The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
3921 | BkTPP/12344 | WBPDCL/BKTPP/NIT/E1383/19-20 | Supply of Steel Tubular Pole | 28-09-2019 | Original | ||
3922 | STPS/12583 | WBPDCL/STPS/NIT/E1877/19-20 | Procurement of Upper & Lower Journal Bearing for Unit-5&6 XRP-883 Coal Mill OH and general maintenance under B&A dept., STPS. | 16-10-2019 | Original | ||
3923 | STPS/12582 | WBPDCL/STPS/NIT/E1876/19-20 | Procurement of spares for Bowl Mill XRP-883 for regular & overhauling maint. under BMD, STPS. | 17-10-2019 | Original | ||
3924 | CORP/12274 | WBPDCL/CORP/NIT/E1272/19-20 | Evacuation OF ASH from ASH POND No-1/ASH POND No.-2, Transportation, Disposal in eco-friendly manner at Santaldih Thermal Power Station | 18-10-2019 | Original | ||
3925 | CORP/12273 | WBPDCL/CORP/NIT/E1262/19-20 | FLUE GAS DE-SULPHURISATION PACKAGE 7 UNITS OF 2 PROJECTS {{BAKRESWAR THERMAL POWER STATION (5*210 MW) SANTALDIHI THERMAL POWER STATION (2*250 MW)}}THROUGH BULK TENDERING TURNKEY PACKAGE | 25-10-2019 | 18-11-2019 | Original | |
3926 | BkTPP/12343 | WBPDCL/BKTPP/NIT/E1388/19-20 | ANNUAL MAINTENANCE CONTRACT FOR OPERATION & MAINTENANCE OF VARIOUS MACHINES AT WORKSHOP, BKTPP | 16-10-2019 | Original | ||
3927 | STPS/12581 | WBPDCL/STPS/NIT/E1874/19-20 | Procurement of Boiler Tube Guard of different size Material SS-304 for Unit-6 Boiler OH Aug-20 under B&A. dept.,STPS | 16-10-2019 | Original | ||
3928 | STPS/12580 | WBPDCL/STPS/NIT/E1868/19-20 | 18-10-2019 | 18-10-2019 | Original | ||
3929 | BkTPP/12342 | WBPDCL/BKTPP/NIT/E1365/19-20 | EARTHWORK FOR LOCAL DEPRESSION AND SUBSIDENCE ZONE IN EARTHEN DAM,BKTPP (PHASE-I) | 16-10-2019 | Original | ||
3930 | STPS/12579 | WBPDCL/STPS/NIT/E1872/19-20 | Construction of two storey contractors' hutment at STPS. | 27-09-2019 | 27-09-2019 | Original | |
3931 | BkTPP/12341 | WBPDCL/BKTPP/NIT/E1382/19-20 | COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR FOUR NUMBERS OTIS MAKE ELEVATORS AT BKTPP | 15-10-2019 | Original | ||
3932 | STPS/12578 | WBPDCL/STPS/NIT/E1857/19-20 | Procurement of CEP's consumable spares, under T&A Dept., STPS | 21-10-2019 | Original | ||
3933 | BTPS/12380 | WBPDCL/BTPS/NIT/E1585/19-20 | Annual Rate Contract for Overhauling of TW Screen, RCW Pump, Screen wash Pump and periodical checking and jamming of TW Screen rectification of unit 1, 2 and 5, BTPS | 17-10-2019 | Original | ||
3934 | STPS/12577 | WBPDCL/STPS/NIT/E1856/19-20 | Procurement of one Portable Particle Counter for Contamination Analysis of Lub Oil (NAS Value)under Chemical laboratory, STPS. | 30-09-2019 | Original | ||
3935 | BkTPP/12340 | WBPDCL/BKTPP/NIT/E1387/19-20 | ANNUAL RATE CONTRACT FOR MAJOR CHUTE MAINTENANCE JOB AT CHP OF BKTPP | 15-10-2019 | Original | ||
3936 | KTPS/12355 | WBPDCL / KTPS / NIT /E-1388/19-20 | Supply of Globe Valves for CTMU Lines Stg-I under Capex, FY:2019-20.(2019_WBPDC_244588_1).WBPDCL / KTPS / NIT /E-1388/19-20 | 16-10-2019 | Original | ||
3937 | BkTPP/12339 | WBPDCL/BKTPP/NIT/E1384/19-20 | OVERHAULING OF (NON PRESSURE PARTS) RECUPERATIVE AIR PRE HEATER, COAL & OIL BURNER, WIND BOX, SADC & BURNER TILT OF 210MW BOILER OF UNIT#1 BKTPP. | 26-09-2019 | 26-09-2019 | Original | |
3938 | BkTPP/12338 | WBPDCL/BKTPP/NIT/E1385/19-20 | OVERHAULING OF BOILER AIR & FLUE GAS DUCTS AND EXPANSION BELLOWS OF 210 MW BOILER OF UNIT#1, BKTPP | 26-09-2019 | 26-09-2019 | Original | |
3939 | BkTPP/12337 | WBPDCL/BKTPP/NIT/E1386/19-20 | INSULATION AND REFRACTORY JOB DURING UNIT – 1 BOILERS OVERHAULING AT BKTPP | 26-09-2019 | 26-09-2019 | Original | |
3940 | BTPS/12379 | WBPDCL/BTPS/NIT/E1584/19-20 | Various Civil Works (Gr. B) at BTPS Township for E, EN, F, FN & CE Type building and other building and structures. | 26-09-2019 | Original | ||
3941 | BTPS/12378 | WBPDCL/BTPS/NIT/E1583/19-20 | P-way linking with fittings for renovation of existing rail track of BTPS (Phase-I). | 26-09-2019 | Original | ||
