Sl.No WBPDCL Ref No. TENDER NIT No. Tender Description Last date of Sale of Tender Documents Last Date of Submission of Tender Download
3921 BkTPP/12344 WBPDCL/BKTPP/NIT/E1383/19-20 Supply of Steel Tubular Pole 28-09-2019 Original
3922 STPS/12583 WBPDCL/STPS/NIT/E1877/19-20 Procurement of Upper & Lower Journal Bearing for Unit-5&6 XRP-883 Coal Mill OH and general maintenance under B&A dept., STPS. 16-10-2019 Original
3923 STPS/12582 WBPDCL/STPS/NIT/E1876/19-20 Procurement of spares for Bowl Mill XRP-883 for regular & overhauling maint. under BMD, STPS. 17-10-2019 Original
3924 CORP/12274 WBPDCL/CORP/NIT/E1272/19-20 Evacuation OF ASH from ASH POND No-1/ASH POND No.-2, Transportation, Disposal in eco-friendly manner at Santaldih Thermal Power Station 18-10-2019 Original
3925 CORP/12273 WBPDCL/CORP/NIT/E1262/19-20 FLUE GAS DE-SULPHURISATION PACKAGE 7 UNITS OF 2 PROJECTS {{BAKRESWAR THERMAL POWER STATION (5*210 MW) SANTALDIHI THERMAL POWER STATION (2*250 MW)}}THROUGH BULK TENDERING TURNKEY PACKAGE 25-10-2019 18-11-2019 Original
3926 BkTPP/12343 WBPDCL/BKTPP/NIT/E1388/19-20 ANNUAL MAINTENANCE CONTRACT FOR OPERATION & MAINTENANCE OF VARIOUS MACHINES AT WORKSHOP, BKTPP 16-10-2019 Original
3927 STPS/12581 WBPDCL/STPS/NIT/E1874/19-20 Procurement of Boiler Tube Guard of different size Material SS-304 for Unit-6 Boiler OH Aug-20 under B&A. dept.,STPS 16-10-2019 Original
3928 STPS/12580 WBPDCL/STPS/NIT/E1868/19-20 18-10-2019 18-10-2019 Original
3929 BkTPP/12342 WBPDCL/BKTPP/NIT/E1365/19-20 EARTHWORK FOR LOCAL DEPRESSION AND SUBSIDENCE ZONE IN EARTHEN DAM,BKTPP (PHASE-I) 16-10-2019 Original
3930 STPS/12579 WBPDCL/STPS/NIT/E1872/19-20 Construction of two storey contractors' hutment at STPS. 27-09-2019 27-09-2019 Original
3931 BkTPP/12341 WBPDCL/BKTPP/NIT/E1382/19-20 COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR FOUR NUMBERS OTIS MAKE ELEVATORS AT BKTPP 15-10-2019 Original
3932 STPS/12578 WBPDCL/STPS/NIT/E1857/19-20 Procurement of CEP's consumable spares, under T&A Dept., STPS 21-10-2019 Original
3933 BTPS/12380 WBPDCL/BTPS/NIT/E1585/19-20 Annual Rate Contract for Overhauling of TW Screen, RCW Pump, Screen wash Pump and periodical checking and jamming of TW Screen rectification of unit 1, 2 and 5, BTPS 17-10-2019 Original
3934 STPS/12577 WBPDCL/STPS/NIT/E1856/19-20 Procurement of one Portable Particle Counter for Contamination Analysis of Lub Oil (NAS Value)under Chemical laboratory, STPS. 30-09-2019 Original
3935 BkTPP/12340 WBPDCL/BKTPP/NIT/E1387/19-20 ANNUAL RATE CONTRACT FOR MAJOR CHUTE MAINTENANCE JOB AT CHP OF BKTPP 15-10-2019 Original
3936 KTPS/12355 WBPDCL / KTPS / NIT /E-1388/19-20 Supply of Globe Valves for CTMU Lines Stg-I under Capex, FY:2019-20.(2019_WBPDC_244588_1).WBPDCL / KTPS / NIT /E-1388/19-20 16-10-2019 Original
3937 BkTPP/12339 WBPDCL/BKTPP/NIT/E1384/19-20 OVERHAULING OF (NON PRESSURE PARTS) RECUPERATIVE AIR PRE HEATER, COAL & OIL BURNER, WIND BOX, SADC & BURNER TILT OF 210MW BOILER OF UNIT#1 BKTPP. 26-09-2019 26-09-2019 Original
3938 BkTPP/12338 WBPDCL/BKTPP/NIT/E1385/19-20 OVERHAULING OF BOILER AIR & FLUE GAS DUCTS AND EXPANSION BELLOWS OF 210 MW BOILER OF UNIT#1, BKTPP 26-09-2019 26-09-2019 Original
3939 BkTPP/12337 WBPDCL/BKTPP/NIT/E1386/19-20 INSULATION AND REFRACTORY JOB DURING UNIT – 1 BOILERS OVERHAULING AT BKTPP 26-09-2019 26-09-2019 Original
3940 BTPS/12379 WBPDCL/BTPS/NIT/E1584/19-20 Various Civil Works (Gr. B) at BTPS Township for E, EN, F, FN & CE Type building and other building and structures. 26-09-2019 Original
3941 BTPS/12378 WBPDCL/BTPS/NIT/E1583/19-20 P-way linking with fittings for renovation of existing rail track of BTPS (Phase-I). 26-09-2019 Original
