The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
5641 | KTPS/11930 | Rate contract for the job of Various day to day Departmental Job related to PCI from U#1 to U#6 including OPH area & short shut down under PCI,KTPS | 07-06-2017 | Original | |||
5642 | STPS/11929 | Rate Contract for 02 years for the Job of Collection & Preparation of Coal & Ash samples from different sources inside the plant under O&E and Fuel Management Department | 06-06-2017 | Original | |||
5643 | STPS/11928 | Construction of New Chlorinator Building adjacent to New Filter Water PH of STPS | 05-06-2017 | Original | |||
5644 | CORP/11927 | Evacuation of ASH from ASH POND No.-1, Transportation, Disposal in eco-friendly manner at Bakreswar Thermal Power Station.( 15th Phase ) | 14-06-2017 | Original | |||
5645 | CORP/11926 | Invitation for Competitive Bids for New Drinking Water System at Santaldih Thermal Power Station Township | 20-06-2017 | Original | |||
5646 | KTPS/11925 | Cleaning, sweeping and swabbing of all residential / non-residential building / complex at KTPS Township | 03-06-2017 | Original | |||
5647 | STPS/11924 | Roof treatment works over damaged roofs of 47(forty seven) nos. qtrs. at STPS(T) | 02-06-2017 | Original | |||
5648 | BkTPP/11923 | Supply of Pipes | 05-06-2017 | Original | |||
5649 | BkTPP/11922 | Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 4 of BkTPP | 08-06-2017 | Original | |||
5650 | BTPS/11921 | Twelve (12) Months Rate Contract for the Job of Manual Breaking of Coal Lumps on Hopper Gratings at Coal Handling Plant, BTPS | 06-06-2017 | Original | |||
5651 | BTPS/11920 | Annual Service Contract for Cleaning, Removal of Coal Dust from CHP Areas for 1 to 5 Units at BTPS, including Manpower supply | 13-06-2017 | Original | |||
5652 | STPS/11919 | Transportation of conservancy materials, rubbish, plastic bags from STPS (T) | 30-05-2017 | Original | |||
5653 | KTPS/11918 | Annual Maintenance Contract for fire protection system at KTPS . | 31-05-2017 | Original | |||
5654 | KTPS/11917 | Roof treatment of affected buildings in township area for the year 2016-17 at KTPS township | 03-06-2017 | Original | |||
5655 | CORP/11916 | Study and Solutions for Installation of Flue-Gas Desulphurisation Plant at Sagardighi Thermal Power Station, WBPDCL | 14-06-2017 | Original | |||
5656 | CORP/11915 | Design , Engineering , Supply, Transport, Storage , Insurance, Erection of Utility Services for Hydrogen Generation Plant Package (SGHGNU2) at Sagardighi Thermal Power Extension Project Phase-II Units [2x500 MW] Units 3 & 4 | 14-06-2017 | Original | |||
5657 | STPS/11914 | Evacuation of settled ash from the Ash Pond-1/Ash Pond-2 and disposing the same in abandoned ash pond for land development in STPS Construction of Longitudinal drain in between the toe of Ash pond-1 & proposed development area over the abandoned area | 26-05-2017 | Original | |||
5658 | SgTPP/11913 | Supply, Installation & Commissioning of Analyzer for Online Measurement of Water Quality parameters pH, BOD, COD, TSS, Flow & Temperature from the discharge of guard pond of SgTPP | 26-05-2017 | Original | |||
5659 | BTPS/11912 | Procurement of primary superheater, secondary superheater, saturate screen superheater, & Economiser bends for Stage-I Units (4x60MW) of BTPS,WBPDCL | 31-05-2017 | Original | |||
