The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
2081 | BTPS/12707 | WBPDCL/BTPS/NIT/E1917/21-22 | Procurement of moisture precipitator LVDH600 at CHP, BTPS. | 05-08-2021 | Original | ||
2082 | STPS/13000 | WBPDCL/STPS/NIT/E2409/21-22 | Procurement of Different Mechanical Fittings for O/H of Unit # 5 in 2021 under AHP(M/M) dept.,STPS | 19-07-2021 | Original | ||
2083 | BkTPP/12582 | WBPDCL/BKTPP/NIT/E1848/21-22 | Tender for Procurement of Steel Materials for CHP at BKTPP | 23-07-2021 | Original | ||
2084 | BTPS/12706 | WBPDCL/BTPS/NIT/E1916/21-22 | Procurement of different type of Electrical Fuse items for BTPS. | 02-08-2021 | Original | ||
2085 | STPS/12999 | STPS/20-21/CIVIL_IPH/5962 | WBPDCL/STPS/NIT/E2402/21-22 | 07-08-2021 | Original | ||
2086 | STPS/12998 | STPS/21-22/Contract_Cell/6535 | WBPDCL / STPS / NIT/ E2334/ 20-21 | 12-07-2021 | Original | ||
2087 | KTPS/12829 | GM(K)/CC/ITC/2720 (Vol-4)/E1809/20-21 | Maintenance Contract for comprehensive maintenance of Room Air Conditioners at KTPS for Two years | 02-08-2021 | Original | ||
2088 | STPS/12997 | WBPDCL/STPS/NIT/E2421/21-22 | Procurement of various sizes of MS ERW Pipes (Make: Jindal/SAIL/ TISCO) under CHP (MM) Dept., Santaldih T.P.S. | 23-07-2021 | 23-07-2021 | Original | |
2089 | KTPS/12828 | GM(K)/CC/T&A/2987 (Vol 4)/E1931 | Annual Rate Contract for performing different type's of day to day mechanical maintenance jobs under TA/M & TM area at KTPS (TM-1,TM-2 & TM-3 area). | 03-08-2021 | Original | ||
2090 | STPS/12996 | WBPDCL/STPS/NIT/E2406/21-22 | Procurement of 200,000 Kg Liquid Chlorine under Chemical department, STPS, WBPDCL | 23-07-2021 | 23-07-2021 | Original | |
2091 | BTPS/12705 | WBPDCL/BTPS/NIT/E1915/21-22 | Rate Contract for Preparation & Catering of Meals (Vegetarian & Non-Vegetarian) and Tea, Snacks items at BTPS Canteen. | 30-07-2021 | Original | ||
2092 | BTPS/12704 | WBPDCL/BTPS/NIT/E1914/21-22 | Procurement, installation and commissioning of bottom ring rail, top ring rail, and necessary fittings for Wagon tippler 2, CHP, BTPS. | 09-08-2021 | Original | ||
2093 | KTPS/12827 | WBPDCL/KTPS/NIT/E1925/21-22 | Roof treatment work at intake pump house at K.T.P.S | 07-08-2021 | Original | ||
2094 | KTPS/12826 | WBPDCL/KTPS/NIT/E1922/21-22 | Repairing and maintenance of CW Acidulation plant Bulk Acid storage system Stg II at KTPS. | 07-08-2021 | 07-08-2021 | Original | |
2095 | KTPS/12825 | WBPDCL/KTPS/NIT/E1879/21-22 | Repairing & maintenance of existing fencing surrounding 400 KV switch yard at KTPS. | 07-08-2021 | Original | ||
2096 | KTPS/12824 | WBPDCL/KTPS/NIT/E1923/21-22 | Roof treatment work at PLC Building and Utulity building at K.T.P.S. | 07-08-2021 | Original | ||
2097 | SgTPP/12569 | WBPDCL/SGTPP/NIT/E1656/21-22 | Overhauling of Mechanical system for ash handling plant of U # 3 Stg II | 02-08-2021 | 02-08-2021 | Original | |
2098 | SgTPP/12568 | WBPDCL/SGTPP/NIT/E1648/21-22 | Procurement of Different Sizes of Channel, Gratings, I Beam, GI Pipe for Miscellaneous Works at AHP-MM, Stg-II OF SGTPP / WBPDCL | 30-07-2021 | Original | ||
2099 | SgTPP/12567 | WBPDCL/SGTPP/NIT/E1647/21-22 | Procurement of 03 Nos. HT MOTORS for STG-II AHP-E/M dept. of SGTPP under the CAPEX Head for FY 2021-22. | 30-07-2021 | Original | ||
2100 | CORP/12438 | WBPDCL/CORP/NIT/E1446/21-22 | Providing Security Service for Guarding the Properties / Premises and other Security Related jobs at Office of GM (Mining)and Guest House of WBPDCL Durgapur Projects Limited Township, Dr. B.C.Roy Avenue, Durgapur, Paschim Bardhaman-713201,West Ben | 03-08-2021 | 03-08-2021 | Original | |
2101 | STPS/12995 | WBPDCL/STPS/NIT/E2413/21-22 | Repairing & maintenance work of Ash Pond, STPS. | 30-07-2021 | Original | ||
