Box for SR-1, 2 Slew Drive at CHP, KTPS through CAPEX Budget proposal of F.Y. 2016-017 | 13-08-2018 | Original | |||
4943 | STPS/12285 | Deployment of 75 (Seventy Five) nos. Contractor Workers and 01 (One) no. Supervisor for providing services to various departments at STPS | 19-07-2018 | Original | |||
4944 | STPS/12284 | Cleaning Jungles, Cutting Long Grasses, Bushes, Shrubs, Dry Trees etc. inside all 220/132/33KV Switch yard under EM-OPH, STPS, The WBPDCL | 17-07-2018 | Original | |||
4945 | CORP/12179 | IT Facility Management Service at WBPDCL’s Corporate Office | 31-07-2018 | Original | |||
4946 | CORP/12178 | Manual unloading of BOXN Wagons on Track Hopper at Sagardighi Thermal Power Project | 05-07-2018 | Original | |||
4947 | STPS/12283 | Rate Contract for Laying or Withdrawal or both Laying and Withdrawal of LT & HT Cable under EMIPH, EMOPH & AHP (E/M) Dept, STPS | 17-07-2018 | Original | |||
4948 | BTPS/12228 | Removing sludge from septic tank, soak well etc. at BTPS Township | 19-07-2018 | Original | |||
4949 | BTPS/12227 | Construction of toilet at operation floor of Unit # 1 to Unit # 4 at BTPS | 24-07-2018 | Original | |||
4950 | BTPS/12226 | Repairing and overhauling of Deep Tube Well Pumps (22.5 HP Capacity) at BTPS Plant | 24-07-2018 | Original | |||
4951 | SgTPP/12216 | Different Filter Cartridge for Control Fluid Regeneration Stage 2 for Sagardighi Thermal Power Project, WBPDCL | 19-07-2018 | Original | |||
4952 | SgTPP/12215 | Procurement of LT Fasteners of any make for Stage 1&2 for Sagardighi Thermal Power Project, WBPDCL | 19-07-2018 | Original | |||
4953 | SgTPP/12214 | Procurement of HT Fasteners of LPS/TVS/UNBRAKO/CAPARO make for Stage 1 & 2 for Sagardighi Thermal Power Project, WBPDCL | 19-07-2018 | Original | |||
4954 | SgTPP/12213 | Maintenance contract of Mechanical Maintenance for SgTPP, CHP, Stage-I & II for one year | 11-07-2018 | Original | |||
4955 | BTPS/12225 | Replacement/ Servicing of Coal Pipe Bends, Straight Piece, Y-Splitter, VARB and servicing of CCP Hanger Support during Unit # 5 Overhauling under B&A (5th Unit), BTPS, WBPDC | 20-07-2018 | Original | |||
4956 | BTPS/12224 | Insulation of Boiler area of Unit # 5 during unit overhauling under B&A(5th Unit) BTPS, WBPDCL | 19-07-2018 | Original | |||
4957 | STPS/12282 | Repairing and painting of Talgoria Bridge at Bhojudih, Jharkhand | 12-07-2018 | Original | |||
4958 | SgTPP/12212 | Construction of Chemical Store Building at DM Plant area of SgTPP, Murshidabad | 04-07-2018 | Original | |||
4959 | STPS/12281 | Making Lavatory two (02) nos. at CHP, STPS | 12-07-2018 | Original | |||
4960 | STPS/12280 | ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I dept. of 250 MW unit #5 & 6 of STPS, WBPDCL | 04-07-2018 | Original |