Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
5601 | BkTPP/11969 | Annual Contract for Drain Cleaning, as and when required basis, at CHP Area & other Inside Plant Premises, BkTPS | 18-07-2017 | Original | |||
5602 | STPS/11968 | Deployment of 54 (Fifty Four) Nos. Unskilled Workers and 01(One) No. Supervisor for providing services to various departments at STPS as per discretion of STPS Authority | 07-07-2017 | Original | |||
5603 | SgTPP/11967 | Civil Maintenance Work (Building, Sanitary and Plumbing) Contract for different types of Building of SgTPP Township including Water Pipe Maintenance (from DM Plant Valve Point to SgTPP Township Area) Work and minor Civil Construction Works | Original | ||||
5604 | SgTPP/11966 | Strengthening of Conveyor Galleries and TP4 Structure of Phase #1, SgTPP, WBPDCL | 23-06-2017 | Original | |||
5605 | KTPS/11965 | Annual Rate Contract for Hiring of Six (06) Nos. of 50 Seater Standard Buses with Registration not before the year 2013 and having Carriage Contract Type Registration, for Transportation of Employees of Kolaghat Thermal Power Station, WBPDCL from Tow | 07-07-2017 | Original | |||
5606 | BTPS/11964 | Supply, Installation, Commissioning & 4 years extended Warranty and Maintenance Contract of Analyzers for Online Measurement of Water Quality Parameters pH, BOD, COD, TSS & Temperature from the discharge of ETP of BTPS (4x60+215 MW) | 11-07-2017 | Original | |||
5607 | BTPS/11963 | Supply of One No. Boat with Two Boatmen and different types of Civil Job at Intake and Inside Plant at BTPS | 18-07-2017 | Original | |||
5608 | BkTPP/11962 | Repairing and Painting Work for C-Type Building (C-11 to C-22), at BkTPP Township Repairing and Painting Work for B-Type Building (B-81 to B-85 & B-79), at BkTPP Township | 14-07-2017 | Original | |||
5609 | BkTPP/11961 | Repairing and Painting Work for B-Type Building (B-1 to B-7), at BkTPP Township | 14-07-2017 | Original | |||
5610 | BkTPP/11960 | Supply of Coal Mill Grinding Elements | 17-07-2017 | Original | |||
5611 | KTPS/11959 | Annual Rate Contract for Providing Services of 48 Nos. Contractual Workers to various departments including (O&M) department at KTPS | 03-07-2017 | Original | |||
5612 | BTPS/11958 | Sweeping and Cleaning of the Power House Building of I-IV Unit and other Office Building at BTPS Plant Site | 30-06-2017 | Original | |||
5613 | BTPS/11957 | Supply Stone Dust at different points of Railway Marshalling Yard at BTPS | 30-06-2017 | Original | |||
5614 | BkTPP/11956 | Supply of Power Cables | 30-06-2017 | Original | |||
5615 | BkTPP/11955 | Annual Contract for Preparation and Maintenance of Lawn, Hedge Line, S.F. Bed and Plantation at H.M.E.P. School, BkTPP Prabir Sengupta Vidyalaya, Tilpara Intake, Abdarpur Guest House, Transit Guest House, In Front of Adm. Bldg., Medical Unit, | 30-06-2017 | Original | |||
5616 | BkTPP/11954 | Fixing of 600 MM Dia. Concertina Wire and Raising of Boundary Wall Height from CT#4 to Construction Gate at BkTPP. | 30-06-2017 | Original | |||
5617 | BTPS/11953 | Cleaning of Drains and Culverts at Coal Yard and Road Flanks etc. and other areas at BTPS | 28-06-2017 | Original | |||
5618 | STPS/11952 | Annual Rate Contract for Metallizing of DE & NDE Motor Bearing Housing, Trueness Checking & Dynamic Balancing of Rotor, Metallizing & Machining of Rotor Shaft (Bearing Journal Portion) under IPH (E/M), OPH (E/M), AHP (E/M) & CHP (E/M) Dept. STPS | 19-06-2017 | Original | |||
5619 | STPS/11951 | Annual Rate Contract for Thermal Insulation, Refractory Works of different Ducts, Valves & Pipe Lines and Cleaning of Buck Stay and PA Ducts of T&A and B&A Area of STPS, WBPDCL | 21-06-2017 | Original | |||
5620 | STPS/11950 | Repairing Work for Concrete Structures of Two Cells in between Drift Eliminator and RCC Louver at Unit # 5 IDCT at STPS | 20-06-2017 | Original | |||
