5041 | BkTPP/12181 | Supply of Boiler Tubes | 28-05-2018 | Original | |||
5042 | CORP/12168 | Disposal of Fly Ash from Silos through Railway Wagons by Installing Bagging Plants and Necessary Infrastructureat Sagardighi Thermal Power Station | 11-06-2018 | Original | |||
5043 | BkTPP/12180 | Annual contract for Sprinkling of Water over CHP Roads and other roads inside Plant Premises at BkTPP for one year | 31-05-2018 | Original | |||
5044 | BTPS/12202 | Overhauling job of Boiler & its Pressure Parts & high pressure jet cleaning of Unit No.2 under B&A Dept., BTPS | 25-05-2018 | Original | |||
5045 | SgTPP/12196 | Cleaning the premises of SgTPP School Building, VIP Guest House, Market Complex, SgTPP Hospital, GRC, ORC and maintaining lawns by cleaning, cutting and removing grass, unwanted plants, bushes etc surroundings of SgTPP School Building, surroundings of School Playground and surroundings of VIP Guest House at SgTPP Township , WBPDCL. Murshidabad | 28-05-2018 | Original | |||
5046 | BTPS/12201 | Insulation work on different pipe lines, air flue gas duct, boiler casing and repairing of boiler casing pent house roof, air flue gas duct of Unit No.2 during overhauling under B&A Dept., BTPS | 25-05-2018 | Original | |||
5047 | BTPS/12200 | Horticultural activities with maintenance at various locations of BTPS Township | 24-05-2018 | Original | |||
5048 | STPS/12262 | Procurement of Solid Oil Seal (MOC: VITON) for Roller Journal Assy of Bowl Mill XRP-883 under BMD, Santaldih T.P.S., the WBPDCL | 16-05-2018 | Original | |||
5049 | STPS/12261 | Procurement of One no. of ELC machine of capacity 10-12 LPM for Lube oil filtration of Coal Mills & PA/FD Fans in Unit# 5&6 under BMD, Santaldih T.P.S., the WBPDCL | 16-05-2018 | Original | |||
5050 | SgTPP/12195 | Procurement of Street light LED lamps and lighting tower LED lamps for Sagardighi Thermal Power Project, WBPDCL | 15-05-2018 | Original | |||
5051 | BkTPP/12179 | Supply of Decksheets, Checker Plates, Channels and Angles | 22-05-2018 | Original | |||
5052 | BkTPP/12178 | Supply of Trailing Cable | 21-05-2018 | Original | |||
5053 | BTPS/12199 | Replacement of 2A & 2B ID Fan Runner and Servicing of Bearing of 2A & 2B ID fan of unit #2 during its upcoming Overhauling at BTPS | 23-05-2018 | Original | |||
5054 | BTPS/12198 | Emergency restoration of embankment of the river Hooghly with extension & laying of RCC concrete pipes in between jetty & Police Chowki at BTPS | 23-05-2018 | Original | |||
5055 | BTPS/12197 | Annual Contract for Engagement of Dozer Operator at CHP of BTPS, WBPDCL | 25-05-2018 | Original | |||
5056 | BTPS/12196 | Repairing and Insulation of ID fan suction duct, ID fan discharge duct of unit #2 during its upcoming Overhauling at BTPS | 23-05-2018 | Original | |||
5057 | BTPS/12195 | Overhauling / servicing of high pressure valves and control valves of Boiler of unit no.-2, during its upcoming overhauling | 26-05-2018 | Original | |||
5058 | CORP/12167 | Tender in two step bid system are invited from reputed and resourceful agencies in West Bengal for awarding to & fro Courier Service job from the Bidyut Unnayan Bhaban, Corporate Office WBPDCL to Kolaghat Thermal Power Station(KT.P.S.). | 07-06-2018 | Original | |||
5059 | CORP/12166 | Evacuation OF ASH from ASH POND No-1, Transportation, Disposal in eco-friendly manner at Bakreswar Thermal Power Station (17 TH PHASE) | 23-05-2018 | Original | |||
5060 | SgTPP/12194 | Annual Maintenance Contract of Central Air Conditioning System (Supplied by M/S Dong Fang Electric Corporation, China) of CCR-1 & 2, GCR, Technical Building & Administrative Building (Including Supply of Spares and Refrigerant & Visit of Expert) at SgTPP (2X300 MW) | 05-05-2018 | Original | |||
