Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
2761 | SgTPP/12440 | WBPDCL/SGTPP/NIT/E1420/20-21 | Annual Maintenance Contract of ( 2 x 500 MW ) Turbine & auxiliary equipments under the scope of T&A – IPH department , SgTPP. | 01-12-2020 | 01-12-2020 | Original | |
2762 | BTPS/12594 | NIT NO: WBPDCL/BTPS/NIT/E1802/20-21 | Procurement & Retrofitting of 36KV Isolator at BTPS, WBPDCL. | 30-11-2020 | Original | ||
2763 | KTPS/12632 | WBPDCL / KTPS / NIT /E-1703/20-21 | DIFFERENT TERSG VALVE FOR DRY FLY ASH SYSTEM FOR OVERHAULING OF UNIT NO.5 | 24-11-2020 | Original | ||
2764 | KTPS/12631 | WBPDCL / KTPS / NIT /E-1709/20-21 | DIFFERENT CI BEND FOR DRY ASH SYSTEM FOR OVERHAULING OF UNIT NO.5 | 24-11-2020 | Original | ||
2765 | KTPS/12630 | WBPDCL / KTPS / NIT /E-1711/20-21 | DIFFERENT VALVES AND ACCESSORIES OF DRY ASH SYSTEM FOR OVERHAULING OF UNIT 5 | 26-11-2020 | Original | ||
2766 | KTPS/12629 | WBPDCL / KTPS / NIT /E-1701/20-21 | DIFFERENT ERW PIPES AND BEND | 25-11-2020 | Original | ||
2767 | BkTPP/12529 | WBPDCL/BKTPP/NIT/E1637/20-21 | ANNUAL MAINTENANCE CONTRACT FOR PREVENTIVE, PERIODIC, RUNNING & BREAKDOWN MAINTENANCE OF CRANES & HOISTS IN AHP, TURBINE & BOILER AREA OF BKTPP | 26-11-2020 | Original | ||
2768 | BkTPP/12528 | WBPDCL/BKTPP/NIT/E1636/20-21 | ANNUAL MAINTENANCE CONTRACT FOR SERVERS, WORK STATIONS, PCS & LAPTOPS & NECESSARY NETWORKING HARDWARE & ACCESSORIES USED IN DCS AND PLC HMI SYSTEM OF UNIT #1, 3, 4 & 5 OF BKTPP | 26-11-2020 | Original | ||
2769 | STPS/12874 | WBPDCL/STPS/NIT/E2206/20-21 | Procurement of Crusher for Unit#6 Bottam Ash Hopper under AHP(M/M) dept.,STPS. | 23-11-2020 | Original | ||
2770 | STPS/12873 | WBPDCL/STPS/NIT/E2219/20-21 | Procurement of 600 Tonne Sulphuric Acid under Chemical department, STPS, WBPDCL | 23-11-2020 | 23-11-2020 | Original | |
2771 | BTPS/12593 | NIT NO: WBPDCL/BTPS/NIT/E1801/20-21 | Procurement of Fine Chemicals and Laboratory Items for Chemical Laboratory, BTPS, WBPDCL. | 25-11-2020 | 25-11-2020 | Original | |
2772 | KTPS/12628 | WBPDCL/KTPS/NIT/E1706/20-21(166AHBD20-21H5ET) | Supply & delivery of different Spares (Alloy CI) for Fly Ash Evacuation System for O/H of U # 5 at KTPS.WBPDCL/KTPS/NIT/E1706/20-21 | 23-11-2020 | 23-11-2020 | Original | |
2773 | BkTPP/12527 | WBPDCL/BKTPP/NIT/E1584/20-21 | CONSTRUCTION OF NEW DRAIN FROM SANGRAMPUR VILLAGE TO EXISTING DRAIN AT SARMARA (1380 Mtr.) near ASH POND-2,BKTPP | 27-11-2020 | Original | ||
2774 | BkTPP/12526 | WBPDCL/BKTPP/NIT/E1629/20-21 | Contract for CW Treatment Chemicals for BkTPS (I to V) unit for two(02) years | 19-11-2020 | Original | ||
