6561 | KTPS/10859 | AMC for (i) Horticultural and Landscaping activities at KTPS Plant ii) Horticultural and Landscaping activities at KTPS Township | 01-06-2015 | Original | Go To E-Tender Portal | ||||
6562 | BTPS/10887 | Supply of two labourers and one boat per day at Intake pump house of BTPS Removal of coal/ coal boulder, debris, coal rejection, earth etc. from unit no 1 to 5th area to outside and within plant area at BTPS | 28-05-2015 | Original | Go To E-Tender Portal | ||||
6563 | STPS/10873 | Open tender for procurement of different type of seamless SS tubes used in 250 MW units No. 5 & 6, STPS | 28-05-2015 | Original | Go To E-Tender Portal | ||||
6564 | BkTPP/10864 | Annual Maintenance Contract for Rate Contract for COAL Unloading from Wagons at Track Hopper – 1 & 2 and Wagon Tippler of BkTPP. | 22-05-2015 | 28-05-2015 | Original | Go To E-Tender Portal | |||
6565 | STPS/10861 | Overhauling of BHEL Make 250 MW ESP of Unit #5, under ESP & AHP(E/M), STPS, The WBPDCL. | 20-05-2015 | 28-05-2015 | Original | Go To E-Tender Portal | |||
6566 | BTPS/10858 | Procurement of Economiser tube for Stage- I Units (4X60 MW), BTPS | 27-05-2015 | Original | Go To E-Tender Portal | ||||
6567 | BkTPP/10843 | Pipe, MS Size-350mm ID X 1500 MTR 9.52 Th For AHP; IS:3589; Material Grade-Fe 410 MS RW Pipe, 350 NB as per IS:3589, Grade:410, Minimum Thickness 9.52 mm, Beveled End, each pipe length 11 mtr To 13 mtr (Tolerance +/-2% In total length) | 29-04-2015 | 27-05-2015 | Original | Go To E-Tender Portal | |||
6568 | STPS/10841 | Supply and Delivery of Various Rollers for CHP (M), Santaldih.T.P.S. | 15-05-2015 | 27-05-2015 | Original | Go To E-Tender Portal | |||
6569 | BTPS/10857 | The job of Overhauling of boiler and its pressure parts and high pressure jet cleaning of unit No 2 for Stage- I Units (4X60 MW), BTPS | 26-05-2015 | Original | Go To E-Tender Portal | ||||
6570 | CORP/10818 | Supply, Installation & Implementation of and Support for Enterprise Resource Planning (ERP) Solution in the WBPDCL | 27-04-2015 | 26-05-2015 | Original | Go To E-Tender Portal | |||
6571 | BTPS/10870 | Mechanical maintenance of Fly Ash handling system, Bottom Ash handling system along with Ash Silo Handling System (1-4) units on annual maintenance contract basis under B&A (1-4) Units for BTPS Maintenance of ESP & AHP (1-4) units along with Silo Station (1-5) units under ESP &AHP (E/M) on annual maintenance contract basis for BTPS | 25-05-2015 | Original | Go To E-Tender Portal | ||||
6572 | SgTPP/10867 | Procurement of 5000 litres of Hydrazine(IS : 12086-1987) for Sagardighi Thermal Power Project, WBPDCL | 25-05-2015 | Original | Go To E-Tender Portal | ||||
6573 | STPS/10848 | Tender for repairing 9 (Nine) no.s of drum pulleys for CHP,STPS | 12-05-2015 | 23-05-2015 | Original | Go To E-Tender Portal | |||
6574 | BkTPP/10869 | Repairing work for Bituminous road at different location within township. | 19-05-2015 | 22-05-2015 | Original | Go To E-Tender Portal | |||
6575 | BkTPP/10865 | Tender Notice for Overhauling of BHEL make ESP, Ash handling Plant and C&I related job of Unit# 4 of BkTPP. | 18-05-2015 | 22-05-2015 | Original | Go To E-Tender Portal | |||
