The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
3681 | CORP/12300 | WBPDCL/CORP/NIT/E1293/19-20 | Procurement of 05(five) number of Self Propelled Articulating Boom Lifts for five different Power Stations of WBPDCL through domestic competitive bidding | 04-02-2020 | Original | ||
3682 | BkTPP/12382 | WBPDCL/BKTPP/NIT/E1390/19-20 | SUPPLY OF ORIFICE FOR UNIT#2 AND 3 OVERHAULING | 24-01-2020 | Original | ||
3683 | KTPS/12414 | GM(K)/CC/MO/ 2733/ (Vol 4)/E1466 | ARC for cleaning of mill rejection system,trench and other equipment at stg II under M.O. department. | 07-02-2020 | Original | ||
3684 | STPS/12653 | WBPDCL/STPS/NIT/E1947/19-20 | Job of complete removal of damaged V-bars and Grid materials and refitting with new V-bars and Grid materials of six(06) no. CT cells of Unit # 6 at STPS, WBPDCL | 03-02-2020 | 03-02-2020 | Original | |
3685 | STPS/12652 | WBPDCL/STPS/NIT/E1956/19-20 | ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I dept. of 250 MW unit #5 & 6 of STPS, WBPDCL. | 03-02-2020 | 03-02-2020 | Original | |
3686 | KTPS/12413 | WBPDCL/KTPS/NIT/E1421/19-20 | Supply of Multi Gas Detector with External Pump and Accessories at Kolaghat Thermal Power Station.WBPDCL/KTPS/NIT/E1421/19-20 | 27-01-2020 | 27-01-2020 | Original | |
3687 | BTPS/12403 | WBPDCL/BTPS/NIT/E1609/19-20 | Procurement of BoilerTubes for unit 5 at BTPS WBPDCL. | 05-02-2020 | Original | ||
3688 | BkTPP/12381 | WBPDCL/BKTPP/NIT/E1449/19-20 | COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT OF DS20E & DS10 SERVER, WORK STATIONS INSTALLED AT SIMULATOR BUILDING OF BKTPP | 01-02-2020 | Original | ||
3689 | KTPS/12412 | WBPDCL/KTPS/NIT/E1457/19-20 | Replacement of 68 nos pendent re-heater coils at U#4 during overhauling of U#4. | 03-02-2020 | Original | ||
3690 | BTPS/12402 | WBPDCL/BTPS/NIT/E1608/19-20 | Procurement of Ring and Ball sets for EL-76 Pulverizers for Stage – I Units (2x60 MW), BTPS | 05-02-2020 | Original | ||
3691 | STPS/12651 | WBPDCL/STPS/NIT/E1955/19-20 | Fixing and Termination jobs of various size LT UG cable for T/S electrical supply after cable laying jobs with supply of required materials. | 28-01-2020 | Original | ||
3692 | STPS/12650 | WBPDCL/STPS/NIT/E1949/19-20 | Cable laying of various sizes LT Underground Cables at STPS Township. | 28-01-2020 | Original | ||
3693 | STPS/12649 | WBPDCL/STPS/NIT/E1943/19-20 | AMC for Coal Mill auto rejection system of 2 x 250MW units of STPS under MM(B&A) Department, WBPDCL | 01-02-2020 | 01-02-2020 | Original | |
3694 | KTPS/12411 | WBPDCL / KTPS / NIT /E-1447/19-20 | PROCUREMENT OF OIL LESS LOADING CYLINDER FOR 3 NUMBERS COAL MILL 8.5E(9) OF UNIT NO.4 THROUGH CAPEX FY 2019-20 | 28-01-2020 | Original | ||
3695 | KTPS/12410 | KTEMI22010035 | ARC regarding rewinding and repairing of LT motors under EM-IPH dept. | 15-01-2020 | 25-01-2020 | Original | |
3696 | BkTPP/12380 | WBPDCL/BKTPP/NIT/E1438/19-20 | ANNUAL MAINTENANCE CONTRACT FOR JUNGLE CUTTING INCLUDING TRIMMING & CUTTING OF TREE BRANCHES INSIDE BKTPP PLANT PREMISES | 31-01-2020 | Original | ||
3697 | BTPS/12401 | WBPDCL/BTPS/NIT/E1606/19-20 | Sweeping and cleaning of the Power House Building and other Buildings at BTPS Plant Site (Gr.-A). | 30-01-2020 | Original | ||
3698 | BTPS/12400 | WBPDCL/BTPS/NIT/E1607/19-20 | Renovation of 02 nos. pent house at coal yard, BTPS. | 04-02-2020 | Original | ||
3699 | KTPS/12409 | WBPDCL/KTPS/NIT/E1459/19-20 | Replacement of existing muddy gravel and spreading ballast / hard black stone and anti weed treatment at 400KV switch yard at KTPS | 08-02-2020 | 08-02-2020 | Original | |
3700 | BTPS/12399 | WBPDCL/BTPS/NIT/E1605/19-20 | Procurement of hydrochloric acid | 03-02-2020 | Original | ||
