5001 | BTPS/12211 | Annual Maintenance Contract for Mechanical Maintenance of Fly Ash Handling System, Bottom Ash Handling System Dry Fly Ash Silo System of Stage-I at BTPS | 19-06-2018 | Original | |||
5002 | KTPS/12165 | Supply of 80 MT. Anhydrous Ammonia at KTPS | 14-06-2018 | 02-07-2018 | Original | ||
5003 | KTPS/12164 | Supply of 300 Mtr. (D 508 X 12.7) Coal Carrying Pipe Spares for KTPS | 14-06-2018 | 02-07-2018 | Original | ||
5004 | KTPS/12163 | Supply of 1000 MT Hydrochloric Acid | 22-06-2018 | 29-06-2018 | Original | ||
5005 | SgTPP/12203 | Supplying, fitting and fixing of block board in wardrobe and shoe rack and curtain rail in door and window of each flat of 16 Nos. 'B'- type Building at SgTPP Township | 18-06-2018 | Original | |||
5006 | SgTPP/12202 | Supply & delivery of GI Gratings & GI pipes for Sagardighi Thermal Power Project, WBPDCL | 08-06-2018 | Original | |||
5007 | KTPS/12162 | Supply of 1200 MT Sulphuric Acid | 22-06-2018 | Original | |||
5008 | KTPS/12161 | Supply of 120 MT Caustic Soda Flakes | 22-06-2018 | Original | |||
5009 | BTPS/12210 | Servicing of Boiler front & Wind box of Unit No. 2 during its overhauling under B&A Dept., BTPS | 14-06-2018 | Original | |||
5010 | BTPS/12209 | AMC for round the clock Operation & Maintenance of BTPS Township Electric Supply under OPH (E/M) Division, BTPS | 14-06-2018 | Original | |||
5011 | BkTPP/12186 | Protective Anti-Abrasive Coating on Boiler Tubes of Unit-2, BkTPP during overhauling | 20-06-2018 | Original | |||
5012 | BkTPP/12185 | Supply of Ferrule for Air Pre-Heater Tubes | 22-06-2018 | Original | |||
5013 | CORP/12171 | Evacuation of Ash from Ash Pond, Transportation, Disposal in eco-friendly manner at Sagardighi Thermal Power Project (2nd Phase) | 19-06-2018 | Original | |||
5014 | BTPS/12208 | Procurement of Conveyer Belt for CHP Department of BTPS, WBPDCL | 20-06-2018 | Original | |||
5015 | CORP/12170 | Cyber Security Audit and Program Management for implementation of ISMS (ISO27001:2013 Certification | 25-06-2018 | Original | |||
5016 | BTPS/12207 | Procurement of Bearing Pillow Blocks to be used in Stage-II, RG Crushers at CHP, BTPS | 19-06-2018 | Original | |||
5017 | BTPS/12206 | Procurement of Condenser Tubes, Stg-I, BTPS | 15-06-2018 | Original | |||
5018 | BTPS/12205 | Annual Maintenance Contract for various maintenance work at CHP, BTPS | 29-06-2018 | Original | |||
5019 | SgTPP/12201 | Procurement of 1300 MT Sulphuric Acid for Sagardighi Thermal Power Project, WBPDCL | 15-06-2018 | Original | |||
5020 | BkTPP/12184 | Supply of Fire Alarm System Cable | 25-06-2018 | Original | |||
5021 | KTPS/12160 | Cleaning, Sweeping, Swabbing at Unit # IV to VI, CHP area, Auxiliary Building, Administrative Building, DGM (U) Bldg., O&M Store Office, Canteen, Time Office, Work Shop etc. within KTPS | 18-06-2018 | Original | |||
5022 | KTPS/12159 | Cleaning, Sweeping, Swabbing from Unit # I to III & G. S. Building etc within KTPS | 18-06-2018 | Original | |||
5023 | KTPS/12158 | Cutting, Cleaning, Removing of Jungle, Bushes etc., Cleaning of Coal Dust, Sludge etc., at Drains, Wagon Tippler, Track Hopper Line, Marshalling Yard etc. at KTPS | 23-06-2018 | Original | |||
5024 | KTPS/12157 | Cutting, Cleaning, Removing of Jungle, Bushes etc., Cleaning of Coal Dust, Sludge etc., at Drains, Wagon Tippler, Track Hopper Line, Marshalling Yard etc. at KTPS | 23-06-2018 | Original | |||
5025 | STPS/12269 | Taking delivery of Dry Fly Ash from the silos of Santaldih Thermal Power Station | 05-06-2018 | Original | |||
5026 | SgTPP/12200 | Annual Electrical Maintenance Contract for ESP, FOPH and Chimney , of Stag - I ( 2x300 MW) and Stg. - II ( 2x500 MW) SgTPP for two (02) years | 09-06-2018 | Original | |||
5027 | SgTPP/12199 | Procurement, Installation & Commissioning of 02 Nos CAAQMS (Continuous Ambient Air Quality Monitoring Station) for Sagardighi Thermal Power Project, WBPDCL | 01-06-2018 | Original | |||
5028 | SgTPP/12198 | Procurement of Different Spares of Air Pre Heater (Model No: LAP-10320/3883) for Sagardighi Thermal Power Project, WBPDCL | 01-06-2018 | Original | |||
5029 | CORP/12169 | Evacuation of Ash from Ash Pond No-2, Transportation, Disposal in Eco-friendly manner at Bandel Thermal Power Station | 06-06-2018 | Original | |||
5030 | BkTPP/12183 | Annual Maintenance Contract of Mechanical and Electrical System of CHP for 5x210 MW Units of BkTPP | 11-06-2018 | Original | |||
5031 | BTPS/12204 | Procurement of 16 nos. gratings for crusher at Stage-1 CHP, BTPS, WBPDCL | 05-06-2018 | Original | |||
5032 | BTPS/12203 | AMC for servicing & maintenance of window ACs, split ACs & ductable ACs located at different places in Plant & Township area under IPH-II (E/M) Division, BTPS | 01-06-2018 | Original | |||
5033 | SgTPP/12197 | Painting of Conveyor 5A/B and 6A/B superstructures of Phase -1, SgTPP, WBPDCL | 22-05-2018 | Original | |||
5034 | STPS/12268 | Supply of different categories of unskilled workers related with the work annual maintenance of conservancy work with in STPS, Township | 24-05-2018 | Original | |||
5035 | STPS/12267 | Replacement with repairing & maintenance of rolling shutters inside Plant Premises of STPS | 24-05-2018 | Original | |||
5036 | STPS/12266 | Jungle cutting, removal of rubbish and providing chain link fencing at silt trap and at stair at Old Intake pump house, Bhojudih at STPS | 24-05-2018 | Original | |||
5037 | STPS/12265 | Repairing and painting of RCC over head Water Tank No. 1 and other ancillary works at STPS (T) | 24-05-2018 | Original | |||
5038 | BkTPP/12182 | Overhauling of Boiler Pressure Parts, HP Valves, Safety Valves & Soot Blower part of 210MW boiler of Unit # 2 BkTPP | 26-05-2018 | Original | |||
5039 | STPS/12264 | Cleaning of drains before and during monsoon period at STPS Plant area [2018] | 24-05-2018 | Original | |||
5040 | STPS/12263 | Tit Bit repairing and painting of inside rooms and corridors at Administrative Building of STPS | 24-05-2018 | Original |