The West Bengal Power Development Corporation Limited
Tender Portal
Search
Tender Portal
Sl.No | WBPDCL Ref No. | TENDER NIT No. | Tender Description | Last date of Sale of Tender Documents | Last Date of Submission of Tender | Download | |
---|---|---|---|---|---|---|---|
1241 | KTPS/12924 | WBPDCL/KTPS/NIT/E2189/22-23 | Supply & delivery of Mineral wool mattress for unit # 5 O/H at KTPS. | 13-09-2022 | Original | ||
1242 | BTPS/12863 | WBPDCL/BTPS/NIT/E2089/22-23 | Procurement of Two Nos. New Motor (3 Ph, 415V, 125 HP/90 KW, 1475 rpm) for Coal Bunker Feeding Conveyor-11A & 11B of CHP, BTPS. | 22-09-2022 | Original | ||
1243 | CORP/12572 | WBPDCL/CORP/NIT/E1580 | Appointment of Independent Engineer for coal mines of West Bengal Power Development Corporation Limited | 21-09-2022 | Original | ||
1244 | CORP/12571 | E1582 | ONLINE FORWARD AUCTION FOR Selling of “Various scrap from KOLAGHAT THERMAL POWER STATION (KTPS), WBPDCL. | 05-09-2022 | 05-09-2022 | Original | |
1245 | CORP/12570 | E1581 | ONLINE FORWARD AUCTION FOR Selling of “Various scrap from BAKRESWAR THERMAL POWER STATION (BkTPS), WBPDCL. | 01-09-2022 | 01-09-2022 | Original | |
1246 | SgTPP/12759 | WBPDCL/SGTPP/NIT/E1982/22-23 | Renovation of Ventilation supply and Extraction System at Track Hopper of Stage-I&II and TP-2 & TP-3 at Stage-I ,CHP , SGTPP | 26-09-2022 | 26-09-2022 | Original | |
1247 | SgTPP/12758 | WBPDCL/SGTPP/NIT/E1946/22-23 | Procurement of MS Gratings for Track Hoppers of Stage-I & II, CHP-MM Department, SGTPP/WBPDCL | 14-09-2022 | Original | ||
1248 | CORP/12569 | WBPDCL/CORP/NIT/E1576/P-381 | Procurement of Autodesk Civil 3D 2023 for Project & Planning Department,Corp,WBPDCL | 21-09-2022 | Original | ||
1249 | BTPS/12862 | WBPDCL/BTPS/NIT/E2080/22-23 | Proposal for placement of AMC of 2x730 KVA SKODA make D.G. set at CHP, BTPS. | 31-08-2022 | Original | ||
1250 | SgTPP/12757 | WBPDCL/SGTPP/NIT/E1933/22-23 | Annual maintenance contract regarding operation of Gate valve for smoothly distributing of drinking water at SgTPP Township for the period of two (02) years. | 19-09-2022 | Original | ||
1251 | SgTPP/12756 | WBPDCL/SGTPP/NIT/E1967/22-23 | Repairing, painting & renovation of construction building, drivers’ rest room and surrounding area at SgTPP, WBPDCL. | 19-09-2022 | Original | ||
1252 | SgTPP/12755 | WBPDCL/SGTPP/NIT/E1957/22-23 | Supply, Installation and Commissioning of Centralized Standalone disturbance recorder with all accessories for retrieving all DR data in remote PC under Testing Department, SGTPP /WBPDCL | 14-09-2022 | Original | ||
1253 | BTPS/12861 | WBPDCL/BTPS/NIT/E2084/22-23 | Supply and Erection & Commissioning of Rack & Pinion type Elevator of 120 m height for chimney of BTPS, under CAPEX 2022-23. | 14-09-2022 | Original | ||
1254 | SgTPP/12754 | WBPDCL/SGTPP/NIT/E1960/22-23 | Periodical maintenance of Raw Water Reservoir at SgTPP, Murshidabad 2022-23. | 19-09-2022 | Original | ||
1255 | KTPS/12923 | WBPDCL/KTPS/NIT/E2190/22-23 | PROCUREMENT OF 245 KV,145 KV SF6 CURRENT TRANSFORMERS UNDER EMOPH DEPT.,KTPS. | 19-09-2022 | Original | ||
1256 | KTPS/12922 | WBPDCL/KTPS/NIT/E2181/22-23 | SUPPLY OF 12 NO. DUST CONTROL UNIT FOR CHP , KTPS UNDER CAPEX,22-23. | 23-09-2022 | Original | ||
1257 | BTPS/12860 | WBPDCL/BTPS/NIT/E2088/22-23 | Jungle cutting around the premises of residential building (any type), road sides and other common places within BTPS Township area | 09-09-2022 | Original | ||
1258 | SgTPP/12753 | WBPDCL/SGTPP/NIT/E1973/22-23 | Procurement of six (6) numbers 420 KV C.T under EMOPH Department, SGTPP/WBPDCL | 20-09-2022 | Original | ||
1259 | CORP/12568 | WBPDCL/CORP/NIT/E1578/22-23 /S-587 | Proposal to conduct a topographical survey (Drone survey) of 50 Sq. Km (approx.) of Nayachar Island in the Distt. of Purba Medinipur for the proposed ultra mega solar park. | 27-08-2022 | Original | ||