5061 | SgTPP/12193 | Metal Coating at burner panel and other required area in boiler during overhauling of Unit # 2 & 3 SgTPP , WBPDCL | 09-05-2018 | Original | |||
5062 | CORP/12165 | Construction of (G+6) storeyed 2nd Technical Building at Sagardighi Thermal Power Project of WBPDCL, Murshidabad | 30-05-2018 | Original | |||
5063 | BTPS/12194 | Procurement of Complete loading unit assembly for 8.5 E9 Coal Mill for Units # 5 (1X210 MW), BTPS | 26-05-2018 | Original | |||
5064 | STPS/12260 | Overhauling of CW pumps of Unit # 6 under T&A Dept., STPS , WBPDCL | 12-05-2018 | Original | |||
5065 | STPS/12259 | Annual rate contract for servicing and upkeepment of STPS Guest House | 17-05-2018 | Original | |||
5066 | BTPS/12193 | Annual Contract for Picking of Stone & Foreign material from running Conveyors at Coal Handling Plant at BTPS | 16-05-2018 | Original | |||
5067 | SgTPP/12192 | Procurement of Different items for Overhauling of Unit # 2 for Sagardighi Thermal Power Project, WBPDCL | 14-05-2018 | Original | |||
5068 | STPS/12258 | Supply and delivery of Laptop (Model - 3567), Color Blue, with carrying case for ITC Department, Santaldih T.P.S., the WBPDCL | 14-05-2018 | Original | |||
5069 | STPS/12257 | Cleaning jungles, cutting long grasses, bushes, shrubs, dry trees etc. from different areas inside and outside of plant premises of STPS [2018] | 22-05-2018 | Original | |||
5070 | BkTPP/12177 | Annual Contract for Ash Disposal from Boilers and ESPs of unit I to V, ash slurry pump house and such other areas and disposal at specified location within plant boundary at BKTPP | 15-05-2018 | Original | |||
5071 | SgTPP/12191 | Rate contract for Unloading of coal from BOBR/N-BOX. Rakes to T/H –I&II and WT respectively at CHP, Phase -I&II for one year | 26-05-2018 | Original | |||
5072 | CORP/12164 | Design , Engineering, Supply, Transport, Storage , Insurance, Erection of Utility Services for Hydrogen Generation Plant Package (SGHGNU2) at Sagardighi Thermal Power Extension Project Phase-II Units [2x500 MW] Units 3 & 4 | 21-05-2018 | Original | |||
5073 | SgTPP/12190 | Miscellaneous repairing, area grading and concreting works near Phase-1 Power House area at SgTPP | 12-05-2018 | Original | |||
5074 | SgTPP/12189 | Over hauling work for Unit # 2 Boiler of Boiler parts, HP & Safety Valves, Soot Blowers for Boiler Efficiency improvement, steaming license renewal at SGTPP, WBPDCL. Murshidabad | 09-05-2018 | Original | |||
5075 | SgTPP/12188 | Annual Maintenance Contract for Central Air Conditioning System of Phase - 2, SgTPP under EMIPH - 2 Dept. | 11-05-2018 | Original | |||
5076 | SgTPP/12187 | Over hauling work for maintenance of Duct, Damper, Expansion Bellows, Gates & Actuators of Unit # 2 at SGTPP, WBPDCL. Murshidabad | 09-05-2018 | Original | |||
5077 | STPS/12256 | Procurement of different size LP Gate Valves and Dual Plate Check Valve under T&A Dept., Santaldih T.P.S., the WBPDCL | 07-05-2018 | Original | |||
5078 | STPS/12255 | Rotation & Replacement of fly ash conveying line (250NB/300NB) from Nuva Feeder to Silo top of Unit # 6 OH under AHP (M/M) Dept, STPS | 15-05-2018 | Original | |||
5079 | STPS/12254 | Rotation & Replacement of Ash Disposal Line (300NB) from Pump Discharge to Hanuman Mandir of Unit # 6 OH under AHP (M/M) Dept., STPS | 15-05-2018 | Original | |||
5080 | STPS/12253 | Replacement of LP Line (200NB / 250NB) & Rotation/Replacement of BA/Silo Slurry line (200NB) of Unit # 6 OH under AHP (M/M) Dept., STPS | 15-05-2018 | Original |