The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4961 | STPS/12279 | Procurement of Seal Wear Ring & Trunnian Bush for Coal Mill XRP-883 of Unit-5 & 6 under BMD Santaldih T.P.S., the WBPDCL | 10-07-2018 | Original | |||
4962 | STPS/12278 | Procurement of Grinding Elements (Grinding Roll & Bull Ring Segment) for Unit # 5 & 6 XRP-883 Coal Mill under B&A, dept., Santaldih T.P.S., the WBPDCL | 04-07-2018 | Original | |||
4963 | STPS/12277 | Procurement of 1000 Ltr. Hydrazine Hydrate, IS: 12086-1987, Purity: 80% as N2H4, H2O and50% as N2H4 under Chemical Dept., Santaldih T.P.S., the WBPDCL | 04-07-2018 | Original | |||
4964 | BTPS/12223 | Procurement of 50MT of Caustic Soda Flakes for chemical Laboratory, BTPS,WBPDCL | 20-07-2018 | Original | |||
4965 | BTPS/12222 | Cleaning of drains, culverts, road flanks etc. at coal yard and other areas at BTPS | 13-07-2018 | Original | |||
4966 | BTPS/12221 | Repairing of Coal Bunkers of Unit No.#5 with MS/SS lining in Slope Portion during Unit#5 overhauling under B&A(5th Unit), BTPS, WBPDCL | 16-07-2018 | Original | |||
4967 | BTPS/12220 | Servicing of different High Pressure Valves during Unit # 5 overhauling under B&A (5th Unit), BTPS, WBPDCL | 09-07-2018 | Original | |||
4968 | BTPS/12219 | Overhauling Job of Wagon Tippler # 2 at CHP, BTPS | 10-07-2018 | Original | |||
4969 | BTPS/12218 | Repair of high drain from ABL Qtr. to bell mouth of Sullage Pump at BTPS | 09-07-2018 | Original | |||
4970 | BTPS/12217 | Widening & Strengthening of Road side (Silo wall side) outside the SILO area at BTPS | 09-07-2018 | Original | |||
4971 | STPS/12276 | Rate Contract of DM Plant, Acid storage tank (HCL & H2SO4), Oil related drum transport, tank & cooler cleaning under T&A Dept., for 02 (two) years , at STPS , WBPDCL | 28-06-2018 | Original | |||
4972 | STPS/12275 | Procurement of 120 MT Alumino Ferric, IS 299:2012 GR- IV under Chemical Dept., Santaldih T.P.S., the WBPDCL | 26-06-2018 | Original | |||
4973 | CORP/12177 | Courier service job from Bidyut Unnayan Bhaban to locally within West Bengal, across inter-state and international locations. | 06-07-2018 | Original | |||
4974 | CORP/12176 | Demarcation of 20.40 Ha within mining lease area of 846.93 Ha of non-forest land of Pachhwara (North) coal mine by R.C.C. boundary pillars | 11-07-2018 | Original | |||
4975 | CORP/12175 | Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Barjore Coal Mine, Birbhum, to supervise the mining activities | 02-07-2018 | Original | |||
4976 | CORP/12174 | Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Tara (East & West) Coal Mine, West Bardhaman, to supervise the mining activities | 02-07-2018 | Original | |||
4977 | CORP/12173 | Hiring of A.C commercial vehicle (Bolero/TATA Sumo, four wheeler) for Barjora North Coal Mine, Bankura, to supervise the mining activities | 02-07-2018 | Original | |||
4978 | BTPS/12216 | Procurement of Air preheater ferrule for Units #5 (1X210 MW), BTPS | 04-07-2018 | Original | |||
4979 | SgTPP/12211 | Cleaning the premises of each ‘D-type’, ‘C-type’ building and FH (Flat)-I including removing of conservancy garbage mixed with rubbish and other filthy materials from dustbin at SgTPP Township | 18-06-2018 | 27-06-2018 | Original | ||
4980 | SgTPP/12210 | Cleaning the premises of each ‘B-type’ building (Qtr. No.- B-1 to B-89), FH(Flat)-II and FH(Barrack)-I to III including removing of conservancy garbage mixed with rubbish and other filthy materials from dustbin at SgTPP Township | 18-06-2018 | 27-06-2018 | Original | ||
