The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
4761 | KTPS/12198 | WBPDCL/KTPS/NIT/E1239/18-19 | Annual Rate contract for the job of Various day to day Departmental Job related to PCI from U#1 to U#6 including OPH area & short shut down under PCI,KTPS. | 10-11-2018 | Original | ||
4762 | BkTPP/12214 | WBPDCL/BKTPP/NIT/E1212/18-19 | Annual Contract for uprooting of bushes, shrubs and cutting of grasses etc including cleaning and disposing the same outside township premises, BKTPP | 13-11-2018 | Original | ||
4763 | BkTPP/12213 | WBPDCL/BKTPP/NIT/E1255/18-19 | Annual Maintenance Contract for different buildings of MP-1, 2, 3, CHP, Simulator building, roads inside plant and minor Civil construction at BkTPP | 14-11-2018 | Original | ||
4764 | BkTPP/12212 | WBPDCL/BKTPP/NIT/E1256/18-19 | ANNUAL CONTRACT FOR HOUSEKEEPING WORK AT HOUSEKEEPING WORK AT POWERHOUSE, ESP FLOORS AND ESP CONTROL ROOM BUILDINGS, ID FAN AREAS, ROADS FROM MILL BAY TO ID FAN FROM UNIT I TO V, GCR BUILDING, STORE BUILDINGS, TIME OFFICE & SECURITY BUILDING, CANTEEN BUIL | 15-11-2018 | Original | ||
4765 | BkTPP/12211 | WBPDCL/BKTPP/NIT/E1251/18-19 | SUPPLY OF PIPES | 12-11-2018 | Original | ||
4766 | BkTPP/12210 | WBPDCL/BKTPP/NIT/E1250/18-19 | SUPPLY OF NAS (NATIONAL AEROSPACE STANDARD) VALUE DETERMINATOR FOR OIL | 13-11-2018 | Original | ||
4767 | BkTPP/12209 | WBPDCL/BKTPP/NIT/E1248/18-19 | SUPPLY OF WDA (WEAR DEBRIS ANALYSIS) INSTRUMENT | 13-11-2018 | Original | ||
4768 | KTPS/12197 | WBPDCL/KTPS/NIT/E1241/18-19 | Rate Contract for different maintenance jobs at Coal Conveying System at CHP,KTPS on job rate basis. | 10-11-2018 | Original | ||
4769 | STPS/12324 | WBPDCL/STPS/NIT/E1605 /18-19 | Procurement of Seal Assembly for Pulveriser Hot Air Gate for Unit # 5 Overhauling in Aug-2019 under BMD, STPS. | 26-10-2018 | Original | ||
4770 | STPS/12323 | WBPDCL/STPS/NIT/E1604 /18-19 | Procurement of one set Bearing for FD Fan, PA Fan, SA Fan, & ID Fan Voith Servicing in next Boiler Overhauling in Dec-2019 under BMD, STPS. | 26-10-2018 | Original | ||
4771 | CORP/12206 | WBPDCL/CORP/NIT/E1190/18-19 | Providing Pest Control Services at Bidyut Unnayan Bhaban,WBPDCL | 15-11-2018 | Original | ||
4772 | STPS/12322 | WBPDCL/STPS/NIT /E1602/18-19 | Procurement of Portable Machine Condition Analyzer under MP Depts., Santaldih T.P.S., the WBPDCL. | 25-10-2018 | 25-10-2018 | Original | |
4773 | STPS/12321 | WBPDCL/STPS/NIT/E1608/18-19 | Annual Rate Contract for cleaning of both Power & Control Cable Trays located underground & over ground including associated Conveyor Lines, Crusher House, Stacker - cum - Reclaimer (2 nos.) and different Electrical Equipments, Motors, Panels, Junction B | 27-10-2018 | 27-10-2018 | Original | |
4774 | CORP/12204 | WBPDCL/CORP/NIT/E1198/18-19 dated.01.10.18 | One Number 140 Ton ,as per RDSO’s latest specifications , Pit Less Type Electronics In-Motion Rail Weigh Bridge | 16-11-2018 | 16-11-2018 | Original | |
4775 | CORP/12203 | WBPDCL/CORP/NIT/E1197/18-19 dated.01.10.18 | 4 Nos. Fully Electronic Pit less Road Weigh Bridges ( 60 MT cap, size 9m X 3m)(IS 1436-1991) | 16-11-2018 | 16-11-2018 | Original | |
4776 | KTPS/12196 | WBPDCL/KTPS/NIT/E1242/18-19 | Overhauling of HP Valve & Actuator of unit # 1 under B&A-I during Overhauling of U#1 scheduled on Jan,2019. | 07-11-2018 | Original | ||
4777 | CORP/12202 | WBPDCL/CORP/NIT/E1199/18-19 | INVITATION OF BIDS THROUGH E-TENDER-CUM-AUCTION FOR THE “PROCUREMENT OF 05(FIVE) NUMBERS OF SELF PROPELLED ARTICULATING BOOM LIFT FOR FIVE DIFFERENT POWER PLANTS OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED (WBPDCL)” | 14-11-2018 | Original | ||
4778 | KTPS/12195 | 219AHESC18-19CET | SUPPLY,DESIGN,INSTALLATION,TESTING,COMMISSIONING OF RACK & PINION TYPE STACK ELEVATOR FOR U# 3 CHIMNEY HEIGHT 120 M AT KTPS. | 31-10-2018 | 12-11-2018 | Original | |
4779 | KTPS/12194 | NIT NO: WBPDCL/KTPS/NIT/E1243/18-19 | Overhauling job of Wind box, Air Register, Coal burner of boiler non-pressure parts work during Overhauling of U#1 scheduled on Jan,2019. | 07-11-2018 | Original | ||