1260 | BTPS/12859 | WBPDCL/BTPS/NIT/E2087/22-23 | Construction of roadside fencing for beautification and augmentation of aesthetic view of BTPS Township. | 21-09-2022 | Original | ||
1261 | SgTPP/12752 | WBPDCL/SGTPP/NIT/E1970/22-23 | ARC for Miscellaneous Work of Ash Slurry Pipe lines & Dry Ash Conveying Pipe lines of Stg-I & Stg-II | 20-09-2022 | 20-09-2022 | Original | |
1262 | BTPS/12858 | WBPDCL/BTPS/NIT/E2086/22-23 | Procurement of Caustic Soda Flakes for DM Plant, BTPS | 19-09-2022 | Original | ||
1263 | SgTPP/12751 | WBPDCL/SGTPP/NIT/E1984/22-23 | AMC for providing fire service and protection system at SGTPP,WBPDCL | 08-09-2022 | 08-09-2022 | Original | |
1264 | SgTPP/12750 | WBPDCL/SGTPP/NIT/E1886/22-23 | Condenser tube chemical cleaning followed by water jet cleaning of Unit # 3 SgTPP , WBPDCL | 10-09-2022 | 10-09-2022 | Original | |
1265 | KTPS/12921 | WBPDCL/KTPS/NIT/E2152/22-23 | Supply & delivery of 10 mm. thick MS Plate for O/H of Unit-5 at KTPS. | 07-09-2022 | Original | ||
1266 | BTPS/12857 | WBPDCL/BTPS/NIT/E2083/22-23 | Procurement of REHEATER INLET AND OUTLET COIL ASSEMBLY for Unit#2 ,BTPS. | 15-09-2022 | Original | ||
1267 | SgTPP/12749 | WBPDCL/SGTPP/NIT/E1975/22-23 | Round the clock operation of Condense Polishing Unit(CPU) of Stage-II(2X500 MW) | 19-09-2022 | 19-09-2022 | Original | |
1268 | SgTPP/12748 | WBPDCL/SGTPP/NIT/E1956/22-23 | Procurement of Softwares for C&I Stage II under CAPEX FY:22-23 | 10-09-2022 | Original | ||
1269 | SgTPP/12747 | WBPDCL/SGTPP/NIT/E1947/22-23 | Fabrication and erection of stair case at dry ash conveying pipe line AHP MM Stg II | 03-09-2022 | 03-09-2022 | Original | |
1270 | BTPS/12856 | WBPDCL/BTPS/NIT/E2082/22-23 | Proposal for Biennial Maintenance contract for Electrical Maintenance (OPH) areas of BTPS, WBPDCL | 01-09-2022 | Original | ||
1271 | KTPS/12920 | WBPDCL/KTPS/NIT/E2183/22-23 | Supply of turn out sleeper set with associated fittings, Rail and other associated fittings at KTPS under CAPEX,22-23. | 16-09-2022 | 16-09-2022 | Original | |
1272 | BTPS/12855 | WBPDCL/BTPS/NIT/E2079/22-23 | Installation of 04 numbers of Level Crossing at Wagon Trippler area of BTPS (under Capex FY 2022-23). | 08-09-2022 | Original | ||
1273 | BTPS/12854 | WBPDCL/BTPS/NIT/E2081/22-23 | Procurement of Air Pre-Heater Ferrule for Unit#5, BTPS. | 08-09-2022 | Original | ||
1274 | SgTPP/12746 | WBPDCL/SGTPP/NIT/E1969/22-23 | Operation of Stage-I(2X300MW) Condensate Polishing Unit(CPU) round the clock basis | 13-09-2022 | 13-09-2022 | Original | |
1275 | CORP/12567 | WBPDCL/CORP/NIT/E1572/P-380 | Procurement of Autodesk Civil 3D 2023 for WBPDCL Coal Mines | 09-09-2022 | Original | ||
1276 | SgTPP/12745 | WBPDCL/SGTPP/NIT/E1950/22-23 | Procurement of Idlers & Brackets for Conveyors at Stage-I, CHP-MM Department, SGTPP/WBPDCL | 08-09-2022 | Original | ||
1277 | SgTPP/12744 | WBPDCL/SG/NIT/E1958/22-23 DTD 25.07.22 | Construction of two nos structural shed... | 12-09-2022 | Original | ||
1278 | CORP/12566 | S-588, WBPDCL/CORP/NIT/E1568/22-23 Dtd:-26/07/2022 | E-tender cum Reverse Auction for Construction of earth embankment & road with paver block over WBM surface at Bankura Railway siding | 24-08-2022 | Original | ||
1279 | CORP/12565 | WBPDCL/CORP/NIT/E1573/22-23 Dtd:-05/08/2022 | urgent repair of damaged roadway for coal transportation from Gangaramchak mine to Hazratpur railway siding | 16-08-2022 | 16-08-2022 | Original | |
1280 | CORP/12564 | WBPDCL/CORP/NIT/E1571/22-23 Dtd:-02/08/2022 | CONSTRUCTION OF CONCRETE PATHWAYS AT BOTH SIDE ALONG THE RLY LINE NO 6 AT SIDING YARD OF PAKUR RLY STATION INCLUDING A LONGITUDINAL DRAIN UNDER WBPDCL IN THE DISTRICT OF PAKUR, JHARKHAND | 16-08-2022 | Original |