2775 | KTPS/12627 | GM (K)/CC/BM/3171 (Vol.2)/E1677/20-21 | Annual Rate contract for repairing of Coal Bunker and Outlet Chute of Coal Bunker from Unit#3 to #6. | 24-11-2020 | Original | ||
2776 | BkTPP/12525 | WBPDCL/BKTPP/NIT/1628/20-21 | ANNUAL CONTRACT FOR SIEVE ANALYSIS & OTHER JOBS RELATED AND FEEDER COAL SAMPLE COAL SAMPLE COLLECTION TO OPERATION EFFICIENCY DEPARTMENT OF BKTPP | 04-11-2020 | 04-11-2020 | Original | |
2777 | BkTPP/12524 | WBPDCL/BKTPP/NIT/E1626/20-21 | ANNUAL MAINTENANCE CONTRACT FOR ELECTRICAL MAINTENANCE WORK OF INSIDE POWER HOUSE, ESP & AHP AREA (UNIT # 1 TO 5) INCLUDING OVERHAULING OF BKTPP | 23-11-2020 | 23-10-2020 | Original | |
2778 | BkTPP/12523 | WBPDCL/BKTPP/NIT/E1619/20-21 | JOB – I: ANNUAL MAINTENANCE CONTRACT FOR OPERATION & MAINTENANCE OF LIFTS / ELEVATOR IN DIFFERENT LOCATION OF PLANT UNDER EM-IPH DEPARTMENT AT BKTPP. JOB – II: RATE CONTRACT FOR STANDBY DUTY OF SERVICE PERSONNEL FOR ELEVATORS DURING UNIT OVERHAULING AT | 10-11-2020 | 10-11-2020 | Original | |
2779 | BTPS/12590 | WBPDCL/BTPS/NIT/E1800/20-21 | Construction of Structural shed near H2 (Hydrogen) Gas Godown to keep hydraulic ladder (Genie) & other store materials. | 23-11-2020 | Original | ||
2780 | BTPS/12589 | WBPDCL/BTPS/NIT/E1799/20-21 | De-silting work at the River mouth of Intake Pump House of Stage - I & Stage -II at BTPS. | 13-11-2020 | Original | ||
2781 | BTPS/12588 | WBPDCL/BTPS/NIT/E1798/20-21 | Pre-fabricated plastomeric water proofing membrane lining work over the roof of OPH building at Plant area of BTPS. | 13-11-2020 | Original | ||
2782 | BTPS/12587 | WBPDCL/BTPS/NIT/E1797/20-21 | Procurement of insulators for ESP Unit#5 under AHP (EM) division, BTPS. | 11-11-2020 | Original | ||
2783 | BTPS/12586 | 2020_WBPDC_302800_1 | Overhauling Procurement of 150 NB MS ERW PIPE, O.D 168.3 MM from OUTLET OF PD PUMP TO SILO AREA for UNIT#5, BTPS. | 11-11-2020 | Original | ||
2784 | BTPS/12585 | WBPDCL/BTPS/NIT/E1795/20-21 | Inspection of all TG bearings (1 to 7), NDT of Brg.- 1&2, set right of Turbine insulation and inspection, rectification of generator seal system of Unit #5 TG set, BTPS. | 13-11-2020 | Original | ||
2785 | BTPS/12584 | WBPDCL/BTPS/NIT/E1794/20-21 | Hiring of one new Bolero Mahindra / Tata make AC Ambulance, latest model or equivalent for BTPS hospital and plant duty | 23-11-2020 | Original | ||
2786 | KTPS/12626 | WBPDCL/KTPS/NIT/E1676/20-21 | Administrative approval for painting work during Unit-5 capital overhauling under TM-1 | 23-11-2020 | Original | ||
2787 | BkTPP/12522 | WBPDCL/BKTPP/NIT/E1631/20-21 | ANNUAL CONTRACT FOR ROUND THE CLOCK CHLORINE DOSING OPERATION OF BKTPP | 17-11-2020 | Original | ||