6576 | STPS/10851 | Annual Rate Contract for Unloading of LDO / LVFO Railway Oil Tanker and / or Petroleum Oil Road Tanker and Transferring the LDO / LVFO to the Oil storage tank for Two years under C&FE Deptt., STPS. | 19-05-2015 | 22-05-2015 | Original | Go To E-Tender Portal | |||
6577 | STPS/10846 | Renewing of the approach road towards Old Intake Pump House from near Talgoria bridge with Water Bound Macadam Course (about 350 meter long) including repairing of the interior and outer drains, painting of the fencing and boundary wall of the Intak | 15-05-2015 | 21-05-2015 | Original | Go To E-Tender Portal | |||
6578 | BkTPP/10840 | Annual Rate Contract of Insulation Jobs of Boiler & Turbine Area of Unit#1,2,3,4,5 .of Bakreswar Thermal Power Project | 15-05-2015 | 21-05-2015 | Original | Go To E-Tender Portal | |||
6579 | STPS/10830 | Annual Rate Contract for supply of Gas for refilling of empty gas cartridges / Cylinder for Firefighting System, as per Job Description. | 11-05-2015 | 21-05-2015 | Original | Go To E-Tender Portal | |||
6580 | SgTPP/10866 | Roof cleaning of various buildings inside plant premises at SgTPP, WBPDCL | 16-05-2015 | 20-05-2015 | Original | Go To E-Tender Portal | |||
6581 | BTPS/10863 | Operation of Bottom Ash handling system, Wet and Dry Fly Ash handling system, Electro Static Precipitator along with Operation of station Silo for Dry Fly Ash Handling System (1-4) units on annual rate contract basis under supervision of Operation Engineers, BTPS | 19-05-2015 | Original | Go To E-Tender Portal | ||||
6582 | SgTPP/10854 | Procurement of Gratings for Track Hopper for coal handling plant of Sagardighi Thermal Power Project, WBPDCL | 19-05-2015 | Original | Go To E-Tender Portal | ||||
6583 | BkTPP/10847 | Overhauling of Boiler & Boiler Pressure Parts, Rotary Air Pre-Heater, Coal Burners, High Pressure Valves, Safety Valves, SADC, Soot Blowers etc. of BHEL make Corner Fired 210 MW Boiler of Unit # 4 BkTPP. | 13-05-2015 | 19-05-2015 | Original | Go To E-Tender Portal | |||
6584 | STPS/10831 | ARC for Maintenance of Cooling Tower along with CT Fans of 2 X 250 MW unit of STPS, WBPDCL under M/M(T&A) Deptt | 08-05-2015 | 19-05-2015 | Original | Go To E-Tender Portal | |||
6585 | CORP/10817 | Consultancy Services for Design, Engineering and Preparation of Technical Specification for Installation of New Rotaside Wagon Tippler with side arm charger, Crusher House and conveying system at Kolaghat Thermal Power Station, Santaldih Thermal Power Station and Bakreswar Thermal Power Project including Tender evaluation, Drawing and Quality Plan approval and supervision for site erection, commissioning and PG Test’ | 24-04-2015 | 19-05-2015 | Original | Go To E-Tender Portal | |||
6586 | SgTPP/10853 | Disposal of coal from both sides of conveyor 07 at CHP area of SgTPP. | 14-05-2015 | 18-05-2015 | Original | Go To E-Tender Portal | |||
6587 | SgTPP/10839 | Maintenance and operation of three(03) numbers of BD-355 Dozers(make: BEML) & one (01) no. of Hydra(make: Escorts) and one (01) nos. of pay loader (make BEML) at SgTPP | 02-05-2015 | 18-05-2015 | Original | Go To E-Tender Portal | |||
