2041 | STPS/13014 | WBPDCL/STPS/NIT/E2431/21-22 | Procurement of 01 set blade for PA Fan Model No-PAF17/11.8-2 under BMD,STPS. | 03-08-2021 | Original | ||
2042 | KTPS/12839 | WBPDCL / KTPS / NIT /E-1938/21-22 | PROCUREMENT OF 4000 LTR HYDRAZINE HYDRATE | 11-08-2021 | Original | ||
2043 | KTPS/12838 | WBPDCL/KTPS/NIT/E1934/21-22 | Repairing, painting of interior and exterior wall, windows, doors and construction of room of Chemical building at KTPS | 14-08-2021 | Original | ||
2044 | KTPS/12837 | WBPDCL/KTPS/NIT/E1937/21-22 | Repair & protective painting of railing, cell door, cold basin door, renovation of east & west side stair of cooling tower at KTPS | 14-08-2021 | Original | ||
2045 | KTPS/12836 | WBPDCL/KTPS/NIT/E1935/21-22 | Polishing of existing old terrazo tiles of Power House Building at Turbine floor level at KTPS | 14-08-2021 | Original | ||
2046 | KTPS/12835 | GM(K)/CC/CHP-EM/3304/E1941/21-22 | Rate Contract for Low Tension motor maintenance like overhauling and rewinding of motor at CHP area under CHP-E/M for Two years. | 09-08-2021 | Original | ||
2047 | BTPS/12712 | WBPDCL/BTPS/NIT/E1922/21-22 | Procurement of 200 MT Hydrochloric Acid for Chemical Laboratory, BTPS. | 11-08-2021 | Original | ||
2048 | BkTPP/12586 | WBPDCL/BKTPP/NIT/E1863/21-22 | Procurement of Tower AC to be installed at Server Rooms & ESP Control & Panel room and its installation, testing and commissioning. | 02-08-2021 | Original | ||
2049 | STPS/13013 | WBPDCL/STPS/NIT/E2419/21-22 | Overhauling of Tri-sector Rotary Air-Preheater, CCP, Coal & Oil Burner, SADC and Windbox of 250MW Unit#5 of STPS,WBPDCL. | 11-08-2021 | 11-08-2021 | Original | |
2050 | STPS/13012 | WBPDCL/STPS/NIT/E2425/21-22 | Overhauling of Air & Flue Gas duct and ESP Inlet Distribution box of 250MW Unit#5 of STPS, WBPDCL. | 11-08-2021 | 11-08-2021 | Original | |
2051 | SgTPP/12574 | E1451 | ONLINE FORWARD AUCTION FOR Selling of Mixed Scrap“from SAGARDIGHI THERMAL POWER PROJECT (SgTPP), WBPDCL. | 24-07-2021 | 24-07-2021 | Original | |
2052 | SgTPP/12573 | WBPDCL/SGTPP/NIT/E1652/21-22 | Boundary wall around the HSD Pumping Station area at SgTPP/WBPDCL. | 11-08-2021 | Original | ||
2053 | KTPS/12834 | WBPDCL/KTPS/NIT/E1932/21-22 | Repairing and maintenance of roof shed and some other miscellaneous civil job of contractors shed at KTPS | 14-08-2021 | Original | ||
2054 | BkTPP/12585 | E1450 | ONLINE FORWARD AUCTION For Selling of Various Scrap items from BAKRESWAR THERMAL POWER STATION (BkTPS), WBPDCL. | 05-08-2021 | 05-08-2021 | Original | |
2055 | SgTPP/12572 | WBPDCL/SGTPP/NIT/E1658/21-22 | Procurement Of Boiler Different Straight Tubes Of stage- 2 (2 X 500 MW) for Sagardighi Thermal Power Project, WBPDCL | 09-08-2021 | Original | ||
2056 | CORP/12440 | WBPDCL/CORP/NIT/E1449/21-22 Dtd:-16/07/2021 | Rehabilitation & Resettlement (R&R) colony at Bishunpur village, Distt. Pakur, State: Jharkhand for Pachhawara (North) coal mine | 20-08-2021 | Original | ||
2057 | CORP/12439 | WBPDCL/CORP/NIT/E1448/21-22 | Service Contract for FMS (Facility Management System) of Intercom System (EPABX) at Corporate Office including Material required as per scope of work | 28-07-2021 | 28-07-2021 | Original | |
2058 | BkTPP/12584 | WBPDCL/BKTPP/NIT/E1857/21-22 | SUPPLY OF 06(SIX) SETS GRINDING ELEMENT FOR STAGE-1 BOILER AT BKTPP | 02-08-2021 | Original | ||
2059 | STPS/13011 | WBPDCL/STPS/NIT/E2423/21-22 | Overhauling job of PA, ID & FD Fans, Gates and Dumper of Unit #5 of 250 MW, STPS, WBPDCL. | 07-08-2021 | 07-08-2021 | Original | |
2060 | STPS/13010 | WBPDCL/STPS/NIT/E2424/21-22 | Rate Contract for erosion resistance metal coating on boiler tube of U#5 boiler during Overhauling, STPS, WBPDCL. | 07-08-2021 | 07-08-2021 | Original | |