3942 | STPS/12576 | WBPDCL/STPS/NIT/E1863/19-20 | Procurement of Insulation Materials for Unit-6 Boiler Overhauling Aug-20 under B&A, dept., STPS. | 24-09-2019 | Original | ||
3943 | KTPS/12354 | GM(K)/CC/TM/3214/E1384/19-20 | Replacement of Hot Water Distribution Pipe of One Cooling Tower (Stg.-I) at KTPS under CAPEX Budget of FY: 2019-2020 | 28-09-2019 | Original | ||
3944 | KTPS/12353 | GM(K)/CC/O & E/3213/E1382/19-20 | COAL MILL PERFORMANCE TEST OF STG-1&2 OF KTPS UNDER O&E DEPTT. | 28-09-2019 | Original | ||
3945 | STPS/12575 | WBPDCL/STPS/NIT/E1867/19-20 | Restoration job of 14 no’s Deluge Valve system in U#5 Coal Bunker , Turbine , Boiler and DG Set area under F&S Dept. | 03-10-2019 | Original | ||
3946 | STPS/12574 | WBPDCL/STPS/NIT/E1869/19-20 | Procurement of Bearings for Overhauling of U#5 415V LT Motors under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. | 20-09-2019 | 20-09-2019 | Original | |
3947 | STPS/12573 | WBPDCL/STPS/NIT/E1851/19-20 | ARC for attending Boiler Tube Leakage and other allied works & High pressure welding jobs of B&A , T&A & C&I dept. of 250 MW unit #5 & 6 of STPS, WBPDCL | 30-09-2019 | 30-09-2019 | Original | |
3948 | BTPS/12377 | WBPDCL /BTPS/NIT/E1580/19-20 | Removing sludge from septic tank, soak well etc. at BTPS Township | 26-09-2019 | Original | ||
3949 | BTPS/12376 | WBPDCL /BTPS/NIT/E1575/19-20 | Supply of workers for Repair and maintenance of drinking water pipeline at BTPS Township | 26-09-2019 | Original | ||
3950 | STPS/12572 | WBPDCL/STPS/NIT/E1864/19-20 | Procurement of LT Underground Cables for replacement of existing Overhead 415V Distribution lines inside STPS Township under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL. | 26-09-2019 | 26-09-2019 | Original | |
3951 | BTPS/12375 | WBPDCL/BTPS/NIT/E1582/19-20 | Annual Maintenance Contract of Desktops, Printers & other IT related peripherals at BTPS | 26-09-2019 | Original | ||
3952 | CORP/12272 | WBPDCL/CORP/NIT/E1270/19-20 | Erection of R.C.C. Boundary Pillars to cordon off 20.40 Ha land within mining lease area of 846.93 Ha of non-forest land of Pachhwara (North) coal mine in districts of Jharkhand | 20-09-2019 | Original | ||
3953 | KTPS/12352 | GM(K)/CC/TM/3215/E1385/19-20 | Replacement of the existing MSRL Pipes of 03 nos. CTMU Lines from Acidulation Plant (Stg.-I) to CTs 1, 2 &3 with 450NB MS ERW Pipe under CAPEX Budget of F.Y. 2019-2020. | 27-09-2019 | Original | ||
3954 | KTPS/12351 | WBPDCL/KTPS/NIT/E1386/19-20 | : Supply of MS ERW Pipes & Reducer for CTMU Lines of Stg-I (Acidulation Plant,Stg-I, to Cooling Tower-1,2&3) under Approved Capex, FY:2019-20 at Kolaghat Thermal Power Station.(WBPDCL/KTPS/NIT/E1386/19-20) | 27-09-2019 | Original | ||
3955 | BTPS/12374 | WBPDCL/BTPS/NIT/E1581/19-20 | Procurement of Ring and Ball sets for EL-76 Pulverizers for Stage – I Units (2x60 MW), BTPS | 27-09-2019 | Original | ||
3956 | STPS/12571 | WBPDCL/STPS/NIT/E1859/19-20 | Supply & installation of porcelain wash basin along with extension of water line at various locations at STPS | 18-09-2019 | 18-09-2019 | Original | |
3957 | STPS/12570 | WBPDCL/STPS/NIT/E1858/19-20 | Painting of Recovery Pump House & Construction of Kitchen cum Pantry Room adjacent to Recovery Pump House near Ash Pond in STPS | 18-09-2019 | 18-09-2019 | Original | |
3958 | STPS/12569 | WBPDCL/STPS/NIT/E1860/19-20 | Painting of Ash conveying steel pipe rack along with the extension parts from FAE tower near Vacuum Pump House of Unit #6 to Silo of STPS | 18-09-2019 | 18-09-2019 | Original | |
3959 | CORP/12271 | WBPDCL/CORP/NIT/E1269/19-20 | INSTALLATION OF NEW PRE-TREATMENT SYSTEM WITH TWO NUMBERS (02) CLARIFLOCULATOR of 210 MW UNITS (#1, #2 & #3) OF KOLAGHAT THERMAL POWER STATION (WBPDCL) | 21-10-2019 | Original | ||
3960 | CORP/12270 | WBPDCL/CORP/NIT/E1265/19-20 | Hiring of two (02) A.C four wheeler vehicle for Gangaramchak & gangaramchak-Bhadulia Coal Mine under WBPDCL | 18-09-2019 | Original |