6588 | STPS/10832 | Overhauling job of Air Preheater , Burners, SADC and Coal Carrying Pipes of 250 MW Unit #5 under M/M(B&A) Deptt. at STPS, The WBPDCL | 08-05-2015 | 18-05-2015 | Original | Go To E-Tender Portal | |||
6589 | SgTPP/10855 | Procurement of 1000 MT Sulphuric Acid(IS : 266-1993) for Sagardighi Thermal Power Project, WBPDCL | 16-05-2015 | Original | Go To E-Tender Portal | ||||
6590 | KTPS/10837 | Cleaning of Kutcha/pucca drains at KTPS Cleaning and removing of silt, ash, sludge etc. from metro-ducts, metro-drains, sump-pits of drainage pump house, sedimentation/decantation ponds as per requirement to maintain the drainage system including transportation of ash to disposal areas at KTPS Repairing and painting of structural shed over the Mechanical Exhausters under AHP of all the units # 1 to 6 at KTPS | 16-05-2015 | Original | Go To E-Tender Portal | ||||
6591 | STPS/10842 | Overhauling of Ash Handling plant of Unit #5, 250 MW under AHP(M/M), STPS, The WBPDCL. | 08-05-2015 | 15-05-2015 | Original | Go To E-Tender Portal | |||
6592 | SgTPP/10834 | Maintenance Contract for Electrical Maintenance job under the scope of CHP departments of SgTPP (2x300MW Units) | 02-05-2015 | 15-05-2015 | Original | Go To E-Tender Portal | |||
6593 | BTPS/10845 | Supply of two labourers and one boat per day at Intake pump house of BTPS Removal of coal/ coal boulder, debris, coal rejection, earth etc. from unit no 1 to 5th area to outside, within plant area at BTPS | 14-05-2015 | Original | Go To E-Tender Portal | ||||
6594 | STPS/10838 | procurement of Air Conditioning Machines under EM(OPH) Dept., Santaldih T.P.S. | 08-05-2015 | 14-05-2015 | Original | Go To E-Tender Portal | |||
6595 | STPS/10826 | Procurement of Lamps, Ballasts, Igniter etc. for maintenance of illumination system under EM(IPH) Dept., Santaldih T.P.S. | 05-05-2015 | 13-05-2015 | Original | Go To E-Tender Portal | |||
6596 | BTPS/10833 | Twelve (12) Months Rate Contract for the Job of Different Types of Maintenance Jobs at Coal Handling Plant on As and When Required Basis | 11-05-2015 | Original | Go To E-Tender Portal | ||||
6597 | KTPS/10829 | Annual Rate Contract for diff. Repairing and Maintenance jobs of Coal Burner , Coal Carrying Pipes, Coal Feeder, Coal Mill, L.O. System of Air Pre-Heater, ID/FD/PA Fans etc. of Boiler (M/s. BHEL make each 210 MW capacity) of Unit No. 5 & 6 of KTPS on job rate basis | 11-05-2015 | Original | Go To E-Tender Portal | ||||
6598 | CORP/10828 | Description of the Manpower to be deployed:- Sl.no.(1) Guest House Supervisor (Male) - 01 Sl.No.(2) Guest House Attendant–cum-Helper (Male) - 04 Sl.no.(3) Karmibandhu-(Male) - 02 | 04-05-2015 | 11-05-2015 | Original | Go To E-Tender Portal | |||
6599 | STPS/10827 | Concreting of 13 nos. tubular Street Light Poles foundation along the rail tracks adjacent to fuel oil unloading station. b) Strengthening & painting of poles and its accessories including replacement of 150 meter of cable with termination. | 30-04-2015 | 11-05-2015 | Original | Go To E-Tender Portal | |||
6600 | STPS/10824 | Overhauling job of Boiler Pressure Parts, Duct, Damper and Gate of 250 MW Unit # 5 under M/M(B&A) Deptt. at STPS, The WBPDCL | 04-05-2015 | 11-05-2015 | Original | Go To E-Tender Portal |