3942 STPS/12576 WBPDCL/STPS/NIT/E1863/19-20 Procurement of Insulation Materials for Unit-6 Boiler Overhauling Aug-20 under B&A, dept., STPS. 24-09-2019 Original
3943 KTPS/12354 GM(K)/CC/TM/3214/E1384/19-20 Replacement of Hot Water Distribution Pipe of One Cooling Tower (Stg.-I) at KTPS under CAPEX Budget of FY: 2019-2020 28-09-2019 Original
3944 KTPS/12353 GM(K)/CC/O & E/3213/E1382/19-20 COAL MILL PERFORMANCE TEST OF STG-1&2 OF KTPS UNDER O&E DEPTT. 28-09-2019 Original
3945 STPS/12575 WBPDCL/STPS/NIT/E1867/19-20 Restoration job of 14 no’s Deluge Valve system in U#5 Coal Bunker , Turbine , Boiler and DG Set area under F&S Dept. 03-10-2019 Original
3946 STPS/12574 WBPDCL/STPS/NIT/E1869/19-20 Procurement of Bearings for Overhauling of U#5 415V LT Motors under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. 20-09-2019 20-09-2019 Original
3947 STPS/12573 WBPDCL/STPS/NIT/E1851/19-20 ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I dept. of 250 MW unit #5 & 6 of STPS, WBPDCL 30-09-2019 30-09-2019 Original
3948 BTPS/12377 WBPDCL /BTPS/NIT/E1580/19-20 Removing sludge from septic tank, soak well etc. at BTPS Township 26-09-2019 Original
3949 BTPS/12376 WBPDCL /BTPS/NIT/E1575/19-20 Supply of workers for Repair and maintenance of drinking water pipeline at BTPS Township 26-09-2019 Original
3950 STPS/12572 WBPDCL/STPS/NIT/E1864/19-20 Procurement of LT Underground Cables for replacement of existing Overhead 415V Distribution lines inside STPS Township under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. 26-09-2019 26-09-2019 Original
3951 BTPS/12375 WBPDCL/BTPS/NIT/E1582/19-20 Annual Maintenance Contract of Desktops, Printers & other IT related peripherals at BTPS 26-09-2019 Original
3952 CORP/12272 WBPDCL/CORP/NIT/E1270/19-20 Erection of R.C.C. Boundary Pillars to cordon off 20.40 Ha land within mining lease area of 846.93 Ha of non-forest land of Pachhwara (North) coal mine in districts of Jharkhand 20-09-2019 Original
3953 KTPS/12352 GM(K)/CC/TM/3215/E1385/19-20 Replacement of the existing MSRL Pipes of 03 nos. CTMU Lines from Acidulation Plant (Stg.-I) to CTs 1, 2 &3 with 450NB MS ERW Pipe under CAPEX Budget of F.Y. 2019-2020. 27-09-2019 Original
3954 KTPS/12351 WBPDCL/KTPS/NIT/E1386/19-20 : Supply of MS ERW Pipes & Reducer for CTMU Lines of Stg-I (Acidulation Plant,Stg-I, to Cooling Tower-1,2&3) under Approved Capex, FY:2019-20 at Kolaghat Thermal Power Station.(WBPDCL/KTPS/NIT/E1386/19-20) 27-09-2019 Original
3955 BTPS/12374 WBPDCL/BTPS/NIT/E1581/19-20 Procurement of Ring and Ball sets for EL-76 Pulverizers for Stage – I Units (2x60 MW), BTPS 27-09-2019 Original
3956 STPS/12571 WBPDCL/STPS/NIT/E1859/19-20 Supply & installation of porcelain wash basin along with extension of water line at various locations at STPS 18-09-2019 18-09-2019 Original
3957 STPS/12570 WBPDCL/STPS/NIT/E1858/19-20 Painting of Recovery Pump House & Construction of Kitchen cum Pantry Room adjacent to Recovery Pump House near Ash Pond in STPS 18-09-2019 18-09-2019 Original
3958 STPS/12569 WBPDCL/STPS/NIT/E1860/19-20 Painting of Ash conveying steel pipe rack along with the extension parts from FAE tower near Vacuum Pump House of Unit #6 to Silo of STPS 18-09-2019 18-09-2019 Original
3959 CORP/12271 WBPDCL/CORP/NIT/E1269/19-20 INSTALLATION OF NEW PRE-TREATMENT SYSTEM WITH TWO NUMBERS (02) CLARIFLOCULATOR of 210 MW UNITS (#1, #2 & #3) OF KOLAGHAT THERMAL POWER STATION (WBPDCL) 21-10-2019 Original
3960 CORP/12270 WBPDCL/CORP/NIT/E1265/19-20 Hiring of two (02) A.C four wheeler vehicle for Gangaramchak & gangaramchak-Bhadulia Coal Mine under WBPDCL 18-09-2019 Original