The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | E-Tender | ||
---|---|---|---|---|---|---|---|---|---|
4761 | BkTPP/12196 | WBPDCL/BKTPP/NIT/E1236/18-19 | ANNUAL MAINTENANCE CONTRACT FOR OPERATION AND TIT-BIT MAINTENANCE OF UNIT - 1 TO 5 SOOT BLOWING SYSTEMS OF BKTPP | 27-09-2018 | 27-09-2018 | Original | Go To E-Tender Portal | ||
4762 | BkTPP/12195 | WBPDCL/BKTPP/NIT/E1235/18-19 | ANNUAL MAINTENANCE CONTRACT FOR OPERATION AND TIT-BIT MAINTENANCE OF UNIT–4 & 5 MILL REJECTS SYSTEMS OF BKTPP | 27-09-2018 | 27-09-2018 | Original | Go To E-Tender Portal | ||
4763 | BkTPP/12194 | WBPDCL/BKTPP/NIT/E1239/18-19 | OVERHAULING OF BOILER AIR & FLUE GAS DUCTS AND EXPANSION BELLOWS OF 210 MW BOILER OF UNIT#3, BKTPP | 27-09-2018 | 27-09-2018 | Original | Go To E-Tender Portal | ||
4764 | BkTPP/12193 | WBPDCL/BKTPP/NIT/E1238/18-19 | OVERHAULING OF BOILER PRESSURE PARTS, HP VALVES, SAFETY VALVES & SOOT BLOWER PART OF 210MW BOILER OF UNIT#3 BKTPP | 27-09-2018 | 27-09-2018 | Original | Go To E-Tender Portal | ||
4765 | BkTPP/12192 | WBPDCL/BKTPP/NIT/E1237/18-19 | OVERHAULING OF COAL BURNER, WIND BOX, SADC, RECUPERATIVE AIR PRE HEATER & BURNER TILT OF 210MW BOILER OF UNIT#3 BKTPP | 27-09-2018 | 27-09-2018 | Original | Go To E-Tender Portal | ||
4766 | BTPS/12245 | Repairing & Insulation work on different pipe lines & repairing of boiler casing of Unit#1 during unit overhauling under B&A(Stage-I) BTPS, WBPDCL | 27-09-2018 | Original | Go To E-Tender Portal | ||||
4767 | BTPS/12244 | Procurement of 02 sets of 60 kg CMS fan shaped turn out for Marshalling yard, BTPS | 26-09-2018 | Original | Go To E-Tender Portal | ||||
4768 | KTPS/12178 | WBPDCL/Tend-Adv/CC/18-19/268/KTPS dt. 08.08.18 | INVITATION FOR COMPETITIVE BIDS FOR SUPPLY & DELIVERY of 02 nos. Electric Powered Forklift (capacity of 3 MT each) along with 01 no. Battery Charger, Mandatory spares and AMC for 05 Years at KTPS. | 17-09-2018 | 24-09-2018 | Original | Go To E-Tender Portal | ||
4769 | STPS/12309 | WBPDCL/STPS/NIT/E1587/18-19 | Procurement for 4 sets of Energy Efficient FRP blades with hub & 5 set of Carbon Fibre Drive shaft for Unit-5 Gammon make Cooling Tower Under T&A Dept. | 24-09-2018 | Original | Go To E-Tender Portal | |||
4770 | BkTPP/12190 | Deployment of Manpower for Clinker Breaking job of Boiler and repairing / refurbishment job of AHP at BkTPP | 24-09-2018 | Original | Go To E-Tender Portal | ||||
4771 | STPS/12307 | WBPDCL/STPS/NIT/E1577/18-19 | Annual Maintenance Contract for Electrical Maintenance jobs under the scope of EM-OPH (Township) Dept, STPS. | 22-09-2018 | 22-09-2018 | Original | Go To E-Tender Portal | ||
4772 | KTPS/12173 | Annual Rate Contract for running and upkeepment of KTPS Guest House. | 22-09-2018 | Original | Go To E-Tender Portal | ||||
4773 | BkTPP/12191 | Overhauling of Ash handling Plant of Unit # 3 of BkTPP | 22-09-2018 | Original | Go To E-Tender Portal | ||||
4774 | STPS/12303 | Repairing and painting of D & E-Type Qtrs. within STPS (T) Renovation of Fire Brigade Building at STPS Construction of 02 nos. cycle stand at PH lift block and DM Plant area with leveling of roof of clarified water sump of U#6 along with miscellaneous civil works at ETP and DM Plant areas of STPS Construction of RCC road in the stretch of 1190.75W beside TP-37 and stretch near CHP control building of STPS | 21-09-2018 | Original | Go To E-Tender Portal | ||||
4775 | STPS/12308 | WBPDCL/Tend-Adv/CC/18-19/319/STPS | Arrangement of suitable agency for Periodical Health Check-up of Employees Attached to STPS | 11-09-2018 | 20-09-2018 | Original | Go To E-Tender Portal | ||
4776 | SgTPP/12228 | Procurement of CCTV Cameras with NVR and HDD for Sagardighi Thermal Power Project, WBPDCL | 20-09-2018 | Original | Go To E-Tender Portal | ||||
4777 | SgTPP/12227 | Procurement of Grinding Elements for Coal Mill ZGM-123NforSagardighi Thermal Power Project, WBPDCL | 20-09-2018 | Original | Go To E-Tender Portal | ||||
4778 | BTPS/12241 | Operation and Maintenance job contract of 2 No X 730 KVA Old and Operation contract of 1 x 725 KVA New DG Set of Unit 1 to 5, BTPS for 12 months | 20-09-2018 | Original | Go To E-Tender Portal | ||||
4779 | SgTPP/12230 | WBPDCL/Tend-Adv/CC/18-19/323/SgTPP | Annual Rate Contract for Chute Maintenance and other Fabrication, Erection jobs at CHP Stage –I & II, SgTPP for One (01) year with a Provision of Repeat Contract for another Six Months | 19-09-2018 | Original | Go To E-Tender Portal | |||
