The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
2161 | STPS/12972 | WBPDCL/STPS/NIT/E2362/21-22 | Procurement of printing items under HR&A Dept., Santaldih T.P.S. | 28-07-2021 | 28-07-2021 | Original | |
2162 | KTPS/12805 | GM(K)/CC/EMOPH/3414/E1882/21-22 | Renovation of Electrical system of Hospital, D, C, B, A and F type Quarters at KTPS | 23-07-2021 | Original | ||
2163 | KTPS/12804 | GM(K)/ CC/ PCI/ 2933 (Vol 6)/E1912 | Annual Rate contract for the job of Various day to day Departmental Job related to PCI from U#1 to U#6 including OPH area & short shut down under PCI,KTPS. | 23-07-2021 | Original | ||
2164 | BTPS/12700 | WBPDCL/BTPS/NIT/E1910/21-22 | Procurement of one Coulometric KF Titrator for Chemical Laboratory, BTPS. | 19-07-2021 | Original | ||
2165 | CORP/12433 | WBPDCL/CORP/NIT/E1443/21-22 | Providing Housekeeping and Catering Services at the WBPDCL Guest House at Durgapur Projects Limited Township, Dr. B.C.Roy Avenue, Durgapur, Paschim Bardhaman – 713 201, West Bengal | 20-07-2021 | 20-07-2021 | Original | |
2166 | SgTPP/12555 | WBPDCL/SGTPP/NIT/E1635 /21-22 | Procurement of Different Spares for Dry Ash Conveying line readiness through CAPEX 2021-22 for AHP-MM Stg-1 OF SGTPP / WBPDCL | 13-07-2021 | Original | ||
2167 | SgTPP/12554 | WBPDCL/SGTPP/NIT/E1620/21-22 | Renovation of old hydrogen building, development of one N-Pit in Phase#2 chemical house and development of proper approach to administrative building at SgTPP. | 14-07-2021 | Original | ||
2168 | BTPS/12699 | WBPDCL/BTPS/NIT/E1908/21-22 | 2(two) years Maintenance Contract for CandI system of Main plant, Intake pump house, DM Plant and other areas under CandI Dept., BTPS, WBPDCL | 23-07-2021 | Original | ||
2169 | BTPS/12698 | WBPDCL/BTPS/NIT/E1909/21-22 | HP And LP Valve Servcining, HP drain v/v replacement, Equipment cleaning, HRH line hanger support locking and IP stop v/v blanking and normalisation. | 15-07-2021 | Original | ||
2170 | SgTPP/12553 | WBPDCL/SGTPP/NIT/E1628/21-22 | Construction of concrete pavement and drain at silo area and rigid pavement at CHP area SgTPP, Murshidabad. | 21-07-2021 | Original | ||
2171 | KTPS/12803 | WBPDCL/KTPS/NIT/E1909/21-22 | Annual rate contract for cutting, cleaning of jungle, bushes etc and anti-weed treatment at any places inside plant premises at KTPS | 10-07-2021 | 10-07-2021 | Original | |
2172 | KTPS/12802 | GMOH-6(K)/CC/BM/3389/E1905/21-22 | Overhauling of Boiler Pressure and Non Pressure parts HP valves and Dampers Gates and Actuators Of Unit 6 during overhauling in Aug2021 | 16-07-2021 | Original | ||
2173 | BTPS/12697 | WBPDCL/BTPS/NIT/E1907/21-22 | Procurement of one Digital Conductivity Meter, one pH Meter, and one TSS cum Turbidity Analyser for Chemical Laboratory, BTPS. | 16-07-2021 | Original | ||
2174 | KTPS/12801 | GMOH-6(K)/CC/BM/3390/ E1906/21-22 | Overhauling of Coal Burner Coal Pipe at Unit 6 in Aug 2021 | 15-07-2021 | Original | ||
2175 | KTPS/12800 | WBPDCL/KTPS/NIT/E1894/21-22 | Erection of new cycle stand with shade at KTPP high school and construction of one canteen at school premises of KTPS Township. | 10-07-2021 | 10-07-2021 | Original | |
2176 | KTPS/12799 | WBPDCL/KTPS/NIT/E1893/21-22 | Dismantling of 04 nos damaged lighting tower & renovation of 07 nos. lighting towers in the rail yard and coal yard at CHP area at KTPS | 10-07-2021 | 10-07-2021 | Original | |
2177 | KTPS/12798 | GM(K)/CC/Testing/3396 /E1903/21-22 | Commissioning of Numerical O C and E F Relays for 6.6KV 415V Stg 1 or 2 Unit or station Bus System under approved CAPEX 2021 22 SL NO 3 | 15-07-2021 | Original | ||
2178 | STPS/12971 | WBPDCL/STPS/NIT/E2349/21-22 | Procurement of 250m Conveyor Belt with 800/4 specification and width 1600 mm under CHP (MM) Dept., Santaldih T.P.S. | 06-07-2021 | 06-07-2021 | Original | |
2179 | KTPS/12797 | GM(K)/CC/EM-IPH/2608 (Vol 5)/E1900/21-22 | Bi-Annual Rate Contract for operation and maintenance of Air Washery System, KTPS. | 17-07-2021 | Original | ||
2180 | KTPS/12796 | GMOH-6(K)/ CC/BM/3387/E1898/21-22 | Overhauling of boiler non-pressure parts ( ID fan , FD fan & PA fan) at unit #6 in aug'2021 | 17-07-2021 | Original | ||
2181 | KTPS/12795 | GM(K)/CC/ EM-OPH-2/3395/E1901/21-22 | Oil filtration and Painting of different transformers under the jurisdiction of EMOPH-2(stg I) across various locations at KTPS | 16-07-2021 | Original | ||