2061 | STPS/13009 | WBPDCL/STPS/NIT/E2417/21-22 | Overhauling job of Boiler Pressure Parts of Unit#5 under MM(B&A) Dept. STPS, WBPDCL. | 14-08-2021 | 14-08-2021 | Original | |
2062 | STPS/13008 | WBPDCL/STPS/NIT/E2371/21-22 | Two years Mechanical Maintenance Contract for entire Ash Handling Plant for two units of 250 MW at STPS ,WBPDCL . | 16-08-2021 | 16-08-2021 | Original | |
2063 | KTPS/12833 | WBPDCL/KTPS/NIT/E1883/21-22 | Supply of HT & LT flexible copper POWER TRAILING cable for SR-1/2,PF-1/2/3/4 and under CHP-EM,KTPS. | 09-08-2021 | 09-08-2021 | Original | |
2064 | SgTPP/12571 | WBPDCL/SGTPP/NIT/E1651/21-22 | Construction of fencing around Mini-Market at SgTPP Township. | 09-08-2021 | Original | ||
2065 | BTPS/12711 | WBPDCL/BTPS/NIT/E1921/21-22 | Testing and Certification of various Lifting Tools and Tackles, Pressure Vessels, Cranes and Lifts on Annual Rate Contract basis for 2 years. | 28-07-2021 | Original | ||
2066 | STPS/13007 | e1447 | ONLINE FORWARD AUCTION(2nd time Re-auction) FOR Selling of “Dry CENOSPHERE” from SANTALDIH THERMAL POWER STATION (STPS), WBPDCL | 02-08-2021 | 02-08-2021 | Original | |
2067 | KTPS/12832 | GM(K)/CC/CHP-O/3009 (vol 4)/E1939/21-22 | Annual Rate Contract for The cleaning and housekeeping at all routes of Conv 7A B C D routes decking plate floor at CHP KTPS for contractual period of two years | 06-08-2021 | Original | ||
2068 | BTPS/12710 | WBPDCL/BTPS/NIT/E1920/21-22 | Procurement of Energy Efficiency LED Luminaries for CHP, BTPS on Urgent Basis. | 05-08-2021 | Original | ||
2069 | BTPS/12709 | WBPDCL/BTPS/NIT/E1919/21-22 | Design, Supply, Installation & Commissioning of 145KV Disconnector at BTPS. | 06-08-2021 | Original | ||
2070 | BTPS/12708 | WBPDCL/BTPS/NIT/E1918/21-22 | Renovation of existing dilapidated godown near Carpool to accommodate contractor's office cum staff room BTPS. | 05-08-2021 | Original | ||
2071 | KTPS/12831 | WBPDCL / KTPS / NIT /E-1860/21-22 | PROCUREMENT OF H2 GAS ALONG WITH CYLINDER MAINTENANCE | 26-07-2021 | Original | ||
2072 | SgTPP/12570 | WBPDCL/SGTPP/NIT/E1643/21-22 | Supply, Installation & Maintenance of Amusement Equipment of Park at SgTPP Township. | 02-08-2021 | Original | ||
2073 | STPS/13006 | WBPDCL/STPS/NIT/E2418/21-22 | Annual Rate Contract (ARC) for Fire-Fighting system maintenance under F&S Dept., STPS. | 06-08-2021 | Original | ||
2074 | STPS/13005 | WBPDCL/STPS/NIT/E2422/21-22 | Cable laying & Fixing of various sizes LT power Cables in Underground inside STPS Township under EM-OPH (T/S) dept. | 06-08-2021 | Original | ||
2075 | STPS/13004 | WBPDCL/STPS/NIT/E2376/21-22 | Maintenance Contract for supplying of unskilled worker and skilled technician for daily assistance in maintenance of electrical equipments & systems at STPS under IPH (E) Dept. Santaldih. T. P. S. for 02 (Two) years. | 06-08-2021 | Original | ||
2076 | KTPS/12830 | WBPDCL/KTPS/NIT/E1933/21-22 | Renovation & Life enhancement of super structure and shed of conveyors & cable gallery at KTPS | 14-08-2021 | 14-08-2021 | Original | |
2077 | STPS/13003 | WBPDCL/STPS/NIT/E2427/21-22 | Overhauling job of different Static Equipments of 250MW Unit#5 under T&A Dept. of STPS, WBPDCL. | 27-07-2021 | 27-07-2021 | Original | |
2078 | STPS/13002 | WBPDCL/STPS/NIT/E2426/21-22 | Overhauling job of HP & LP Valves of Unit#5 under T&A Dept. STPS, WBPDCL. | 03-08-2021 | 03-08-2021 | Original | |
2079 | BkTPP/12583 | WBPDCL/BKTPP/NIT/E1853/21-22 | Procurement of 415V AC & 220V DC motors for BKTPP | 23-07-2021 | Original | ||
2080 | STPS/13001 | WBPDCL/STPS/NIT/E2412/21-22 | Procurement of Spares for Excentric Crusher of Unit#5 under AHP (M/M) Dept.,STPS. | 19-07-2021 | Original |