5801 | BkTPP/11770 | Road repairing work over top road of Right Earthen dam, BKTPS (Part-II) | 28-02-2017 | 15-03-2017 | Original | ||
5802 | BTPS/11769 | Hiring of 2(Two) nos. of Non AC TATA Star Bus (one no. 32 seated with model-712 and another one no. 40 seated with Model-912) (make 2016 & onwards) with Company make body and Euro 4Engine on rate contract basis for one (01) year (New Buses complying with latest emission norms of Euro/Bharat stage-IV) on BTPS duty at BTPS, WBPDCL | 02-03-2017 | Original | |||
5803 | BkTPP/11768 | Purchase Contract of Chemicals for cooling water treatment of UNIT#1 to #5 | 10-03-2017 | Original | |||
5804 | KTPS/11767 | Supply of 1300 MT Sulphuric Acid at KTPS; (JOB-II): Supply of 150 MT Anhydrous Ammonia at KTPS | 22-02-2017 | 03-03-2017 | Original | ||
5805 | BkTPP/11766 | Annual Maintenance Contract for Chlorination System of Unit#1, 2, 3, 4, & 5 (5 x 210MW) of Bakreswar Thermal Power Project | 28-02-2017 | Original | |||
5806 | BTPS/11765 | All Electrical and C&I related maintenance of ESP & AHP (1-4) units along with Silo station of (1-5) units on Annual maintenance contract basis for BTPS, WBPDCL | 25-02-2017 | Original | |||
5807 | SgTPP/11764 | Procurement of 200 MT Liquid Chlorine (IS : 646-1986) having purity of 99.5% for Sagardighi Thermal Power Project, WBPDCL. Procurement of 1000 MT Hydrochloric Acid (IS:265/1993) for Sagardighi Thermal Power Project, WBPDCL. | 18-02-2017 | Original | |||
5808 | STPS/11763 | Annual repair & maintenance of 600mm Dia. Raw Water Pipe Line from Old Intake Pump House (Jharkhand Side) to Raw water at STPS (Bengal Side) Annual Maintenance of gardening & plantation and other ancillary works within STPS (T) | 17-02-2017 | Original | |||
5809 | SgTPP/11762 | Wear Particle Analysis, NAS Value, TAN Value, moisture content and viscosity Analysis of oil at SgTPP | 20-02-2017 | Original | |||
5810 | STPS/11761 | Annual Maintenance Contract for 02 years for maintaining all hardware and software of computers & its accessories along with peripherals, LAN, CCTV Cameras, Servers etc. including supply of the maintenance spares under IT department, STPS, WBPDCL | 14-02-2017 | Original | |||
5811 | BkTPP/11760 | Annual rate Contract for carrying out jobs related to loading, unloading and transportation of materials for the purpose of BKTPP | 20-02-2017 | 06-03-2017 | Original | ||
5812 | BTPS/11759 | Hiring of two Non-AC bus (32 seated Tata Star Bus (model-712)) on rate contract basis with company make body and Euro IV engine (New Buses complying with latest emission norms of Euro/Bharat stage-IV) on BTPS duty | 15-02-2017 | Original | |||
5813 | STPS/11758 | Procurement of MS Plate & Chequered Plate, MS Angle, ERW Pipe, MS Rod, Ms channel and Aluminium sheet for Unit # 5 Overhauling expected to be held in July-2017 & regular maint. of Boiler under BMD, Santaldih T.P.S., the WBPDCL | 09-02-2017 | Original | |||
5814 | STPS/11757 | Procurement of Grinding Elements (Grinding Roll & Bull Ring Segment) for Unit # 5 & 6 XRP-883 Coal Mill under B&A ,dept., Santaldih T.P.S., the WBPDCL | 16-02-2017 | Original | |||
5815 | CORP/11756 | Supervision of coal dispatched from the coalfields of Mahanadi Coalfields Limited (MCL) for the Power Stations of The West Bengal Power Development Corporation Limited | 21-02-2017 | Original | |||
5816 | STPS/11755 | Supply and delivery of different types of Networking Item & IT Consumables for 2X 250 MW Unit 5 & Unit 6 for IT Depts., Santaldih T.P.S., the WBPDCL | 27-01-2017 | Original | |||
5817 | KTPS/11754 | Annual Rate Contract for deployment of five (05) nos. of luxury bus (model 2009 or onward) for rendering transportation service for the employees of KTPS,WBPDCL | 06-02-2017 | Original | |||
5818 | CORP/11753 | Engineering Consultancy services including Design, Engineering & preparation of all Technical specification and Commissioning & Performance Guarantee, etc. for Up gradation and Renovation of Electro static Precipitators and associated system of Unit | 28-02-2017 | Original | |||