2102 | STPS/12994 | WBPDCL/STPS/NIT/E2381/21-22 | Evacuation of settled ash from ash pond-1/ash pond-2, transportation and disposal in eco-friendly manner from STPS,WBPDCL. | 06-08-2021 | Original | ||
2103 | STPS/12993 | WBPDCL/STPS/NIT/E2318/20-21 | Sprinkling of water over the roads in Silo area, CHP area, Fly ash siding platform area and sprinkling of water on the plying path of bagged ash loaded vehicles at STPS. | 20-07-2021 | Original | ||
2104 | KTPS/12823 | WBPDCL/KTPS/NIT/E1929/21-22 | Repairing and Renewing steel window of C.T. Switch Gear at KTPS. | 07-08-2021 | 07-08-2021 | Original | |
2105 | CORP/12437 | WBPDCL/CORP/NIT/E1440/21-22 | Procurement with Installation & Commissioning of 04 nos 25 Mtr high mast tower with 350 W LED Luminaire at Hazratpur Railway Sidings (E.R) in West Bengal | 27-07-2021 | 27-07-2021 | Original | |
2106 | STPS/12992 | WBPDCL/STPS/NIT/E2411/21-22 | Procurement of various type of Cables for the use of electrical protection in different Power Transformers under EM(OPH) Dept., Santaldih T.P.S. | 14-07-2021 | Original | ||
2107 | SgTPP/12566 | WBPDCL/SGTPP/NIT/E1644/21-22 | Overhauling of 03 nos. Conveying Air Compressor motor (HT) of Ash handling plant unit # 1, SgTPP | 26-07-2021 | 28-07-2021 | Original | |
2108 | BkTPP/12581 | WBPDCL/BKTPP/NIT/E1846/21-22 | 500 MW Simulator With a provision of future addition of 660MW & 800MW at BKTPP | 04-08-2021 | Original | ||
2109 | SgTPP/12565 | WBPDCL/SGTPP/NIT/E1639/21-22 | Dredging of inlet channel (as per requirement) including adjacent river mouth to ensure steady supply of water to intake pump house of SgTPP for 01 year. | 28-07-2021 | Original | ||
2110 | STPS/12991 | WBPDCL/STPS/NIT/E2389/21-22 | Procurement of critical spares and consumable materials for Railway Signal system under CHP(EM) Dept., Santaldih T.P.S. | 16-07-2021 | 16-07-2021 | Original | |
2111 | KTPS/12822 | GM(K)/CC/2732/MO (Vol. 5)/E1870/21-22 | ARC for deployment of casual workers as errand boy at stg. II under M.O. department | 26-07-2021 | Original | ||
2112 | KTPS/12821 | GM(K)/CC/EM-OPH/ 2775/(Vol 4) /E1921 | Annual Maintenance contract for electrical maintenance including Illumination system at KTPS Township under EM-OPH-IV. | 27-07-2021 | Original | ||
2113 | KTPS/12820 | WBPDCL/KTPS/NIT/E1920/21-22 | Cleaning and removing of silt, ash, sludge etc. from metro ducts / drains etc. including Transportation of ash to deposal areas at KTPS. | 07-08-2021 | 07-08-2021 | Original | |
2114 | BTPS/12703 | WBPDCL/BTPS/NIT/E1913/21-22 | Service Contract for Removal of Jammed Pin and servicing of power cylinders and Erection of Platforms at top of Mills of U#5 during Overhauling under CandI Dept., BTPS | 19-07-2021 | Original | ||
2115 | STPS/12990 | WBPDCL/STPS/NIT/E2414/21-22 | Design & Engineering, Manufacture, Procurement, Supply, Installation, Testing and Commissioning of Rain Water Harvesting and Zero Liquid Discharge(RWHZLDS) System at Sabntaldih Thermal Power Station in turnkey basis. | 20-08-2021 | Original | ||
2116 | SgTPP/12564 | WBPDCL/SGTPP/NIT/E1633/21-22 | Erection of hand rail & Staicase at Ash pipe rack | 21-07-2021 | 23-07-2021 | Original | |
2117 | STPS/12989 | WBPDCL/STPS/NIT/E2404/21-22 | Annual Contract for deploying manpower for assisting in different job at Fire & Safety Dept, STPS. | 20-07-2021 | Original | ||
2118 | STPS/12988 | WBPDCL/STPS/NIT/E2340/20-21 | Installation of Insulating floor coating at 415 V switchgears U#5&6 under AHP(EM),Santaldih T.P.S. | 15-07-2021 | Original | ||
2119 | SgTPP/12563 | WBPDCL/SGTPP/NIT/E1637/21-22 | Construction of two R.C.C platforms for economizer coil repairing and their storage near Unit#1 AHP at SgTPP, WBPDCL. | 28-07-2021 | Original | ||
2120 | SgTPP/12562 | WBPDCL/SGTPP/NIT/E1621/21-22 | Construction of Coal rack sampling machine room along with referee sample storage facilities at SgTPP CHP area, WBPDCL, Murshidabad. | 28-07-2021 | Original |