4780 | BTPS/12262 | WBPDCL/BTPS/NIT/E1465/18-19 | Annual Rate contract for Supply of Seven(7) nos. Manpower for Operation of Silo weighing System Under Operation Department, BTPS | 01-11-2018 | Original | ||
4781 | CORP/12201 | WBPDCL/CORP/NIT/E1193/18-19 | Evacuation OF ASH from ASH POND No-1, Transportation, Disposal in eco-friendly manner at Bakreswar Thermal Power Station -18 TH PHASE | 14-11-2018 | Original | ||
4782 | BTPS/12261 | WBPDCL/BTPS/NIT/E1464/18-19 | Annual Contract for the job of Checking routes, Cleaning of conveyor chutes, Crusher internals, Screen, making of gate change over etc. at CHP area, BTPS, | 30-10-2018 | Original | ||
4783 | KTPS/12193 | 252E3DS18-19GT | DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF DIGITAL AVR SYSTEM OF UNIT-1,2,3. KTPS. | 12-10-2018 | 01-11-2018 | Original | |
4784 | BkTPP/12208 | WBPDCL/BKTPP/NIT/E1249/18-19 | ERECTION OF NEW HYDRANT & SPRAY LINE AT SWITCH-YARD OF BKTPP | 13-11-2018 | Original | ||
4785 | STPS/12320 | WBPDCL/STPS/NIT/E1600/18-19 | Bi Annual Rate Contract(ARC) for maintenance of 300NB Ash slurry pipe lines from outside plant boundary to Ash ponds -1/2 of Unit # 5 & 6 under AHP(M/ M), STPS. | 27-10-2018 | 27-10-2018 | Original | |
4786 | BkTPP/12207 | WBPDCL/BKTPP/NIT/E1252/18-19 | Taking delivery of dry fly ash from the silos of Bakreswar Thermal Power Station | 31-10-2018 | 13-11-2018 | Original | |
4787 | BTPS/12260 | WBPDCL/BTPS/NIT/E1426/18-19 | Supply & stacking properly of stone ballast (50 mm. size), stone dust at BTPS marshalling yard | 31-10-2018 | Original | ||
4788 | KTPS/12192 | 103BIMS18-19GT | Design, Manufacture, Assembly, Testing at manufacturer’s works, Supply & Delivery of Grinding Ring & Hi-Chrome Balls for 8.5E(10) Coal Mill. | 12-10-2018 | 01-11-2018 | Original | |
4789 | CORP/12200 | WBPDCL/CORP/NIT/E1196/18-19 | “Appointment of Independent Engineer for Barjore and Gangaramchalk coal block of West Bengal Power Development Corporation Limited” | 29-10-2018 | Original | ||
4790 | CORP/12199 | WBPDCL/CORP/NIT/E1195/18-19 | “Appointment of Independent Engineer for Barjora (North) coal block of West Bengal Power Development Corporation Limited” | 29-10-2018 | Original | ||
4791 | CORP/12198 | WBPDCL/CORP/NIT/E1194/18-19 | “Appointment of Independent Engineer for Pachhwara (North) coal block of West Bengal Power Development Corporation Limited” | 29-10-2018 | Original | ||
4792 | BTPS/12259 | WBPDCL/BTPS/NIT/E1448/18-19 | Servicing of Boiler Front & Windbox of Unit No.1 during overhauling | 30-10-2018 | Original | ||
4793 | SgTPP/12242 | WBPDCL/SGTPP/NIT/E1196/18-19 2018-09-16 12:18:40 | Annual electrical maintenance contract of Stag - I ( 2 x 300 MW) SgTPP for One (01) year | 29-10-2018 | 29-10-2018 | Original | |
4794 | BTPS/12258 | WBPDCL/BTPS/NIT/E1460/18-19 | AMC of Boiler & Auxilliaries of Unit#5 for 1(one) year | 30-10-2018 | Original | ||
4795 | CORP/12197 | WBPDCL/CORP/NIT/E1183/18-19 | Group health (Floater) insurance policy for Group Tailor Made Loss Recovery Scheme for ON-ROLL employees of the West Bengal Power Development Corporation Limited | 30-10-2018 | Original | ||
4796 | SgTPP/12241 | WBPDCL/SGTPP/NIT/E1197/18-19 | Procurement of Steel Material for CHP Stage II for Sagardighi Thermal Power Project, WBPDCL | 10-10-2018 | Original | ||
4797 | BkTPP/12206 | WBPDCL/BKTPP/NIT/E1244/18-19 | SUPPLY OF MS PIPES FOR AHP | 09-10-2018 | Original | ||
4798 | BkTPP/12205 | WBPDCL/BKTPP/NIT/E1246/18-19 | SUPPLY OF PIPES FOR SPRINKLER SYSTEM OF OLD ASH POND | 09-10-2018 | Original | ||
4799 | BkTPP/12204 | WBPDCL/BKTPP/NIT/E1245/18-19 | SUPPLY OF MS CHECKER PLATE, PLATES, ANGLES, CHANNELS & GRATINGS | 09-10-2018 | Original | ||
4800 | KTPS/12191 | NIT NO: WBPDCL/KTPS/NIT/1230/18-19 | Annual Rate Contract for Providing services of 50 nos. Contractual Workers at various departments including (O&M) department at KTPS. | 22-10-2018 | Original |