2182 | SgTPP/12552 | WBPDCL/SGTPP/NIT/E1618/21-22 | Construction of 02 nos. new park at SgTPP Township. | 12-07-2021 | Original | ||
2183 | KTPS/12794 | GM(K)/CC/CHP-O/3016 (Vol 4)/E1897/21-22 | Annual Rate Contract for The cleaning and different housekeeping at all routes of Conv-9C/D routes ,chutes , decking plate,floor and assistance service for stg-II mobile tripper operation at CHP,KTPS | 17-07-2021 | Original | ||
2184 | BTPS/12696 | WBPDCL/BTPS/NIT/E1906/21-22 | Replacement of PRH Top and Intermediate bank coil, Baffle Wall Inlet Header with associated work during upcoming overhauling of Unit#5, BTPS. | 22-07-2021 | Original | ||
2185 | KTPS/12793 | GMOH-6(K)/CC/AHP-M/3412/E1867/21-22 | Overhauling of AHP of Unit-6 scheduled on Aug,2021 under AHP(MM). | 15-07-2021 | Original | ||
2186 | KTPS/12792 | GM(K)/CC/CHP-(O)/3010 (Vol. 4)/E1841/21-22 | Annual Rate Contract for The cleaning and housekeeping at routes of Post Crusher Zone under conveyor 8A/B/C/D & Conveyor -5 at CHP,KTPS | 13-07-2021 | Original | ||
2187 | KTPS/12791 | GM(K)/CC/CHP-(O)/3015 (Vol 4) /E1902/21-22 | Annual Rate Contract for coal cleaning and housekeeping at all routes of post crusher zone under Conveyor belt 6A/B/C & S/R- 1/2/3 at CHP,KTPS | 16-07-2021 | Original | ||
2188 | KTPS/12790 | GM(K)/CC/AHP-M/3405/E1855/21-22 | Replacement of 400 NB MS ERW Pipe for Ash slurry line -402 (Stg. II) from valve room to Ash pond-5 under CAPEX'21-22 | 13-07-2021 | Original | ||
2189 | KTPS/12789 | GM (K)/CC/TM/3319/E1864/21-22 | Procurement, Erection, Testing & Commissioning of 02 nos. Travelling Water Screen Set (Flow cap.- 4500 m3/hr) under Capex budget of F.Y.2020 - 2021 | 15-07-2021 | Original | ||
2190 | KTPS/12788 | GM(K)/CC/FC/3402/E1896/21-22 | Annual Rate Contract for sampling & related miscellaneous jobs under FC deptt. for 09 contractual workers for 01 year | 15-07-2021 | Original | ||
2191 | KTPS/12787 | GM(K)/CC/CHP-O/3007 (Vol 4)/E1895/21-22 | Annual Rate Contract for The cleaning and different housekeeping at all routes of Conv-9A/B routes ,chutes , decking plate,floor and assistance service for stg-I mobile tripper operation at CHP,KTPS | 15-07-2021 | Original | ||
2192 | KTPS/12786 | GM(K)/CC/EM-OPH/3411/ E1899/21-22 | Installation & commissioning of Aerial Bunch cable & UG cable for plant to township power supply under Capex 21-22. | 15-07-2021 | Original | ||
2193 | KTPS/12785 | GM(K)/CC/TM/3163 (Vol.2)/E1871/21-22 | Annual rate contract to replace Different HP Valves, HP pipe, Bend and Reducer in Turbine maintenance area, KTPS | 15-07-2021 | Original | ||
2194 | KTPS/12784 | GM(K)/CC/TM/3153 (VOL. 3)/E1820/20-21 | Maintenance Contract for engagement of manpower for regular and breakdown maintenance of 24 nos. compressors, cleaning and errand activities at Turbine Maintenance area for two years. | 13-07-2021 | Original | ||
2195 | KTPS/12783 | GM(K)/CC/AHP/3014 (Vol. 3)/E1785/20-21 | Annual Maintenance Contract for Ash slurry disposal lines and its accessories under AHP,KTPS | 13-07-2021 | Original | ||
2196 | KTPS/12782 | GM(K)/CC/CHEM/2639 (Vol.5)/E1833/21-22 | Annual rate contract for Chemical Supply and Service on Turnkey basis for Cooling Water Treatment at CW System of Stage-II units under chemical lab at KTPS | 12-07-2021 | Original | ||
2197 | KTPS/12781 | GM(K)/CC/TM/3004 (Vol. 4)/E1875/21-22 | Annual Rate Contract for Different Type Of Maintenance Jobs At TM IPH & turbine Area By Engagement Of Workers and Various types of tit-bit maintenance jobs (day to day manpower basis) at DM plant Stg.I &II , PTP , CW pump house-Stg.-I, II , CTMU pump h | 12-07-2021 | Original | ||
2198 | BTPS/12695 | WBPDCL/BTPS/NIT/E1905/21-22 | Service Contract for low pressure valves & NRVs servicing of auxiliaries equipment under T&A Dept., BTPS, WBPDCL. | 05-07-2021 | Original | ||
2199 | BTPS/12694 | WBPDCL/BTPS/NIT/E1904/21-22 | Overhauling of ID and FD Fan, Replacement and Overhauling of Voith Coupling of Unit#5 under BandA, BTPS, WBPDCL | 14-07-2021 | Original | ||
2200 | STPS/12970 | WBPDCL/STPS/NIT/E2399/21-22 | Procurement of Sealing Strip for HP & IP Turbine Shaft Sealing and other different Fasteners for Capital Overhauling of Unit#6, under T&A Department, Santaldih T.P.S., WBPDCL | 06-07-2021 | 06-07-2021 | Original |