2788 | BkTPP/12521 | WBPDCL/BKTPP/NIT/E1630/20-21 | ANNUAL MAINTENANCE CONTRACT FOR ELECTRICAL MAINTENANCE WORK AT TOWNSHIP, ADMINISTRATIVE BUILDING, SIMULATOR, ABDARPUR GUEST HOUSE COMPLEX ETC. OF BKTPP | 18-11-2020 | Original | ||
2789 | KTPS/12625 | GM(K)/CC/EMOPH/3256/E1719 | ARC for repairing (mechanical jobs only) HT & LT motors under EMOPH,KTPS | 27-11-2020 | Original | ||
2790 | STPS/12872 | WBPDCL/STPS/NIT/E2220/20-21 | Cleaning, sweeping, washing etc of different floors etc of different buildings, Rest Rooms and areas of CHP at STPS. | 19-11-2020 | Original | ||
2791 | KTPS/12624 | GMOH-5(K)/ CC/ BM / 3347/E1717 | Boiler Tube coating with anti erosion coating of Cr3C2,NiCr by HVOF Process at Unit#5 during overhaul-ing in Feb-march'21.. | 24-11-2020 | Original | ||
2792 | KTPS/12623 | GMOH-5(K)/ CC/ BM / 3345/E1718 | Overhauling of Boiler Non-Pressure Parts (Air Pre-heater) at Unit#5 in Feb-March'2021 | 21-11-2020 | Original | ||
2793 | KTPS/12622 | GMOH-5(K)/ CC/AHP-MM/3352 /E1716 | Overhauling of AHP of Unit-5 Bottom Ash,Dry & Wet Ash System | 21-11-2020 | Original | ||
2794 | KTPS/12621 | GM(K)/ CC/ EM-OPH-IV/ 3354 /E1715 | Re-wiring and Maintenance work of KTPS co-operative at KTPS T/S., and KTPS Recreation Club at KTPS T/S., and KTPS high School at KTPS T/S | 21-11-2020 | Original | ||
2795 | BTPS/12583 | WBPDCL/BTPS/NIT/E1784/20-21 | ARC for maintenance of fire water line, isolating gate valve, basket strainer & deluge valve with strainer maintenance (for one year). | 13-11-2020 | Original | ||
2796 | BTPS/12582 | WBPDCL/BTPS/NIT/E1793/20-21 | Annual Rate Contract for Overhauling of Coal Mill, Coal Feeder and Replacement of Coal Mill Gear Box under jurisdiction of B&A Dept., BTPS, WBPDCL | 13-11-2020 | Original | ||
2797 | KTPS/12620 | WBPDCL/KTPS/NIT/E1700/20-21(159EOBD20-21CET) | Design, manufacture, factory test & supply of 145kv hybrid switchgear under CAPEX FY. 20-21 at KTPS. WBPDCL/KTPS/NIT/E1700/20-21(159EOBD20-21CET) | 20-11-2020 | 20-11-2020 | Original | |
2798 | KTPS/12619 | WBPDCL/KTPS/NIT/E1699/20-21(158EOBD20-21CET) | Design, manufacture, factory test & supply OF 132kv 1C 1000SQMM XLPE COPPER CABLE under CAPEX FY. 20-21 at KTPS. WBPDCL/KTPS/NIT/E1699/20-21(158EOBD20-21CET) | 28-11-2020 | 28-11-2020 | Original | |
2799 | BTPS/12581 | WBPDCL/BTPS/NIT/E1792/20-21 | Procurement of Driving Gear Boxes for Stacker boom 3A/3B & MT Gear Box at Conveyor 12A/12B,at CHP,BTPS. | 19-11-2020 | Original | ||
2800 | BTPS/12592 | WBPDCL/BTPS/NIT/E1791/20-21 | LP Valves checking-replacement, HP Valves servicing, HP drain Valves replace. and HRH line hanger support locking and IP stop Valves blanking and normalization during upcoming overhauling of Unit 5 | 05-11-2020 | Original |