5621 | BTPS/11949 | Concrete flooring of the area within LDO Tanks boundary at BTPS | 28-06-2017 | Original | |||
5622 | BTPS/11948 | Scaffolding Erection & Dismantling, High Pressure Jet Cleaning, Thickness Measurement and Repairing of Boiler Pressure Parts of Unit No. 4 for renewal of Boiler Steaming Certificate at BTPS of WBPDCL | 27-06-2017 | Original | |||
5623 | BkTPP/11947 | Purchase Contract of Hydrogen Gas Refilling | 03-07-2017 | Original | |||
5624 | BkTPP/11946 | Overhauling of Boiler Air & Flue Gas Ducts and Expansion Bellows of 210 MW Boiler of Unit # 4 BkTPP | 19-06-2017 | Original | |||
5625 | BkTPP/11945 | Annual Contract for Supply of Round the Clock/Three Shift performance of Errand and other unskilled nature of jobs at both IPH & OPH areas of BkTPP | 30-06-2017 | Original | |||
5626 | BTPS/11944 | Scaffolding Erection & Dismantling, High Pressure Jet cleaning, thickness measurement and repairing of Boiler Pressure Parts of Unit No. 2 for renewal of Boiler Steaming Certificate at BTPS of WBPDCL | 24-06-2017 | Original | |||
5627 | BTPS/11943 | Supply, Installation & Commissioning of two (02) Nos. Hot Extraction type SOx and NOx Analyzers for On Line Measurement at Stack Inlet of any two Units of Stage-I at BTPS | 20-06-2017 | Original | |||
5628 | BkTPP/11942 | Supply of Coal Mill Grinding Elements | 19-06-2017 | Original | |||
5629 | BkTPP/11941 | Overhauling of Boiler, Air & Flue Gas Ducts and Expansion Bellows of 210 MW Boiler of Unit# 1 BkTPP | 27-06-2017 | Original | |||
5630 | BkTPP/11940 | Overhauling of Boiler Pressure Parts, HP Valves, Safety Valves & Soot Blower Part of 210 MW Boiler of Unit-1, BkTPP | 27-06-2017 | Original | |||
5631 | STPS/11939 | Cleaning, Sweeping, Washing and Swabbing etc. of different Floor, Roof, Pavement Area etc. of different Building, like Power House, Mill Area, ESP Area, Vacuum Pump House, Booster Pump House, CTP House, Feeder Area, Bunker Roof Area, Boiler Area, | 12-06-2017 | Original | |||
5632 | STPS/11938 | Protection of Embankment of Dutta Bandh near Culvert of Officers’ Club upto Old Pump House beside Ring Road approaching towards Gate No. 3 within STPS (T) | 10-06-2017 | Original | |||
5633 | STPS/11937 | Operation and Maintenance of Industrial Relation Management System, Material Tracking System and Issuance of Visitor Photo Gate Pass and Vehicle Pass at Santaldih Thermal Power Station | 09-06-2017 | Original | |||
5634 | STPS/11936 | Annual Maintenance Contract for various Heavy Vehicles, Equipments etc. under Workshop Department, STPS, Santaldih, WBPDCL | 07-06-2017 | Original | |||
5635 | BkTPP/11935 | Overhauling of Coal Burner, Wind Box, SADC, Recuperative Air Pre Heater & Burner Tilt of 210 MW Boiler of Unit-1 BkTPP | 23-06-2017 | Original | |||
5636 | BkTPP/11934 | Overhauling of Coal Burner, Wind Box, SADC, regenerative Air Pre Heater & Burner Tilt of 210 MW Boiler of Unit-5 BkTPP | 12-06-2017 | Original | |||
5637 | BkTPP/11933 | Overhauling of Coal Burner, Wind Box, SADC, Regenerative Air Pre Heater & Burner Tilt of 210 MW Boiler of Unit-4 BkTPP | 06-06-2017 | Original | |||
5638 | BTPS/11932 | Operation of Ash handling plant & operation of Electro Static Precipitator on round the clock basis of unit No. 5 on Annual Operation Contract (AOC) basis for Units (1x210MW) of BTPS | 09-06-2017 | Original | |||
5639 | BTPS/11931 | ARC for guarding arrangement of WBPDCL installation at BTPS Township and BTPS Guest House in 3 shifts and Two-Wheeler Stand adjacent to the Administrative Building, BTPS, WBPDCL | 09-06-2017 | Original | |||
5640 | KTPS/11930 | Rate contract for the job of Various day to day Departmental Job related to PCI from U#1 to U#6 including OPH area & short shut down under PCI,KTPS | 07-06-2017 | Original |