5660 | BTPS/11911 | Procurement of Ring and Ball sets for EL- 76 Pulverizer for Stage- I Units (4X60 MW), BTPS Operation of Bottom Ash handling system, Wet and Dry Fly Ash handling system, Electro Static Precipitator(1-4) units along with Operation of station Silo for Dry Fly Ash Handling System (1-5) units on annual operation contract basis at BTPS | 30-05-2017 | Original | |||
5661 | CORP/11910 | Evacuation OF ASH from ASH POND-1/ASH POND-2, Transportation, Disposal in eco-friendly manner at Santaldih Thermal Power Station (6th phase) | 06-06-2017 | Original | |||
5662 | CORP/11909 | Non-comprehensive annual maintenance contract of HT & LT Electrical system installed at Bidyut Unnanyan Bhaban, WBPDCL | 29-05-2017 | Original | |||
5663 | BTPS/11908 | Supply and Commissioning of two numbers of Opacity Monitors for any two units of stage-I at BTPS | 24-05-2017 | Original | |||
5664 | SgTPP/11907 | Procurement of 02 nos. of 500 kVA ,11/.433 KV Cu wound distribution Transformer for Sagardighi Thermal Power Project, WBPDCL | 22-05-2017 | Original | |||
5665 | KTPS/11906 | Construction with maintenance of fencing and installation of gates alongwith raising the earthen dyke all in connection with safety compliance at fuel oil storage tank area of STPS | 19-05-2017 | Original | |||
5666 | KTPS/11905 | Removal of coal boulders from track hopper, wagon tippler & CHP road side area at KTPS | 27-05-2017 | Original | |||
5667 | BkTPP/11904 | Annual Contract for Operation of AC System & Air Washer Including Simulator & Auditorium of BkTPP | 05-06-2017 | Original | |||
5668 | BkTPP/11903 | Overhauling of Boiler Air & Flue Gas Ducts and Expansion Bellows of 210 MW Boiler of Unit # 5 BkTPP | 26-05-2017 | Original | |||
5669 | BkTPP/11902 | Overhauling of Boiler Air & Flue Gas Ducts and Expansion Bellows of 210 MW Boiler of Unit # 4 BkTPP | 26-05-2017 | Original | |||
5670 | BkTPP/11901 | Overhauling of Boiler Pressure Parts, HP Valves & Soot Blower Part of 210MW Boiler of Unit-5 BkTPP | 26-05-2017 | Original | |||
5671 | BkTPP/11900 | Overhauling of Boiler Pressure Parts, HP Valves & Soot Blower Part of 210 MW Boiler of Unit-4 BkTPP | 26-05-2017 | Original | |||
5672 | STPS/11899 | Procurement of Spares of FAE Tower of Unit # 5, AHP under AHP(M/M), dept., Santaldih T.P.S., the WBPDCL | 12-05-2017 | Original | |||
5673 | SgTPP/11898 | Hiring one (01) no. of Non-AC, Diesel Bus (Preferably Tata, company made & manufacture 2014 onwards model) 50 seated for plying at SgTPP for two years. | 30-05-2017 | Original | |||
5674 | KTPS/11897 | (JOB-I):Fabrication & Supply of Water cum Foam combined Fire Tender on TATA LPT 1613 Chasis; (JOB-II):Supply of 1500 MT HYDROCHLORIC ACID at KTPS | 06-06-2017 | Original | |||
5675 | SgTPP/11896 | Annual Maintenance Contract foe Electrical Maintenance of 2x300MW DEC make unit under EM-IPH department Stage-I | 15-05-2017 | Original | |||
5676 | STPS/11895 | Condenser water box cleaning, painting and hot well cleaning of unit # 5 during forthcoming overhauling | 18-05-2017 | Original | |||
5677 | STPS/11894 | Procurement of Upper & Lower Journal Bearing for Unit-5&6 XRP-883 Coal Mill under B&A, dept., Santaldih T.P.S., the WBPDCL | 12-05-2017 | Original | |||
5678 | BTPS/11893 | Annual Rate Contract for Twenty (20) nos. of regular supply labours for administrative & other jobs at BTPS, WBPDCL | 23-05-2017 | Original | |||
5679 | CORP/11892 | Construction of Dry Ash Evacuation Route (Concrete Pavement) from Ash Silo to SMGR Road at SgTPP, Murshidabad | 26-05-2017 | Original | |||
5680 | SgTPP/11891 | Procurement of GI Plain Sheet for Sagardighi Thermal Power Project, WBPDCL | 03-05-2017 | Original |