4981 | BkTPP/12187 | Annual Maintenance Contract for Electrical Maintenance Work at OPH area of UNIT–1 to UNIT–5 of BkTPP | 02-07-2018 | Original | |||
4982 | SgTPP/12209 | Procurement of different type of telephone cable (5 pair, 10 pair and 50 pair) for Sagardighi Thermal Power Project, WBPDCL | 27-06-2018 | Original | |||
4983 | SgTPP/12208 | Procurement of Automatic micro processor controlled Bomb Calorimeter for stage–II at Sagardighi Thermal Power Project, WBPDCL | 22-06-2018 | Original | |||
4984 | SgTPP/12207 | ‘Annual Operation and Maintenance Contract for Stage I ( 2 x 300MW ) & Stage II ( 2 x 500 MW ) chlorination system SgTPP | 15-06-2018 | Original | |||
4985 | KTPS/12168 | Replacement of old damaged G.C.I sheets by new G.C.I sheets of Boiler penthouse and painting of supporting structure for 03 units of Stage-I at KTPS | 23-06-2018 | Original | |||
4986 | STPS/12274 | Maintenance of Railway track at STPS | 03-07-2018 | Original | |||
4987 | BTPS/12215 | Procurement of Condenser tube on conversion basis with old/scrap tube for (60 MW) Unit for BTPS of WBPDCL | 26-06-2018 | Original | |||
4988 | BTPS/12214 | Annual Maintenance Contract of Desktops, Printers & other IT related peripherals at BTPS | 28-06-2018 | Original | |||
4989 | CORP/12172 | Supply And erection of Boundary Pillars, Carrying out DGPS Survey and preparation of KML file’ for 147.51 Ha in Compensatory afforestation Land Being Provided by Government of Jharkhand in different Districts of Jharkhand | 03-07-2018 | Original | |||
4990 | BTPS/12213 | ARC for Renovation/Maintenance of Electrical wiring & installation work at different type quarters in BTPS Township under OPH (E/M), BTPS, WBPDCL | 22-06-2018 | Original | |||
4991 | SgTPP/12206 | Annual electrical maintenance contract of Stag – II ( 2 x 500 MW) SgTPP for One (01) year | 18-06-2018 | Original | |||
4992 | SgTPP/12205 | Deployment of semiskilled/Unskilled Manpower for round the clock / three shift performance of errand and other semiskilled / unskilled nature of jobs at both IPH & OPH area of SgTPP for all the working days in a month | 25-06-2018 | Original | |||
4993 | KTPS/12167 | Annual Rate Contract for Coal Cleaning at Coal Handling Plant, KTPS | 18-06-2018 | Original | |||
4994 | KTPS/12166 | Supply of Auto Coal Sampler for CHP and supervision in erection , installation & commissioning | 11-06-2018 | 20-06-2018 | Original | ||
4995 | SgTPP/12204 | Supplying, fitting and fixing of block board in wardrobe and shoe rack and curtain rail in door and window of each flat of 07 nos. 'C'- type (C-43 to C-49) buildings at SgTPP Township | 23-06-2018 | Original | |||
4996 | STPS/12273 | Overhauling of Ash handling plant of Unit#6 under AHP(M/M) | 11-06-2018 | Original | |||
4997 | STPS/12272 | Boiler and auxiliary equipment cleaning of Unit #6 before unit overhauling , STPS ,WBPDCL | 13-06-2018 | Original | |||
4998 | STPS/12271 | Overhauling / Repairing of BFP Cartridge (Model: FK 6D 30 )for 250MW Unit under T&A Dept. STPS , WBPDCL | 18-06-2018 | Original | |||
4999 | STPS/12270 | AMC for Various Mechanical Maintenance jobs of Boiler , APH ,Gravimetric Coal Feeder , High Pressure Valves , Oil Burner , Soot Blower of Unit#5 & 6 of capacity 250 MW each , under B&A Dept., STPS , WBPDCL | 13-06-2018 | Original | |||
5000 | BTPS/12212 | Procurement of Refractory cement of bottom ash hopper for Units #5 (1X210 MW), BTPS | 26-06-2018 | Original |