4780 | BTPS/12242 | Repairing of Coal Bunkers of Unit No. # 5 with MS/SS lining in Slope Portion during Unit # 5 overhauling under B&A (5th Unit), BTPS, WBPDCL | 19-09-2018 | Original | Go To E-Tender Portal | ||||
4781 | BTPS/12240 | Procurement of Ring & Ball sets for 8.5E9 Coal Mill for Unit No. 5 (1X210 MW), BTPS | 19-09-2018 | Original | Go To E-Tender Portal | ||||
4782 | SgTPP/12226 | Procurement of 200W LED High Bay Light Set for Sagardighi Thermal Power Project, WBPDCL | 18-09-2018 | Original | Go To E-Tender Portal | ||||
4783 | STPS/12310 | WBPDCL/STPS/NIT/E1575/18-19 | Procurement of Various types of Compressed Asbestos Jointing Sheets, Tape and Rope /Cloth for APH, Mill, and CCP & Fan maint job during Unit # 5 shut down in Dec-2018 under BMD | 17-09-2018 | Original | Go To E-Tender Portal | |||
4784 | BTPS/12243 | Sinking of 01(ONE) no. Deep tube well pump at BTPS Township | 17-09-2018 | Original | Go To E-Tender Portal | ||||
4785 | STPS/12306 | WBPDCL/STPS/NIT/E1576/18-19 | Annual Rate Contract for online steam / water leak sealing job for Unit 5 & 6 under B&A dept. , STPS, WBPDCL | 15-09-2018 | 15-09-2018 | Original | Go To E-Tender Portal | ||
4786 | STPS/12304 | ARC for Maintenance of 10 no. of Refrigerant type Air Driers of Compressor of Unit # 5 & 6 under B&A and AHP Dept., STPS, WBPDCL | 14-09-2018 | Original | Go To E-Tender Portal | ||||
4787 | BTPS/12239 | Annual job contract for Coal Sample Collection, First Stage Coal Sample Preparation at BTPS Chemical Laboratory | 14-09-2018 | Original | Go To E-Tender Portal | ||||
4788 | STPS/12305 | Procurement of Spares for Bowl Mill XRP-883 for regular & overhauling maint. of Mill under BMD, Santaldih T.P.S., the WBPDCL | 11-09-2018 | Original | Go To E-Tender Portal | ||||
4789 | SgTPP/12225 | Painting of Conveyor 5A/B and 6A/B superstructures of Phase -1, SgTPP, WBPDCL | 11-09-2018 | Original | Go To E-Tender Portal | ||||
4790 | BTPS/12238 | Annual Service Contract for the job of Electrical and C&I of ESP & AHP maintenance by deploying suitable Manpower at Unit No. 5 under AHP(E/M) Dept., BTPS | 11-09-2018 | Original | Go To E-Tender Portal | ||||
4791 | STPS/12294 | Construction of one IA compressor and its associate equipment room beside Vacuum Pump House of Unit # 6 at STPS | 11-09-2018 | Original | Go To E-Tender Portal | ||||
4792 | STPS/12293 | Construction of two nos. Emergency Fire Exit Stair for Technical Building and Administrative Building of STPS | 11-09-2018 | Original | Go To E-Tender Portal | ||||
4793 | STPS/12300 | Electrical jobs of contractor worker canteen beside 498N Road near new raw water pond under OPH(EM),STPS | 10-09-2018 | Original | Go To E-Tender Portal | ||||
4794 | BTPS/12237 | Construction of I) Shed over Plant Gate No. 3, II) Inspection Room/Frisking Room and III) Extension of existing time office at 1st. floor level for Security Personnel B.T.P.S | 10-09-2018 | Original | Go To E-Tender Portal | ||||
4795 | BTPS/12236 | Sweeping and cleaning of the Power House Building and other Buildings at BTPS Plant Site (Gr.-A) | 10-09-2018 | Original | Go To E-Tender Portal | ||||
4796 | BTPS/12235 | Rate Contract for Pathological, Bio-Chemical, Radiological, Ultra Sound, Echo, Scan etc. Investigations of Employees Posted at Bandel Thermal Power Station (BTPS) and their dependents | 10-09-2018 | Original | Go To E-Tender Portal | ||||
4797 | KTPS/12171 | Operation of unloading of Fly ash from Main silos (any three out of five) to Bowser, KTPS | 10-09-2018 | Original | Go To E-Tender Portal | ||||
4798 | BkTPP/12189 | Dismantling of Existing Ash Slurry Discharge Lines and erection of New Ash Slurry Pipe Lines in the same position for 2nd Ash Pond of BkTPP | 09-09-2018 | Original | Go To E-Tender Portal | ||||
4799 | SgTPP/12224 | Concreting both side of cable tray running from TP-13 to TP-14 & to next road crossing near CHP Stage-II area at SgTPP | 08-09-2018 | Original | Go To E-Tender Portal | ||||
4800 | STPS/12299 | Procurement of EHV grade Transformer Oil under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL Procurement of AC Single Phase Energy Meters under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL Procurement of Main Switches, Change-over Switches & Electrical Distribution Boards under EM(OPH) Dept., Santaldih T.P.S., the WBPDCL | 07-09-2018 | Original | Go To E-Tender Portal |