5819 | STPS/11752 | Hiring of One no. of Mahindra & Mahindra make Bolero 6+1 seated of 2014 model or onward to perform Police station duty under Workshop, STPS for the period of 02(two) years | 04-02-2017 | Original | |||
5820 | STPS/11751 | Annual Maintenance Contract for Mechanical Maintenance work of New Intake Pump House at Viringi | 10-02-2017 | Original | |||
5821 | STPS/11750 | Annual Rate Contract for Removal of coal /Coal dust from Crusher house, TPs, Take up Pits, Beneath the conveyor gallery etc and disposal the same at Coal Yards for one year under CHP (O), STPS, WBPDCL | 06-02-2017 | Original | |||
5822 | SgTPP/11749 | Procurement, Installation and Commissioning of 108 nos. of 220V,1500AH PLANTE type Lead Acid Battery Bank and 220V, 500A Dual Automatic Float cum Boost Charger for Unit#1 of Sagardighi Thermal Power Project, WBPDCL | 03-02-2017 | Original | |||
5823 | KTPS/11748 | Annual Operation contract for running of Effluent Treatment Plant at KTPS. | 01-02-2017 | Original | |||
5824 | STPS/11747 | Procurement of 350 NB MS Pipe for Fly Ash Conveying lines for forthcoming O/H of UNIT # 5 under AHP(M/M),dept., Santaldih T.P.S., the WBPDCL | 02-02-2017 | Original | |||
5825 | STPS/11746 | Overhauling of HP & LP valves of T&A area of Unit # 5 under M/M (T&A) Dept. STPS, WBPDCL | 31-01-2017 | Original | |||
5826 | CORP/11745 | Annual Operation & Maintenance Contract of Fire Hydrant System, Sprinkler system and Portable Fire extinguishers for one year (2017-18) at WBPDCL, Corporate Office, Kolkata-98. | 20-02-2017 | Original | |||
5827 | STPS/11744 | Material for Permanent OFC Network Installation from Weigh Bridge to CHP Technical building of STPS for IT Depts., Santaldih T.P.S., the WBPDCL | 31-01-2017 | Original | |||
5828 | BTPS/11743 | Repair, maintenance and painting of RCC overhead reservoir with replacement of spiral staircase at BTPS Plant site Repair and Maintenance of Road from Assam Road link to PAPL Gate No. 2 of BTPS, Phase-1 | 08-02-2017 | Original | |||
5829 | SgTPP/11742 | Procurement of Grinding Elements for Coal Mill ZGM-123N for Sagardighi Thermal Power Project, WB | 31-01-2017 | Original | |||
5830 | KTPS/11741 | Annual Rate Contract for Engagement of A.C Ambulance on monthly hiring basis for daily 24 hrs duty for the service of KTPS employees & their relatives | 24-01-2017 | Original | |||
5831 | STPS/11740 | Procurement of Spares for Bowl Mill XRP-883 for regular & overhauling maint. of Mill under BMD, Santaldih T.P.S., the WBPDCL | 27-01-2017 | Original | |||
5832 | STPS/11739 | Overhauling job of AHP of Unit # 5 under AHP (M/M) Dept. STPS, WBPDCL | 25-01-2017 | Original | |||
5833 | STPS/11738 | Annual Contract for deploying manpower for assisting in different job at Fire & Safety Dept, STPS | 24-01-2017 | Original | |||
5834 | BkTPP/11737 | Procurement & Commissioning of 500MW Simulator System at BkTPP Simulator Institute | 27-01-2017 | Original | |||
5835 | KTPS/11736 | AMC for Running, break down, preventive and S/D maintenance of electrostatic precipitator (ESP) & its sub systems for unit no. 1, 2 & 3 (capacity – 3 X 210MW) all areas under stage – 1 Ash handling plant electrical maintenance deptt., KTPS | 24-01-2017 | Original | |||
5836 | STPS/11735 | Supplying & spraying pesticides for mosquito and harmful insect control within STPS (T) | 20-01-2017 | Original | |||
5837 | BTPS/11734 | Various maintenance jobs of EL-76 pulverizer, coal feeder, P.A/I.D./F.D. fan (mandatory & optional basis) of unit No.1,2,3 & 4 (4 X 60 MW), BTPS on annual maintenance contract basis | 28-01-2017 | Original | |||
5838 | BTPS/11733 | Servicing of Boiler front & wind box of unit no.3 (60MW) during its overhauling at BTPS | 24-01-2017 | Original | |||
5839 | BTPS/11732 | Mechanical maintenance of Fly ash handling system, Bottom ash handling system along with ash silo handling system of unit No.1,2,3 & 4 (4 X 60 MW), BTPS on annual maintenance contract basis | 25-01-2017 | Original | |||
5840 | BkTPP/11731 | Annual Maintenance Contract for different plant buildings of MP-1, 2, 3, CHP, Simulator building, roads inside plant and minor civil construction at BkTPP | 15-02-2017 | Original |