3701 | BTPS/12398 | WBPDCL/BTPS/NIT/E1603/19-20 | Replacement of 116 nos. Primary Reheat Bottom Bank coils of Unit#5, BTPS under B&A Dept., BTPS, WBPDCL | 04-02-2020 | Original | ||
3702 | SgTPP/12372 | WBPDCL/SGTPP/NIT/E1258/18-19 | Procurement of Thermal Insulation for Unit 1 for Sagardighi Thermal Power Project, WBPDCL | 27-01-2020 | 27-01-2020 | Original | |
3703 | BTPS/12397 | WBPDCL/BTPS/NIT/E1604/19-20 | ANNUAL RATE CONTRACT FOR OPERATION OF SILO WEIGHING SYSTEM UNDER OPERATION DEPARTMENT,BTPS | 04-02-2020 | Original | ||
3704 | KTPS/12408 | GM(K)/CC/TM/2993 (Vol. 3)/E1431/19-20 | ARC for Performing Different types of day to day maintenance jobs in TOC, SOC,SWC,CW VV Seals, ACW Basket Strainers, Heat Exchangers under TA M and TM area, KTPS | 28-01-2020 | Original | ||
3705 | BTPS/12396 | WBPDCL/BTPS/NIT/E1602/19-20 | Annual Maintenance Contract for C & I System of Unit # 1, 2 & 5 (2 X 60 + 215 MW), Intake Pump House, DM Plant and other areas at BTPS. | 27-01-2020 | Original | ||
3706 | STPS/12648 | WBPDCL/STPS/NIT/E1942/19-20 | Annual Job contract for round the clock cleaning of new stacker cum reclaimer route at CHP of STPS, WBPDCL. | 29-01-2020 | 29-01-2020 | Original | |
3707 | STPS/12647 | WBPDCL/STPS/NIT/E1941/19-20 | ARC for Roller Screen Overhauling under CHP(M/M) department of STPS, WBPDCL. | 22-01-2020 | 22-01-2020 | Original | |
3708 | STPS/12646 | WBPDCL/STPS/NIT/E1915/19-20 | ARC for Maintenance of Cooling Tower along with CT Fans of 2 X 250 MW unit of STPS, under M/M(T&A) department, WBPDCL . | 29-01-2020 | 29-01-2020 | Original | |
3709 | BkTPP/12379 | WBPDCL/BKTPP/NIT/E1447/19-20 | Supply Of 400 KV & 220 KV Current Transformers | 07-02-2020 | Original | ||
3710 | STPS/12645 | WBPDCL/STPS/NIT/E1951/19-20 | Painting of structural member and its tit bit repairing in Crusher House at STPS. | 31-01-2020 | Original | ||
3711 | STPS/12644 | WBPDCL/STPS/NIT/E1950/19-20 | Repairing, maintenance and painting of steel structure of TP/32, TP/36, TP/39 and TP/40 at CHP of STPS. | 31-01-2020 | Original | ||
3712 | SgTPP/12371 | WBPDCL/CORP/NIT/E1297/19-20 DATED.03.01.2020 | Operation and Maintenance of Fly Ash Brick Manufacturing Unit at Sagardighi Thermal Power Station of WBPDCL | 27-01-2020 | Original | ||
3713 | KTPS/12407 | WBPDCL / KTPS / NIT /E-1394/19-20 | PROCUREMENT OF MS ERW PIPES FOR REPLACEMENT OF THREE LINES FROM CTMU PUMP HOUSE TO PTP UNDER CAPEX FY 2014-15 | 27-01-2020 | Original | ||
3714 | SgTPP/12370 | WBPDCL/SGTPP/NIT/E1342/19-20 | Air Washery System at Unit#1&2, SgTPP /WBPDCL under EMIPH Department SgTPP/WBPDCL, Murshidabad. | 17-01-2020 | Original | ||
3715 | SgTPP/12369 | WBPDCL/SGTPP/NIT/E1338/19-20 | Deployment of semiskilled/Unskilled(Errand Service) Manpower at SgTPP/WBPDCL, murshidabad. | 24-01-2020 | Original | ||
3716 | BkTPP/12378 | WBPDCL/BKTPP/NIT/E1446/19-20 | PAINTING OF TWIN OVERGROUND WATER PIPE LINES [OD - 930 MM & 130 MM] FROM VALVE HOUSE TO RAW WATER POND AND OUTSIDE PLANT OF BKTPP | 30-01-2020 | Original | ||
3717 | BkTPP/12377 | WBPDCL/BKTPP/NIT/E1445/19-20 | ANNUAL MAINTENANCE CONTRACT FOR BOILER & ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-4 & UNIT-5 OF BKTPP | 30-01-2020 | Original | ||
3718 | BkTPP/12376 | WBPDCL/BKTPP/NIT/E1445/19-20 | ANNUAL MAINTENANCE CONTRACT FOR BOILER & ITS AUXILIARY SYSTEM INCLUDING PIECE MEAL JOB OF UNIT-4 & UNIT-5 OF BKTPP | 30-01-2020 | Original | ||
3719 | KTPS/12406 | WBPDCL/KTPS/NIT/E1455/19-20 | Construction of Bituminous road from C.T Make-up Railway level crossing to Gate no. 05 including approach to C.T Make-up pump house at KTPS | 01-02-2020 | 01-02-2020 | Original | |
3720 | CORP/12299 | COHRA00310019/3693 | Digital printing and editing of service certificates | 15-01-2020 | 15-01-2020 | Original |